HomeMy WebLinkAbout91-214 May 1, 1991 #91-214 RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE; ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT
NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that
the Waiver of Special Assessment Notices and Hearing under Section
66. 60 of the Wisconsfn Statutes, for various improvements for Pheasant
Creek Farm Plat (Lots 1-15) and Quail Run Farm Plat (Lots 1-18) , de-
scribed below is hereby accepted and approved:
Description of Premises
QUAIL RUN FARM PLAT
Lots 1-18 ( 18 Lots )
1 . SANITARY SEWER
Estimated Costs S35 , UU0
8� Engineering 5 2 , 800
Total Cost S37 , 800
Cost/Lot = $37 , 800/18
_ $ 2 , 80U
2 , WATER MAIN
Estimated Cost ' 532 , 000
8°% Enqineering 5 2 , 560
Total Cost �S34 , 5G0
Cost/Lot = $34 , 560/18
= S 1 , 920
3 . SANITARY & STORM LATERALS , WA'TER SERVICE
( 4" 5anitary Lateral , 6" ::�turm Latc�ral , 1 " Water Service )
Estimated Cost 51'7 , UU0
8`� Engineering 5 1 , 36U
Total Cost = 518 , 360
SiTL�.ail`1iE� BY
Cost/Lot = S18 , 360/18
= S 1 , U20
.
���
- 26 - ��. '1;OVEI)
�
Res 91-214
4 . STORM SEWER
Assessment = Footage as measured at setback line ( 25 ' ) x SS/foot
= 53 , 103 . 55 ft , x 55/ft .
= 515 ,517. 75
Cost/Lot = $15 , 517 . 75/18
= 5862 . 10
5 . SIDEWALK
Assume walk to be installed on all streets except West 9th
Avenue.
Assume S10/ft , cost includinq 8°% Engineering.
Lot 1 = 52 , U13 . 00
Lot 2 = 1 , 20Q. 00
Lot 3 = 665 . 10
Lot 4 = 799 . 40
Lot 5 = 593 . 30
Lot 6 = 889 . 80
Lot 7 = 1 , 314 :40
Lot 8 = 2 ,968 . 50
Lot 9 = 3 ,040 . 10
Lot 10 = 1 ,250.00
Lot 11 = 1 , 200 , 00
Lot 12 = 1 , 100 . 00
Lot 13 = 820 . 00
Lot 14 = 942 . 50
Lot 15 = 1 , 20Q . 00
Lot 16 = 1 , 222 . 6U
Lot 17 = 1 , 646 . 50
Lot 18 = 1 , 600 , 00
6 . GRADING & GKAVELING
Centerline Length = 1006 feet ( 30 foot width)
= 870 feet ( 20 foot width)
Estimate 518 . 00/foot ( 30 ' width)
512 . 00/foot ( 20 ' width)
Construction Cost = 1 , 006 x S18/ft . _ $18 , 108 . 00
8'70 x S12/ft . _ $10 , 440 . 00
$28, 548 . 00
8°� Engineering S 2 ,284 .00
Total Cost S30,832 . 00
Cost/Lot = 530, 832/1$
= 51 , 712 . 89
- 27 -
� Res 91-214
7. CONCRETE PAVING
All streets included except West 9th Avenue.
Assume 5ti5/f t . ( 30 ' width ) w/8°�� Engineering .
544/ft . ( 20 ' width ) w/8% Engineering.
Estimated Construction Cost :
1 ,006 ft . x $65/ft . = S65, 390
870 ft , x S44/ft . = 38, 280
Total Estimated Cost S103 ,670
Cost/Lot = 5103 , 670/18
_ $5 ,759 . 44
Qes�ription �, Premises
PHEASANT CREEK FARM PLAT
Lots 1-15 ( 15 Lots )
1 . SAIViTARY SEWER
Estimated Cost 520 , 000
8� Engineering S 1 , 600
Total Cost 521 ,600
Cost/Lot = 521 ,600/15
3 S 1 , 440
2 . WATER MAIN
Estimated Cost ''522 , 500
8� Engineering S � , 800
Total Cost S24 , 300
Cost/Lot = S24, 300/15
= S .1 ,620
3 . SANITARY & STORM LATERALS , WATER SERVICE
( 4" Sanitary Lateral , 6" Storm Lateral , 1 " Water Service)
Estimated Cost 512 , 500
8� Engineering S 1 , 000
Total Cost = 513 , 500
Cost/Lot = 513 , 500/15
= S 900 . 00
- 28 -
• 4 . STORM SEWER Res 91-214
Assessment = Footage as measured at setback line (25 ' ) x S5/foot
� 52 , 373 , 77 ft , x S5/ft .
= 511 , 868 ,85
Cost/Lot = 511 , 868 . 85/15
_ $791 . 26
5 . SIDEWALK .
Assume walk to be installed on all streets except West 9th
Avenue. �
Assume 510/ft , cost including 8°�o Engineering .
