HomeMy WebLinkAbout91-309 R E V I S E D
June 20, 1991 #91-309 RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE; ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT
NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that
the Waiver of Special Assessment Notices and Hearinq under Section
66. 60 of the Wisconsin Statutes, for various improvements for West-
field Heights (Laurie Avenue, Luke Lane, Sawtell Court) Lots 1 through
14, Outlot 1, described below is hereby accepted and approved:
Description of Premises
WESTFIELD HEIGHTS
(Laurie Avenue, Luke Lane, Sawtell Court)
Lots 1 through 14, Outlot 1
1 . SANITARY SEWER
Estimated Construction Cost = S16,950
4$ Enqineerinq Fee = 678
Cost/Lot = 5678/14
= 548. 43 (Lots 1-14 )
2. WATER MAIN
Estimated Construction Cost = 518,580
4� Enqineering Fee = 743 . 20
Cost/Lot= S743 . 20/14
= S53 . 08 (Lots i-14 )
3. SANITARY LATERAL AND WATER SERVICE
Estimated Construction Cost = S12,250
4� Engineering Fee = 490
Cost/Lot = S490/14 (Lots 1-14)
= 35 .00
SL'�.�ie�ITTED BY
.
A P 0'TED
- 27 -
Res 91-309
4. STORM SEWER
Assessmenta Footage as Measured at setback line (25 ' ) x $5/ft .
= 1,636. 23 ft, x $5/ft.
= 58,181 . 35
Cost/Lot = S8,181 . 35/14
= S584 . 37 (Lots 1-14)
5. STORM LATERAL .
(6" Storm Lateral installed to each lot under city contract )
Estimated Construction Cost= 5250
4� Engineering = S 10
Cost/Lot = 5260 (Lots 1-14)
6. GRADING & GRAVELING W/PERMANENT STREET
Assume 36' streets.
Estimate S70/ft . construction cost .
Approximate centerline length = 748 feet
( includes intersection at Westfield Street and
alignment north on Sawtell Court)
Estimated Construction Cost = 748 ft, x 570/ft.
_ $52,360
4� Engineering Fee = 52,094 .40
Cost/Lot = $2 ,094.40/14
_ $149.60 (Lots 1-14)
7. SIDEWALKS
Assume sidewalks required on all streets, across all lots
including Outlot i .
Assume S10/ft, cost w/engineering.
Lot 1 = $963 .70
Outlot 1 = $ 36. 50
Lot 2 = $464 .70
Lot 3 = $921 . 04
Lot 4 = 52,002 .80
Lot 5 = S738. 10
Lot 6 = $763 .70
Lot 7 = $485 . 30
Lot 8 = $457.80
Lot 9 = $791 . 30
Lot 10 = 52 , 486 .60
Lot 11 = $2 ,036 . 20
Lot 12 = $841 .70
Lot 13 = $850.00
Lot 14 = S2,180.90'
- 27a -
Res 91-309
WAIVER OF SPECIAL ASSESSMENT NOTICES AND
HEARING UNDER SECTION 66 . 60, WISCONSIN STATUTES
The undersigned, owner of property benefited by the following
improvements to be made by the city of Oshkosh, Winnebago County,
state of Wisconsin, to wit :
STAKING AND INSPECTION SERVICES FOR SANITARY SEWER, WATER MAIN,
SANITARY AND WATER LATERALS, GRADING AND GRAVELING WITH PAVING;
STORM SEWER AND STORM LATERALS, SIDEWALKS
In consideration of the construction of said improvements by the
city of Oshkosh, Wisconsin, I hereby admit that such public improve-
ment will benefit said property and consent to the levying of special
assessments against the premises under Section 66 . 60 of the Wisconsin
Statutes for the cost of such improvements . In accordance with
Section 66.60(18) of the Wisconsin Statutes, I hereby waive all
special assessment notices and hearings required by Section 66, 60 of
the Wisconsin Statutes; and i further agree and admit that the benefit
of my property from the construction of such improvements is in
proportion to the footage thereof :
Descri8tion ,� �remises
WESTFIELD HEIGHTS
(Laurie Avenue, Luke Lane, Sawtell Court)
Lots i through 14, Outlot 1
1 . SANITARY SEWER
Estimated Construction Cost = 516,950
4� Engineering Fee = 678
Cost/Lot = 5678/14
_ $48. 43 (Lots 1-14)
2 . WATER MAIN
Estimated Construction Cost = $18,580
4� Enqineering Fee = 743. 20
Cost/Lot= S�43 . 20/14
_ $53 .08 (Lots 1-14)
3 . SANITARY LATERAL AND WATER SERVICE
Estimated Construction Cost = $12,250
4� Engineering Fee = 490
Cost/Lot = S490/14 (Lots 1-14)
= 35 . 00
- 27b -
' Res 91-309
4. STORM SEWER
Assessment= Footage as Measured at setback line ( 25 ' ) x SS/ft.
= 1,636.23 ft, x S5/ft.
a S8,181. 35
Cost/Lot = $8, 181 . 35/14
= 5584 . 37 (Lots 1-14)
5. STORM LATERAL � �
(6" Storm Lateral installed to each lot under city contract)
Estimated Construction Cost= S250
4� Engineering � S 10
Cost/Lot = $260 (Lots 1-14)
6. GRADING & GRAVELING W/PERMANENT STREET
Assume 36' streets.
Estimate S70/ft , construction cost .
Approximate centerline length = 748 feet
( includes intersection at Westfield Street and
alignment north on Sawtell Court)
Estimated Construction Cost = 748 ft, x $70/ft.
= 552,360
4� Engineering Fee = S2 ,094 .40
Cost/Lot = 52 ,094 . 40/14
_ $149.60 (Lots 1-14)
7. SIDEWALKS
Assume sidewalks required on all streets, across all lots
including Outlot 1 .
Assume S10/ft . cost w/engineering.
Lot 1 = $963 .70
Outlot 1 a $ 36.50
Lot 2 = S464.70
Lot 3 = $921 .00
Lot 4 = S2,002 .80
Lot 5 = $738. 10
Lot 6 = 5763 .70
Lot 7 = $485. 3'0
Lot 8 = S457.80
Lot 9 = S791 .30
Lot 10 = S2 ,486.,6'0
Lot 11 = 52 ,036 , 20
Lot 12 = $841 .70
Lot 13 = $850.00
Lot 14 = $2,180.90
- 27C -
' � Res 91-309
Signature of Owner: (Heritage Homes of Oshkosh, Inc. )
John J. Mark, President
Street Address :
Date:
Siqnature of Owner:
Janice Mark, Secretary
Street Address:
Date:
Signature of Owner:
Russell A. Kuklinski
Street Address:
Date:
Signature of Owner:
Sue Kuklinski
Street Address :
Date:
- 27d -
� o c � o � � �
� —� � �•. � cn c� cn
z' �--� fC t� � fD CD •
t--� O �' (D tn '�3
p Z O t�n c+ � � �
.. ,. �• (D 1?0 —'
N O � �
G � c+ D W
Z � D l0 � L7 O
O -G � � Ll� Z"� l0
mmo � �• �• o -s
cnv, � < <+ �+ o
�. � �• <
r..--. cn c� m
�• � (D
.�..Vi O � N �
� � �
-e � �,.
O <
< 2 CD
(D N 'S
� �
CU "5 O
� r• —F�
c+ �
(/� cL] N
'�
� �--� CD
�� � n
� �..
c+ Cu
_h �--'
�.�.
(D
�--
Q