HomeMy WebLinkAbout91-279 June 6, 1991 #91- 279 RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE; ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the Waiver of Special Assessment Notices and Hearing under Section 66. 60 of the Wisconsin Statutes, for various improvements for Abbey Avenue Extension, 475. 36' to 815' east of Graceland Drive, described below is hereby accepted and approved: Qescri�tion � �remises ABBEY AVENUE EXTENSION, 475 . 36 ' to 815 ' east of Graceland Drive , Consider two lots , one on each side of the street. Assess each side i/2 of costs . SANITARY SEWER 226 ' - 8" main @ S13 . 00 = 52,938 7.75' drop I�i @ S120 + drop = 1,080 $4,018 + 8� Engineering 321 54, 339 Cost/side = S4,339/2 � S2,169. 50 WATER MAIN 15 ' - 6" main @ S18 = S 270 340' - 8" main @ S20 = 6,800 1 - 6" valve @ 5350 = 350 i - 8" valve @ S450 = 450 Relocate hydrant @ S350 = 350 58, 220 + 8% Engineering 657 . 60 S8,877. 60 Cost/side = S8,877.60/2 = S4 ,438 .80 LATERALS (4" Sanitary, 1 1/2" Water Service ) 3 sets @ S775 � S2, 325 + 8$ Engineering 186 ' $2,511 Cost/side = $2 , 511/2 _ $1 , 255 . 50 - 35 - June 6, 1991 #91- 279 Cont'd. STORM SEWER Assessment - Frontage Cost + Yard Drain F'rontage Assessment = S5/ft , x frontage at setback = 55 x 338( 2 ) _ $3, 380 Yard Drain 31 ' - 12" storm sewer @ S14 = 5 434 1 Inlet @ $600 = 600 S1,034 + 8$ Engineering 82 ,7g S1, 116 .78 Assessment = S3 , 380 + $1 , 116 . 78 _ $4, 496 . 78 Cost/side - S2,248.39 SIDEWALK (Assume S2/sq. ft , including engineering, both sides required. ) North side 338 x S10 = $3,380 South side 338 x S10 = 3,380 GRADING & GRAVELING Estimate S18/ft. , 30' width Estimated Constrttction Cost = 338 x S18 = S6,084 + 8� Engineering = 486 . 72 $6,570.72 Cost/side = S6,570.72/2 s S3, 285. 36 CONCRETE PAVING Assume S65/ft. (30' width w/8� Enqineering) . Estimated Construction Cost = 338 x S65/ft . = S21 , 970 Cost/side = S10, 985 - 36 - � ' � Res 91-279 WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING UNDER SECTION 66 .60, WISCONSIN STATUTES The undersigned, owner of property benefited by the following improvements to be made by the city of Oshkosh, Winnebago County, state of Wisconsin, to wit: SANITARY SEWER, WATER MAIN, LATERALS, STORM SEWER, SIDEWALK, GRADING & GRAVELING, CONCRETE PAVING In consideration of the construction of said improvements by the city of Oshkosh, Wisconsin, I hereby admit that such public improve- ment will benefit said property and consent to the levying of special assessments against the premises under Section 66.60 of the Wisconsin Statutes for the cost of such improvements . In accordance with Section 66 .60(18) of the Wisconsin Statutes, I hereby waive all special assessment notices and hearings required by Section 66. 60 of the Wisconsin Statutes; and i further agree and admit that the benefit of my property from the construction of such improvements is in proportion to the footage thereof: Descri8tion g� Premises ABBEY AVEMJE EXTENSION, 475 .36' to 815' east of Graceland Drive Consider two lots, one on each side of the street, Assess each side 1/2 of costs. SANITARY SEWER 226 ' - 8" main @ S13 .00 = $2,938 7.75 ' drop MH @ $120 + drop = 1,080 $4,018 + 8°o Engineering 321 $4,339 Cost/side = 54,339/2 _ $2,169.50 WATER MAIN 15' - 6" main @ $18 = $ 270 340' - 8" main @ $20 = 6,800 1 - 6" valve @ $350 = 350 1 - 8" valve @ $450 = 450 Relocate hydrant @ 5350 = 350 $8,220 + 8°�o Engineering 657.60 $8,877.60 Cost/side = $8,877. 60/2 = 54,438.80 - 36a - � � Res 91-279 LATERALS (4" Sanitary, 1 1/2" Water Service) 3 sets � 5775 = 52,325 + 8�o Engineering 186 $2,511 Cost/side = $2,511/2 _ $1,255 .50 STORM SEWER Assessment = Frontage Cost + Yard Drain Frontage Assessment = S5/ft. x frontage at setback _ $5 x 338(2) = S3,380 Yard Drain 31 ' - 12" storm sewer @ S14 = $ 434 1 Inlet @ $600 = 600 $1,034 + 8°% Engineering 82.78 $1,116.78 Assessment = $3,380 + $1,116.78 _ $4,496.78 Cost/side = $2,248.39 SIDEWALK (Assume 52/sq.ft. including engineering, both sides required. ) North side 338 x $10 = $3,380 South side 338 x $10 = 3,380 GRADING & GRAVELING Estimate $18/ft. , 30' width Estimated Construction Cost = 338 x $18 = $6,084 + 8°�o Engineering = 486 .72 $6,570.72 Cost/side = $6,570.72/2 _ $3,285.36 - 36b - � � � Res 91-279 r CONCRETE PAVING Assume $65/ft. (30' width w/8�o Engineering) . Estimated Construction Cost = 338 x $65/ft . = S21 ,970 Cost/side = 510,985 Signature of Owner: Date: John E. Kuenzl _..r-�_ SUi:�,1i'P:ED BY �i�� ` PROVED �� -----�---___-- - 36c - � � � � •., � U C � N t--� Q Q \ N � N C �1--� c� •r+ C O S- � b E S- N � � 2 > > O •� � � tO Q 3 � � I�^ � `i v � �--) }� O . d U� N � p .� � O W W rn QZ3 � �- � >- O N Q -I-� C � dl ¢ ¢ Z I C O �j '- 025 � •� •• �k i� N U N l0 Z � Cl. � N � � � N U tn C N C �""' � � Q ¢ C� Q ''7 � U