Lot 1 = S1 , 360 . 00
Lot 2 = 1 ,098 . 90
Lot 3 = 2 , 620 .00
Lot 4 = 1 ,05Q . 00
Lot 5 = 1 ,000 . 00
Lot 6 = 1 , 2,68 . 40
Lot 7 = 1 , 331 . 00
Lot 8 = 1 , 443 . 60
Lot 9 = 1 ,088 , 80
Lot 10 = 1 , 065 .60
Lot 11 = 2 , 300 . 40
Lot 12 = 1 , 100 , 00
Lot 13 = 1 , 203 . 20
Lot 14 = 1 , 200 . 00
Lot 15 = 1 , 500 , 00
6 . GRADING & GRAVELING
Centerline Length � 787 feet ( 30 foot or greater width)
= 521 feet ( 20 foot width)
Estimate S18 . 00/foot ( 30 ' width)
512 . 00/foot ( 20 ' width)
Construction Cost a 787 x S18/ft . = S14, 166 .00
521 x S12/ft . = S 6 ,252 .00
520, 418. 00
8� Engineering ' S 1 , 633 . 00
, -----------
Total Cost � S22 ,051 .00
Cost/Lot = $22 ,051/15
_ $ 1 , 470 . 07
7. CONCRETE PAVING
All streets included except West 9th Avenue.
Assume S65/ft . ( 30 ' width or qreater w/Enqineeringj
S44/ft . ( 20 ' width )
Estimated Construction Cost :
787 ft , x S65/ft . = , S51 , 155
521 ft , x 544/ft . = 22, 924
Total Estimated Cast S74 , 079T
Cost/Lot = S74 , 079/15
� S 4,038 . 60 - 29 -
.•
- Res 91-214
WAIVER OF SPECIAL ASSESSMENT NOTICES AND
HEARING UNDER SECTION 66 . 60, WISCONSIN STATUTES
The undersigned, owner of property benefited by the following
improvements to be made by the city of Oshkosh, Winnebago County,
state of Wisconsin, to wit :
SANITARY SEWER, WATER MAIN, SANITARY fi STORM LATERALS, WATER SERVICES,
STORM SEWER, SIDEWALK, GRADING & GRAVELING, CONCRETE PAVING
In consideration of the construction of said improvements by the
city of Oshkosh, Wisconsin, I hereby admit that such public improve-
ment will benefit said property and consent to the levying of special
assessments against th.e premises under Section 66 . 60 of the Wisconsin
Statutes for the cost of such improvements . In accordance with
Section 66. 60(18) of the Wisconsin Statutes, I hereby waive all
special assessment notices and hearings required by Section 66 .60 of
the Wisconsin Statutes; and i further agree and admit that the benefit
of my property from the construction of such improvements is in
proportion to the footage thereof:
Description of Premises
PHEASANT CREEK FARM PLAT
Lots 1-15 (15 Lots)
1 . SANITARY SEWER
Estimated Cost $20,000
8°% Engineering $ 1,600
Total Cost $21,600
Cost/Lot = $21 ,600/15
= S 1 ,440
2 . WATER MAIN
Estimated Cost $22,500
8o Engineering $ 1 ,800
TOtal COSt $24,300
Cost/Lot = $24,300/15
_ $ 1 ,620
3 . SANITARY & STORM LATERALS, WATER SERVICE
(4" Sanitary Lateral , 6" Storm Lateral , 1" Water Service)
Estimated Cost 512,500
8°-o Engineering S 1,000
Total Cost = 513,500
Cost/Lot = $13,500/15
= S 900 .00
- 29a -
� .
-' Res 91-214
4. STORM SEWER
Assessment = Footage as measured at setback line (25' ) x SS/foot
_ $2,373 .77 ft. x $5/ft .
_ $11 ,868.85
Cost/Lot = $11,868.85/15
_ $791 . 26
5 . SIDEWALK
Assume walk to be installed on all streets except West 9th
Avenue.
Assume 510/ft , cost including 8°-o Engineering.
Lot 1 = 51 ,360.00
Lot 2 = 1,098. 90
Lot 3 = 2,620.00
Lot 4 = 1 ,050. 00
Lot 5 = 1,000.00
Lot 6 = 1 ,268.40
Lot 7 = 1,331 .00
Lot 8 = 1,443 . 60
Lot 9 = 1,088.80
Lot 10 = 1,065 . 60
Lot 11 = 2,300.40
Lot 12 = 1,100.00
Lot 13 = 1 , 203 . 20
Lot 14 = 1 ,200.00
Lot 15 = 1 ,500.00
6 . GRADING & GRAVELING
Centerline Length = 787 feet ( 30 foot or greater width)
= 521 feet (20 foot width)
Estimate 518. 00/foot (30' width)
512 .00/foot (20' width)
Construction Cost = 787 x $18/ft. = 514,166 .00
521 x S12/ft. _ $ 6,252 .00
520.418.00
8o Engineering $ 1,633 .00
Total Cost $22 ,051 .00
Cost/Lot = S22,051/15
_ $ 1 ,470.07
- 29b -
� � Res 91-214
7. CONCRETE PAVING
All streets included except West 9th Avenue.
