Loading...
HomeMy WebLinkAboutPW CNT 13-22/CHG OR 2 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue � P.O.Box 1130 � Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 Fax(920)236-5068 O HKO H ON THE WATER March 23, 2015 Mr. David Alexander Visu-Sewer, Inc. W230 N4855 Betker Drive Pewaukee, WI 53072 Re: Change Order No. 2 (Final) Contractl3-22 Dear Mr. Alexander: Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and Visu- Sewer, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, ��.-�� P���,- David C. Patek Director of Public Works DCP/Ut Enclosure: Change Order No. 2 (Final) cc: Pam Ubrig, City Clerk(w/original) Lynn Lorenson, City Attorney (w/copy) Tara Wendt, Assistant Finance Director(w/copy) File (w/original) I:�Engineering\i3-22 San Swr Lining&Lateral Replace�Project_Information\ConVact Info\Change OrdersU3-22 Page 1 of 1 Executed CO#2(Final)Ltr_3-23-15.docx TO: Visu-Sewer, fnc. CNANGE OR�ER#2 (�iNAL) W230 N4855 Betker Drive DATED: DECEMBER 19, 2014 Pewaukee, WI 53072 Your present contract with the City of Oshkosh, Contract No. 13-22, awarded October 22, 2013 is hereby amended and changed as follows: NET INCREASE TO: SECTION I!-S70RM SEWER 0.00 NE7 DECREASE TO: SECT(ON III -SANI7ARY SEWER (48,688.65) NET�ECREASE TO CONTRACT ($48,688.65j Section Ii Section 1(I {Storm) (Sanitary) Totals Bid Total $378.00 $335,434.25 $335,812.25 C.O.#1 $0.00 $209.40 $2�9.4d Previous Contract Total $378.00 $335,fi43.65 $336,021.65 C.O.#2 $0.00 ($48,688.65) {$48,688.65) Contract Totaf $378.00 $286,955.00 $287,333.00 ClTY OF OSHKOSH BY: Recommended: ---- City Man�ge -�:d -4%�---� \ � �_ ���� Director of Public Works City Cleric � � Approved and accepted: / � �� Contrackor I certify fhat provision has been made to pay#he liability that will accrus to the City of Oshfcosh, Wisconsin, under the within Change Order. ���53►���lY� Comptroller Approved s #a form: City Aft y ` CONTRACT 13-22-CHANGE ORDER#2{FiNAL) SECTfON II-STO}2M SEWER 1TEM 81D lNSTALLED NET NET UN1T �NCREASEIN DECREASElN NUMBER DESCRIPTlON UNlT QUAN7lTY QUANTlT1ES INCREASE DECREASE PRJCE CONTR,4CT CONTRACT PRICE ARfCE 2858 Furnish,insiall,mainfain, and remove Type D madified inlet protection, com lete as s ecifled Each 4 4.00 $94.50 SECTION 11-(BID I7EM 2858)-SUBTOTAL $U.00 $0.00 NET IiVCREASE TO: SECTION II $0.00 SECTION III-SANITARY SEWER lTEM� B!p INSTALL�D NE7 NET UlYIT lNCREASElN DECREASE/N NUMBER 17ESCRlPT10N UNJT qUANT1TY QUANTITJES lNCREASE DECREASE PRlCE CONTRACT CONTf2AC7 PRICE PfilCE 3000 Furnish and instaU 8" saniiary sewer relay, Linear com lete as s ecified Feet 25 44.00 19.00 $337.05 $6 403.95 3800 Abandon sanitary manholes,complete as s ecified Each 2 3.00 1.00 $2,247.00 $2,247.00 30000 Furnish and install 8" sanitary sewer CIPP lining, complefe as specified linear Feet 1,868 1,858.20 -9.80 $27.SU $270.48 30001 Furnish and install 10" sanitary sewer CIPP lining, complete as specified E.inear Feet 1,520 1,520.00 $27.00 34002 Furnish and instal!12" sanitary sewer CIPP lining, complete as specified Linear Feel 815 1,028.30 213.30 $32.00 $6,825.