HomeMy WebLinkAbout0121503-Building (bathroom remodel) � CITY OF OSHKOSH No 121503
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 343 W 7TH AVE Owner BRENDA MOSER Create Date 09/12/2006
Designer Contractor BURDICK CONTRACTOR
Category 140-Interior Remodeling Plan
Type � Building � Sign � Canopy � Fence � Raze I
Zoning Cfass of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection 'I
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab � Pier � Other :
� Concrete Block � Post � Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
- — — __ _--
SFR/Guttm the 1st floor bathroom-new insulation,d �
Use/Nature 9 rywall,an exhaust fan,and fixtures. Also installing siding on the house and
of Work ,replacing the drop ceiling in the living room. �
'�i
j �
HVAC Contractor Plumbing Contractor M P KELLY
Electric Contractor SECKAR ELECTRIC CO INC
Fees: Valuation $10,000.00 Plan Approval $0.00 Permit Fee Paid $88.00 Park Dedication $0.00
-- - ____ `
Issued By: � �--- Date 09/12/2006 Final/O.P. 00/00/0000
❑ Permit Voided� Parcel Id#0902770000
tn the performance of this work I agree to perform all work pursuant to rutes governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to s e any ne sary prov Is before rt�ng ch activity.
Signature Date —' z �
Agent/Owner
Address 61 OTTER ST Oshkosh WI 54901 - 0000 Telephone Number 232-1231
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.