Assume S65/ft . ( 30' width or greater w/Engineering)
S44/ft . (20' width)
Estimated Construction Cost :
787 ft , x $65/ft . = $51,155
521 ft, x S44/ft. = 22,924
Total Estimated Cost $74,079
Cost/Lot = 574,079/15
_ $ 4,038.60
Signature of :
RICHARD R. MALMGREN DATE
- 29c -
' ' Res 91-214
WAIVER OF SPECIAL ASSESSMENT NOTICES AND
HEARING UNDER SECTION 66 ,60, WISCONSIN STATUTES
The undersigned, owner of property benefited by the following
improvements to be made by the city of Oshkosh, Winnebago County,
state of Wisconsin, to wit:
SANITARY SEWER, WATER MAIN, SANITARY & STORM LATERALS, WATER SERVICES,
STORM SEWER, SIDEWALK, GRADING & GRAVELING, CONCRETE PAVING
In consideration of the construction of said improvements by the
city of Oshkosh, Wisconsin, I hereby admit that such public improve-
ment will benefit said property and consent to the levying of special
assessments against the premises under Section 66 .60 of the Wisconsin
Statutes for the cost of such improvements. In accordance with
Section 66.60( 18) of the Wisconsin Statutes, I hereby waive all
special assessment notices and hearings required by Section 66 ,60 of
the Wisconsin Statutes; and i further agree and admit that the benefit
of my property from the canstruction of such improvements is in
proportion to the footage thereof :
Descrintion of Premises
QUAIL RUN FARM PLAT
Lots 1-18 (18 Lotsj
1 . SANITARY SEWER
Estimated Costs $35,000
8go Engineering $ 2,800
Total Cost $37,800
Cost/Lot = 537,800/18
= S 2,800
2 . WATER MAIN
Estimated Cost $32 ,000
8°�o Engineering $ 2,560
Total Cost $34,560
CoSt/Lot = $34,560/18
_ $ 1 ,920
3 . SANITARY & STORM LATERALS, WATER SERVICE
(4" Sanitary Lateral , 6" Storm Lateral , 1" Water Service)
Estimated Cost 517,000
8o Engineering $ 1 , 360
Total Cost = $18, 360
Cost/Lot = $18,360/18
_ $ 1 ,020
- 29d -
I j.
Res 91-214
4. STORM SEWER
Assessment = Footage as measured at setback line (25 ' ) x S5/foot
= 53 ,103 . 55 ft , x 55/ft .
_ $15,517.75
Cost/Lot = $15, 517 .75/18
= 5862. 10
5 . SIDEWALK
Assume walk to be installed on all streets except West 9th
Avenue.
Assume $10/ft , cost including 8°�o Engineering.
Lot 1 = $2,013 .00
Lot 2 = 1 ,200.00
Lot 3 = 665 . 10
Lot 4 = 799. 40
Lot 5 = 593 . 30
Lot 6 = 889.80
Lot 7 = 1 ,314.40
Lot 8 = 2,968. 50
Lot 9 = 3,440. 10
Lot 10 = 1 ,250.00
Lot 11 = 1 ,200.00
Lot 12 = 1 ,100.OQ
Lot 13 = 820.00
Lot 14 = 942. 50
Lot 15 = 1,200.00
Lot 16 = 1 ,222 . 60
Lot 17 = 1 ,646 . 50
Lot 18 = 1 ,600.00
6 , GRADING & GRAVELING
Centerline Length = 1006 feet (30 foot width)
= 870 feet (20 foot width)
Estimate 518.00/foot (30' width)
512 .00/foot ( 20 ' widthj
Construction Cost = 1 ,006 x $18/ft . _ $18, 108. 00
$70 x $12/ft . _ $10,440.00
528,548.00
8°�o Engineering $ 2 ,284.00
Total Cost $30,832 .00
Cost/Lot = $30,832/1$
_ $2 ,712 .89
- 29e -
. .
Res 91-214
7. CONCRETE PAVING
All streets included except West 9th Avenue.
Assume $65/ft . (30' width) w/8°•o Engineering.
544/ft. (20' width) w/8°% Engineering.
Estimated Construction Cost :
1 ,006 ft , x $65/ft. = $65,390
870 ft, x $44/ft. = 38,280
Total Estimated Cost $103,670
Cost/Lot = $103,670/18
_ $5 ,759 . 44
Signature of:
RICHARD R. MALMGREN DATE
- 29f -
. -
�3.
�
c
�
� N
� � �
•� � +�
c� C � c0
N � a. �
�. \d
N � N
C -I--� E
4- ••.+ C S..
O S-. � c�f
� E LL
S- N N
N S > C
> O �
•� � � �
c[3 p.
3 cn E � �.-.
41 �--� ••-� lfl
N U �O �....
> •� L � F--
0 +� +-� O' acnN
S- O •�
�t QZ 3oZf p � p
N Q -I-� � E Ol ¢ 2 Z
I C O S.. 61
r- �Zf � •'-i �6 r-
�
�k �i-� N V � z �
Q. N N �C N O �-+
N � C N r-i �'
� U N C N � F-- �
� ¢ Q U C.� � � U