&0 30003 Furnish and install 15" sanitary sewer C1PP lining, complete as specified Linear Feet 340 333.10 -6.90 $41.00 $282.90 30004 Furnish and install 18" sanitary sewer CIPP lining, complete as specified Linear Feet 325 3'19.50 -5.50 $44.50 $244.75 30005 Furnish and install 8" sanitary sewer C1PP lining spot repair,complete as Linear s ecified Feet 42 30,00 -12.�0 $363.00 ($4,356.00 30006 Furnish and install 10" sanilary sewer CIPP Iining spot repair,complete as Linear s eciiied Feet 20 13.00 -7.00 $310.40 $2,170.OD 30007 Furnish 8"sanitary sewer air pressure fest,complete as s ecified Each 354 238.00 -116.00 $37.90 $4,398.40 Page 1 of 3 CQNTRACT 93-22-CHANGE pRDER#2(FlNAI.} 30008 Furnish and install 8" sanitary sewer grouting, com lete as s ecified Each 354 102.00 -252.fl0 �9.00 $252.00 30009 Furnish 10"saniiary sewer air pressure test,complete as s ecified Each 200 115.00 -85.00 $44.00 $3,740.00 30010 Furnish and install 10" sanilary sewer grouting, com lete as s ecified Each 200 80.00 -120.00 $1.00 $120.00 30011 Furnish 12"sanitary sewer air pressure test,complete as s ecified Each 150 50.00 -'f00.00 $48.00 $4,800.00 30012 Furnish and install'f2" sanitary sewer grouting, com lete as s ecifled Each 150 41.00 -109.00 $1.00 $109.00 30Q13 Furnish sanitary sewar lateral connection air pressure tesi,compiete as s ecified Each 915 47.00 -68.00 $410.00 $27,880.00) 30014 Furnish and install sanitary sewer iateral connection grouting, complete as s ecified Each 'f 15 42.fla -73.00 $1.00 $73.00 34015 Furnish sanitary sewer lateral abandonment air pressure test,complete as specified Each 100 24.00 -76.00 $150.00 $11,A00.00 30016 Furnish and inslall sanitary sewer lateral abandonment grouting,complete as s acified Each 900 24.00 -76.00 $1.00 $76.00 30017 Furnish sanitary sewer lateral launch setup, com lete as s eci�ed Each 115 101.00 -14.00 $245.06 $3,430.00 30018 Furnish televising of sanitary sewer latarals, Linear com lete as s eci(ied Feet 8,625 7,803.30 -829.70 $0.10 $82.17 30019 Furnish sanitary sawer lateral house]aunch setup, complete as speciiied Each 25 20.00 -5.00 $350.00 $9,750.00 30020 Furnish capped sanitary sewer lateral verification, com lete as s ecified Each 100 83.00 -17.00 $200.00 $3,400.00 30021 Furnish removal of protruding taps,complete as s ecified Each 5 'f2.00 7.00 $185.00 $1,295.00 30022 Furnish and install additional grout,complete as s ecified Gailons 300 2.25 -297.75 �10.00 $2,977.50 SECTION III-(BID ITEMS 3000-30022)-SUBTOTAL �16,77'1.55 (�7'1,810.20) Page 2 of 3 CONTRACT 13-22-CHANGE ORDER#2(FlNAL) ADDITIONAL WORK REQUIREl�: C.O.#2-SECTION III lTEM DESCRIPTlON UNlT B1D lIVSTALLED NE1' NET UNIT 1NCREASEIN DECREASEIN NUMBSR QUAN7ITY QUANTfTfES 1NCRFASE DECREASE PRlCE C pRr�CT CO�Rrf2AC7 1 Additional equipment, labor,and materials to repair sanitary sewer on MurdockAvenue on Lump 3/14/2014 Sum Q.aO 9.00 1.00 $'1,750.00 $i,750.00 2 Additional equipment, labor,and materials to repair sanitary sewer on Rush Avenue on 3(28/2014 Lump Sum 0.00 9,00 9.00 $2,000.00 $2,000.00 3 Additional equipment, labor,and materials to remove protruding taps on Lump Murdock Avenue Sum 0.00 1.00 1.00 $2,600.00 �2,600.00 A�DITIONAL WORK: C.O.#2-(tTEMS 1-3)-SUBTpTAL $6,350.00 $Q.00 WET DECREASE TO: SECTION III ($48,688.66} NET INCREASE TO SECTIONS Il&111 $23,121.55 NET DECREASE TO SECTIONS II&III ($71,810.20} PfET DECREASE TO CONTRACT: {$48,688.65) Page 3 of 3