CITY OF OSHKOSH
DEPARTMENT OF PUBLIC WORKS
215 CHURCH AVENUE, P.O. BOX 1130, OSHKOSH, WI 54903-1130
PHONE: (920)236-5065 FAX (920)236-5068
LETTER OF TRANSMITTAL
To: Mr. Jim Bachhuber Date: January 26, 2015
Brown and Caidwell Sub'ect: Executed Amendment No. 1
8383 Greenway Boulevard, Suite 600 Storm Water Management Plan for
Middleton, WI 53562 Fernau Avenue Watershed
Please find: � Attached ❑ Under Separate Cover
❑ Copy of Letter ❑ Contracts � Amendment ❑ Report ❑ Agenda
❑ Meeting Notes ❑ Photos ❑ Mylars ❑ Change Order ❑ Pians
❑ Specifications ❑ Estimates ❑ Diskette ❑ Zip Disk ❑ Other
Quantit Descri tion
1 Executed Amendment No. 1
These are being transmitted as indicated below:
❑ For Approval � For Your Use ❑ As Requested ❑ For Review& Comment
Remarks:
Enclosed is a copy of the executed Amendment No. 1 for the storm water management plan for the
Fernau Avenue Watershed. Please reference Res. No. 15-09 on all of your invoices.
If you have any questions, please contact us.
City Attorney's Office—Copy `_____
City Clerk's Office —Original
cc: _ File—Original Signed:
Tracy . Taylor
I:1Engineering\Storm Water Iniormation\Fernau Avenue Watershed\SWMP RFP Materialsl8&C LOT-Executed CA#1-SWMP 1-26-15.docx
S
AMENDMENT NO. 1
The CITY OF OSHKOSH, hereinafter referred to as CITY, and BROWN AND
CALDWELL, 8383 Greenway Boulevard, Suite 600, Middleton, WI 53562, hereinafter
referred to as the CONSULTANT, entered into an agreement for Storm Water
Management Plan for Fernau Avenue Watershed on June 11, 2014.
Paragraph C in ARTICLE X. PAYMENT included the provision that costs for
additional services shall be negotiated and set forth in a written amendment to this
AGREEMENT executed by both parties prior to proceeding with the work covered under
the subject amendment.
THEREFORE, the CITY and the CONSULTANT agree to insert the following
paragraph after the first paragraph in ARTICLE III. SCOPE OF WORK:
The CONSULTANT shall provide the services described in the CONSULTANT's
Amendment#1 to Fernau Basin Stormwater Study dated January 6, 2015.
The CITY and the CONSULTANT further agree to replace the first paragraph of
ARTICLE VIII. TIME OF COMPLETION with the following:
The work to be performed under this AGREEMENT shall be commenced and the
work completed no later than December 31, 2015.
The CITY and the CONSULTANT further agree to replace the first bullet in
Paragraph A of ARTICLE X. PAYMENT with the following:
• Time and Materials Not to Exceed $149,960 (One Hundred Forty Nine
Thousand Nine Hundred Sixty Dollars).
The CITY and the CONSULTANT further agree to replace the second bullet in
Paragraph A of ARTICLE X. PAYMENT with the following:
• Attached fee schedules may be renegotiated once annually.
I:\Engineering\Storm Water Information\Femau Avenue Watershed\SWMP RFP Materials\B&C Fernau Page 1 of 2
Ave Wlrshed CA#1 12-23-14.docx
i
All other terms contained within the June 11, 2014 agreement remain unchanged
and in effect.
In the Presence of: CONSULTANT
�v��� By: �� ��
(Seal of Consultant //
if a Corporation) v,�-� �/,���
(Specify Title)
By:
(Specify Title)
CITY OF OSHKOSH
gy: 4��__ � Jc<--���L'`''��.
(Witness) Ma c A. Rohloff, City Man�ger
And:
(Witness) � ' y Clerk
a �- �l�P/ 1��
APPROVED: I hereby certify that the necessary provisions
`� n have been made to pay the liability which
_ will accrue under this Agreement.
�� i Attorn��.
. '�(1C�r'C'a , ���v'�'1
City Comptroller
I:\Engineering�Storm Water Information\Femau Avenue Watershed\SWMP RFP Materials\B&C Fernau Page 2 of 2
Ave Wtrshed CA#1 12-23-14.docx
Attachment A
Amendment#1to Fernau Basin StormwaterStudy ��������
Brown and Caldwell Project# 146204
City of Oshkosh Reference#: Res. No. 14-252 DEC 2 3 2014
January 6, 2015
DEPI-. OF PUE3LIC V�./ORKS
OSHKOSH, WISC(JNSIN
This Attachment A documents additional tasks requested of Brown and Caldwell by the City of
Oshkosh (City)to date for the Fernau Basin Stormwater Study(City Res. No. 14-252; BC Project#
146204). Brown and Caldwell (BC) understands from the City that the work described below wiil be
amended to the current approved Scope of Services and project budget of$125,700. The four
requests described below total $24,260.00. These descriptions and requests were communicated
to the City in previous emails with the understanding that a formal amendment would be prepared
when several tasks were accumulated.
