HomeMy WebLinkAbout91-243 May 16, 1991 #91-243 RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: CHANGE ORDER NO. l, PUBLIC WORKS CONTRACT 91-02
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that
the following Change Order, a copy of which is attached, is hereby
approved:
BADGER LABORATORIES & ENGINEERING CO. INC.
1110 S. Oneida Street
Appleton, WI 54915
Amount decreased: $1,500.00
Purpose: Wastewater Treatment Plant bioaccumulating
Substances sampling & analysis
,n,ry-
S�ir�i;:�i��,il L
.
A T 0 f�;D
��-k��--�-----
- 22 -
• REs 91-243
C�iA1VGE Gr�Dr'�i T1G . 1
T0: BADGER LABORATORIES & ENGINEERING C0 . INC . DATyD: May 9 , 1991
1110 S . Oneida Street
Appleton , WI. 54915
Your present contract with the Citf of Cshkoshs Contract No. q1 -n9 ,
is hereby amended and changed as follows;
( insert here work and/or materials to be added or eLiminate3 and
the ur.it and/or Iump sum price to be added to or d�ducted from the
contract . ) INDUSTRIAL WASTEWATER DISCHARGE SAMPLING & ANALYSIS
REDUCTION TO ELIMINATE REQUIREMENT OF PERFORMANCE BOND .
WASTEWATER TREATMENT PLANT Bioaccumulating Substances
sampling & analysis reduced from $1 , 500 to $1 , 000 per
sample - Total reduction , $1 , 500 . 00
8ecommended ; CITY OF CSHKQSH
. �y:
Director of �ublic ��lorks Cit;� :'lanager
City C1erK
Approved and accepte� s
Contractc�^
I certify that provision has been made to pay the liability that
will accrue to the City of Oshkosh, Wisconsi�, �ander the with�n
Change Order.
� conptroller
Approved as to forme .
. C ity Attorney _ 22a _
Res 91-243
'� BA�GER LABORATORIES � ENGINEERING w°c.
ENGINEERS 1110 S. ONEIDA STREET • APPLETON, WISCONSIN 549'15 • EST. '1966
(414) 739-9213 • FAX(414) 739-5399 • 1-800-776•7196
Ma,y 3, 1991
Mr. Jerry Konrad
CITY OF OSHKOSH
- Dept. of Public Works
P.O. Box 1130 �
Oshkosh, WI 54902-1130
Dear Mr. Konrad:
Enclosed are the copies of Public S�or1:s Contract �91-02 signed and witnessed.
Per our ��}ione discussioii of A1�,y 3, I contacted an inclivicluul wit}i Insi.�rzuice Sf�rvices
of Appleton, WI who is an expert on performance bonds. His O�1I11011 was that �i bond
for this type of service work extending over 3 years would be difficult to obtain
due primarily to the 3 ye�,r time frame. In view of this, and in view of two firms
turnirig clown our request for a performance bond on t}iis contract (the firms beir�g
Crum � Forester ancl Old Republic Surety) , we respectfully request the City of
Oshkosh to delete this performa►ice bond requirement in this contract.
If the Cit,y agrees to do this, our bid price would be reduced $1500.00, th.is being
the amount included to offset the cost of the performance bond. This would L�e
reflected in reducing the WWTP Bio�LCCUmulating Subst�nces cost from $1500.00 to
$1000.00 per sample x a quantity of three.
We apologize for aiiy iiicorive►iience t11is ma�� cause the City. I f there are aiiy
questions my phone number is 1-800-776-7196.
Very Truly Yours,
BADGER LABORATORIES � ENGINEERING
WDNFt Certified Lab #445023150
�' �
//
Steph C. Ta,ylor
Chie !Chemist
SCT:sg �
Enclosure
�
WI DNR Certilied Lab X445023150 Members
WI Reg.Engineers(Corp.)MCE00601 _ ��4, _ W�Environmental Labs;Am.Chemical Sw.:
Wt Div.Heallh Cert.Lab M205,Bacteria watcr/milk u Wnler Pollution Conlrol Fod.;TAP.P,I.;
USDA Cenilied Lab M5585,Various tests lor(Meat R Poultry)loods WI Food Processors Assn.;Wisa Paper Council
� � � �� �
� o � � o �
mz rn < �
p .. � C") lD l0
.. O -�
� � n 1
l0 c-F �" N
O -G � � � � W
NN � c'�' N
--i
�� Z O
V O �
�..� . C]..
�
l0 "5
�
1 Z
O O
N •
�
"D
C
�
�
�•
n