Loading...
HomeMy WebLinkAbout44. 15-161 MARCH 24, 2015 15-161 RESOLUTION (CARRIED___7-0_____LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVAL OF PROFESSIONAL SERVICES AGREEMENT FOR ENVIRONMENTAL SERVICES, PERMITTING, PARKING LOT DESIGN, PREPARATION OF SPECIAL CONDITIONS FOR CONSTRUCTION DOCUMENTS, BIDDING ASSISTANCE & CONSTRUCTION MANAGEMENT FOR PROPOSED PARKING LOT IMPROVEMENTS AT EXISTING LOT ADJACENT TO THE SENIORS CENTER SOUTH WITH AECOM ($79,225.00) INITIATED BY: TRANSPORTATION DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with AECOM Technical Services for environmental services, permitting, parking lot design, preparation of special conditions for construction documents, bidding assistance & construction management for proposed parking lot improvements at existing lot adjacent to the Seniors Center South in the amount of seventy-nine thousand two hundred twenty-five dollars ($79,225.00) Acct. No. 323-1717-7216-06501 Property Improvement Fund – Parking Lot Improvements � � City of Oshkosh - Transportation Department HE WATE 926 Dempsey Trail, Oshkosh, WI 54902 (920) 232-5342 (920) 232-5343 fax MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Jim Collins., Director of Transportation DATE: March 20, 2015 RE: APPROVAL OF PROFESSIONAL SERVICES AGREEMENT FOR ENVIRONMENTAL SERVICES,PERMITTING, PARKING LOT DESIGN, PREPARATION OF SPECIAL CONDITIONS FOR CONSTRUCTION DOCUMENTS,BIDDING ASSISTANCE AND CONSTRUCTION MANAGEMENT FOR PROPOSED PARKING LOT IMPROVEMENTS AT EXISTING LOT ADJACENT TO THE SENIOR CENTER SOUTH/AECOM ($79,225) Background The Senior Center is the Senior Community Outreach Center in Oshkosh. The Senior Center Complex has two buildings (North and South) each with an associated parking lot. In fall of 2014, the consultant retained by the City to assess city parking lots assigned the Senior Center South Lot a PASER rating of 2 for its pavement condition, noting the block and alligator cracking, areas of patching and potholes, and curb and gutter settling and heaving. Based on this assessment, the consultant recommended that the Senior Center South Lot be reconstructed in 2015 as part of the 10 year pavement management plan. The Senior Center South lot is split into 2 parcels (a north and a south parcel) separated by a grass island. AECOM will design both of these lots together and base bid one parcel with an alternate to include the second. This way we can reconstruct the lot in two phases if needed based on budgetary considerations. Analysis The proposal accurately reflects the City's goals with reconstructing this lot. Under AECOM's proposed project schedule, construction bids will be opened in Mid-July. Assuming the bids for the first phase of construction are favorable, construction will occur in the late summer to early fall. An alternate bid item will cover the second phase of construction, which will allow work to start on the second part of the lot as funding is available. Fiscal Impact The proposed fee is $79,225. This project would be paid for out of the Parking Lots Improvement line item in the Capital Improvement Program (CIP), funded at$500,000 in the 2015 CIP. Please see Finance Director Larson's attached memorandum on parking lot improvement funding for more information. City of Oshkosh—Department of Transportation 1 Approval of Professional Services Agreement for Permitting,Construction Documents,Bidding and Construction Management for Proposed Parking Lot Improvements at Senior Center South/AECOM($79,225) Recommendation I recommend the Common Council approve this contract with AECOM for permitting, construction documents, bidding and construction management services for proposed parking lot improvements at Seniors Center South. Chapter 12 of the Oshkosh Municipal Code provides that professional services of a specialized nature, including engineering services, may be procured without following a competitive bidding or quotation process. In accordance with Section 12-16 of the Code, and because this professional services agreement is in excess of $75,000, we are hereby requesting Council approval of this agreement to AECOM for$79,225. Respectfully submitted, Approved: �^ � � Jim Collins Mark A. Rohloff Director of Transportation City Manager City of Oshkosh—Department of Transportation 2