Additional Effort#1 - Moser Street Hydrology Comqarison
This effort adds the comparison of the hydrologic differences (peak flow and runoff volume)for the
drainage area to the proposed Moser Street outfall under existing conditions. The purpose of the
analysis is to determine how significant the differences are between the hydrologic approach (TR 55)
recommended in the City's Code (Chapter 14)for land development and re-development and the
hydrologic method typically used in the City's' watershed studies (SWMM). The following
assumptions were used in preparing the budget for this amendment:
Assumptions and Tasks:
1. Eight(8)subwatersheds would be modeled.
2. Calculate Tc and CN for each subwatershed using TR 55 methodology.
3. The modeling approach shall be as specified:
a. Calculating the existing runoff(peak flow and volume)from the Moser Street storm
sewer using both TR-55 and SWMM hydrology methods.
b. The TR-55 hydrology will be run with the 100-year, 24-hour Huff rainfail depth and a
SCS Type II rainfall distribution.
c. The SWMM hydrology will be run with the 100-year, 1-hour and 2-hour Huff Rainfall
depth and a Huff 1st Quartile rainfall distribution.
4. Update SWMM model to suit this analysis (data entry, overland flow paths)
5. Run the model in a 1D mode, and prepare results table (table with peak flow and volume
from each sub-watershed and peak flow and volume at discharge point - pipe and
overland flow)for both TR55 and SWMM hydrologic approaches.
6. One conference call with City staff to discuss results and determine next steps.
Additional Effort#1 Budget: $4,600.00
Additional Effort#2 - Watershed Modeling Utilizing SCS Type II Storm Events
This effort adds an evaluation utilizing the SCS Type II storm events to the originally scoped modeling
being conducted for the Fernau Avenue project area. The purpose of the analysis is to evaluate the
effects of the modeling when the hydrologic approach (TR 55) recommended in the City's Code
(Chapter 14)for land development and re-development is used. Typically this methodology has not
been utilized in past watershed studies conducted by the City. The following assumptions were used
in preparing the budget for this amendment:
Assumptions and Tasks:
1. The hydrologic analysis for the entire Fernau project area (both within, and outside of,the
TIF 27 District) will be conducted using SWMM hydrology.
Amendment 1 Attachment A v2.docx 1
• Attachment A
Amendment#1 to Fernau Basin Stormwater Study
Brown and Caldwell Project# 146204
City of Oshkosh Reference#: Res. No. 14-252
January 6, 2015
2. The storm water conveyance capacity analysis within the Fernau project area will be
conducted using the 10-, 25-, and 100-year storm events with the Huff distribution at the
critical duration.
3. The peak runoff control requirements of Municipal Code Chapter 14 wiil be determined
using the SCS Type II 24-hour rainfall distribution as described:
a. For the Fernau Avenue project area the 10-and 100-year, 24-hour SCS Type II storm
events will be analyzed. The detention basins serving the TIF District wiil be
conceptually sized to reduce the 100-year post-development peak flow rate to the
10-year pre-development peak flow rate.
b. The 1-year and 2-year storm events are assumed to also meet the peak flow
reduction requirements and wiil not be run at this time. These storm events will be
run during final design of the detention basins in order to fully document ordinance
compliance.
c. Detention basins not serving the TIF District will be evaluated using methodologies
consistent with the stormwater capacity conveyance analysis as described in #2
(above)
4. The items described above results in the addition of the 10-and 100-year, 24-hour SCS
Type II storm events analysis to the original scope of work.
a. Both storm events will be evaluated as part of Task 5 (Execute Existing Conditions
Hydrologic and Hydraulic Modei) in the original scope of work.
b. The 100-year, 24-hour SCS Type II event will be evaluated to ensure TIF district
detention basins meet the municipal code.
c. Both additional storm events will also be evaluated as part of Task 8 (Execute Post-
Mitigation Hydrologic and Hydraulic Model with recommended alternative).
