HomeMy WebLinkAboutPW CON 14-08/CHG OR 1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue � P.O.Box 1130 � Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 O HKOIH Fax(920)236-5068 ON THE WATER February 11, 2015 Stu Hietpas Donald Hietpas & Sons, Inc. PO Box 166 Little Chute, WI 54140 Re: Change Order No. 1 Contract 14-08 Dear Mr. Hietpas: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Donald Hietpas & Sons, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, . cP��� - ��� David C. Patek � Director of Public Works DCP/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, City Attorney(w/copy) Tara Wendt, Assistant Finance Director(w/copy) File (w/original) I:�Engineering�2014 CONTRACTS\14-OS Lk BDM Dr,Ryf Rd,&Edgewood Rd Wtr Mn Page 1 of 1 Loop�Project_Information\Contract Info\Change Orders\14-08 Execu[ed CO kl Ltr_2-11-15.docx TO: Danald Hietpas &Sons, Inc. CHANGE ORDER#1 PO Box 166 DATE: JANUARY 20, 2015 Litt(e Chute, WI 54140 Your present contract with fhe City of Oshkosh, Contract No. 14-08, awarded September 9, 2014, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING $3,256.20 NET INCREASE TO: SECTiON II -STORM SEWER $14,112.40 NET INCREASE TO: SECTION IV-WATER MA[N $16,351.00 NET INCREASE TO CONTRACT $33,7'[9.60 Section I Section II Section IV Paving Storm Sewer Water Main 7otals Bid Total $91,728.65 $54,142.50 $639,055.00 $784,928.15 C.O.#1 $3,256.20 $14,1'{2.40 $16,351.00 $33,719.60 Contract 7'otal $94,984.85 $68,254.90 $655,406.00 $818,645.75 CITY OF OSHKOSH BY: �_ _,/���,��� ��'-- Recommended: -..� City Manag�r � , � � , � -� �.. � . .� ; .��:� � �;1� -� ,�.�, � � � Director of Public Works City Clerk � Approved and accepfed: ��{-�A�ct hl,� Pr��,' En.�' l-�o-/S < a� � �S o ractor ! certify that provision has been tnade to pay the Ifabi[ity that wiil accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ��G �� Comptroller Approved a o form: Cit tor ey . CONTRACT 14-08-CHANGE ORDER#1 SECTION I-PAVING ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I ITEM BID INSTALLED NET NET UNIT �NCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTIT/ES INCREASE DECREASE PRICE CONTRACT CONTRACT PR/CE PRICE 10000 Additionallabor, equipment,and materials to install hot mix asphalt as temporary pavement, Square com lete as s ecified Feet 0.00 972.00 972.00 $3.35 $3,256.20 ADDITIONAL WORK: C.O.#1 -(ITEM 10000)-SUBTOTAL $3,256.20 $0.00 NET INCREASE TO: SECTION I $3,256.20 SECTION II-STORM SEWER ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION II ITEM BID INSTALLED NET NET UNIT �NCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 20000 Furnish and install Pam Covering,complete as Square s ecified Yards 0.00 1,088.00 1,088.00 $0.80 $870.40 20001 Furnish and install 8"storm sewer,complete as Linear s ecified Feet 0.00 70.50 70.50 $58.00 $4,089.00 20002 Furnish and install Type 1 inlet,complete as specified Each 0.00 3.00 3.00 $1,575.00 $4,725.00 20003 Connect to existing inlet, complete as specified Each 0.00 1.00 1.00 $450.00 $450.00 20004 Additionallabor, equipment,and materials to install sediment logs along the construction site on 10/30/14 and 10/31/14, complete as specified Lump Sum 0.00 1.00 1.00 $3,978.00 $3,978.00 ADDITIONAL WORK: C.O.#1 -(ITEMS 20000-20004)-SUBTOTAL $14,112.40 $0.00 NET INCREASE TO: SECTION II $14,112.40 SECTION IV-WATER MAIN ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION IV ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4036 Furnish and install 1"water service(relay),complete as Linear s ecified Feet 0.00 17.00 17.00 $45.00 $765.00 Page 1 of 2 _ CONTRACT 14-08-CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT �NCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4048 Furnish and install 1" corporation and stop box, com lete as s ecified Each 0.00 1.00 1.00 $340.00 $340.00 4237 Furnish and install 8"45° bend,complete as s ecified Each 0.00 2.00 2.00 $350.00 $700.00 4457 Furnish and install 16"x 10"tapping valve and sleeve,complete as s ecified Each 0.00 1.00 1.00 $5,900.00 $5,900.00 40001 Furnish and install 6"MJ anchoring coupling, com lete as s ecified Each 0.00 8.00 8.00 $195.00 $1,560.00 40002 Abandonment of 16"x 10" Lump tee,complete as specified Sum 0.00 1.00 1.00 $500.00 $500.00 40003 Additionallabor, equipment,and materials to cover stockpiled contaminated soils on 10/1/14,complete as Lump specified Sum 0.00 1.00 1.00 $950.42 $950.42 40004 Additionallabor, equipment,and materials to remove the casing pipe from the existing main at the tie-in on River Mill Road on 10/2/14,complete as Lump specified Sum 0.00 1.00 1.00 $1,427.15 $1,427.15 40005 Additionallabor, equipment,and materials to investigate the location of the water service on the WIOUWASH Trail on 10/10/14,complete as Lump specified Sum 0.00 1.00 1.00 $2,912.38 $2,912.38 40006 Additionallabor, equipment,and materials to continue investigating the location of the water service on the WIOUWASH Trail on 10/13/14,complete as Lump specified Sum 0.00 1.00 1.00 $1,296.05 $1,296.05 ADDITIONAL WORK: C.O.#1 -(ITEMS 4036-40006)-SUBTOTAL $16,351.00 $0.00 NET INCREASE TO: SECTION IV $16,351.00 NET INCREASE TO SECTIONS I,II,8�IV $33,719.60 NET DECREASE TO SECTIONS I,II,&IV $0.00 NET INCREASE TO CONTRACT: $33,719.60 Page 2 of 2