5. The additional rain events and analyses will also impact the report preparation effort.
Additional Effort#2 Budget: $7,910.00
Additional Effort#3 - Addition of Snell Road Basin
This effort adds an evaluation of the Sneli Road subbasin to the original scope and budget. The
existing northern boundary of the Fernau Avenue Watershed is Snell Road (Between Jackson St and
Moser St). The City plans to urbanize Snell Road as part of their streets CIP. The urbanization of the
road will convert the existing rural cross section with a grass swale conveyance system to an urban
cross section with curb &gutter along with storm sewer for the conveyance system. The future
storm sewer system will likely connect to the proposed storm sewers in Main Street and Moser
Street that are part of the Fernau Avenue Watershed SWMP. As part of the Fernau Avenue
Watershed SWMP the City would like to evaluate this connection to the Fernau Avenue watershed
and its impact on stormwater management measures. The following assumptions were used in
preparing the budget for this amendment:
Assumptions and Tasks:
1. Connecting the future Snell Road storm sewer to the Main St and Moser St storm sewer will
modify the Fernau Avenue watershed boundary.
2. BC will delineate the Snell Road watershed and add this area into the proposed conditions
models and include it as part of the alternatives analysis.
Amendment 1 Attachment A v2.docx 2
• Attachment A
Amendment#1 to Fernau Basin Stormwater Study
Brown and Caldwell Project# 146204
City of Oshkosh Reference#: Res. No. 14-252
lanuary 6, 2015
3. The Sneli Road drainage will impact the Main St and Moser St storm sewer,the Main Street
Detention Basin, and the Moser Street Detention Basin.
Additional Effort#3 Budget: $3,450
Additional Effort#4 - Hoffmaster Area Refinement
The original project scope and budget inciuded analyzing private stormwater management systems
as identified on a map attached to the contract. The Hoffmaster property was not identified on this
map, because it did not incorporate any existing stormwater management measures. With the level
of flooding identified on the private property,the City has requested BC add an analysis of the
Hoffmaster property, which included a more detailed delineation of the site's drainage system. The
followingtasks are proposed to be conducted to meetthis request:
1 BC will receive site pian data in PDF format of the Hoffmaster property and the various
building phases,since Building 1 was designed in 1969. BC will review with the City and
select the necessary plan sheets with data necessary for the analysis.
2. The subasins within the Hoffmaster site (changes to 6 subasins) will be updated to reflect
the information provided in the drainage plans.
3 The private storm sewers located in the parking lots north of the buildings, (10 nodes and 10
links), will be added into XP-SWMM modei.
4. BC will update the XP SWMM model and rerun the model under the following scenarios:
Existing Conditions,Alternatives 1, 2, 2A, 2B, 3, and re-plot model result maps.
This effort will require additional scope and budget that is outside the original project contract.
Additional Effort#4 Budget: $8,300.00
Amendment 1 Attachment A v2.docx 3
� RECEIVED
JAN 12 2015
Brown and Caldwell Schedule of Hourly Billing Rate �� PUBLIC WORKS
OSHKOSH, WISCONSIN
-- - - �. �
- - Office/Support Servicesl $60-$65
DrafterTrainee Field ServiceTechnician I �ord Processorl $62-$67
Office/Support Services II
Assistant Drafter Field ServiceTechnician II Word Processor II $63-$68
Office/Support Services Iii
Drafter Accountantl
Engi�eeringAide FeldServiceTechnicianlll WordProcessorill $65
inspeetion Aide Office/Support Services IV
Engineer i Geologist/Hydrogeologist I
Senior Drafter Accountant II
Senior I Ilustrator Scientist I Word Processor IV $84�89
Inspector I Senior Field Service Technician
Engineer 11 Accoun#ant Iil
Inspector II Geoiogist/Hydrogeol4gist 11 Area Business Operation Mgr $gg_$119
Lead Drafter Scientist fl Technical Writer
Lead Iilustrator Word Processing Supervisor
Engineer III
Inspectorlil Geologist/Hydrogeologistlli AccountantlV
Senior Designer $105-$139
Supervising Drafter Scientistill AdministrativeManager
Supervising illustrator
Senior Engineer
PrincipalDesigner SeniorGeola�st/Hydmgeologist SeniorTechnicalWriter $130-$149
SeniorCansUuctionEngineer SeniorScientist
Senior Engineer
Principal Engineer principal Geologist/Hydrogeologist
Principal Construction Engineer principal Scientist Corp.ContractAdministrator $150-$168
Supervising Designer
Supervising Engineer Supervising Scientist
SupervisingConstr. Engineer SupervisingGeologist/ AssistantControiler $168-$189
Supervising Engineer Supervising Hydrogeologist
Managing Engineer Managing Geologist/Hydrogeologist Area Bus Ops Mgr IV $190-$212
Managing Scientist
Chief Engineer Chief Scientist
Executive Engineer Chief Geologist/Hydrogeologist Corp Marketing Comm.Mgr. $200-$225
Vice President
The rates provided in this table applyfrom January 1-December3l,2015.