Loading...
HomeMy WebLinkAboutAECOM/2015 Construction Testing Services �COM AECOM 920.235.0270 tel 558 North Main Street 920.235.0321 fax Oshkosh,Wisconsin 54901 F �a.��iM..A 970�F.-..��F� �`?V�3 ,�.t� CUI`4 l�EPT. U(' PUF�I_�t 1,,1in;�{�S November 11, 2014 OSNKp:;r;, W;Sr���a`,r;J Mr. Steven M. Gohde, P.E. Assistant Director of Public Works City of Oshkosh 215 Church Avenue Oshkosh, Wisconsin 54901 Subject: Proposal for Cast-in-Place Concrete Compressive Strength Testing Services for the 2015 Construction Season—AECOM Proposal No. OPP-323245 Dear Mr. Gohde, AECOM Technical Services, Inc. (AECOM) is pleased to provide this proposal for cast-in-place concrete compressive strength testing services for the 2015 construction season. AECOM will provide construction and material testing services when requested by the City of Oshkosh during the 2015 construction season. We understand that representatives of the City of Oshkosh will cast the cylinders and transport them to the AECOM Oshkosh laboratory. There they will be moist cured and tested by AECOM personal to determine the unconfined compressive strength in general accordance with ASTM Specification C-39. This scope of work will be billed on a unit rate basis in accordance with the following rate table. We will keep you apprised of the budget during the course of the season in case any adjustments are deemed necessary based on the volume of work requested. Services Fee 6"x 12" Compressive Strength Testing of Concrete(including cylinder mold) $22.00/test Project Engineer(Project Management& Reporting) $120.00/hour Technical Support Staff(Clerical) �65.00/hour Estimated Budget $21,000 "Note: Cylinder molds are to be picked up at the AECOM Oshkosh office by the City of Oshkosh. Our actual fees will be accrued on a time and expense basis utilizing the unit rates above. Charges for technical personnel will be made for time spent in the field including travel, in consultation, in preparation of reports and invoices, and in administering contracts and project coordination. Invoicing will be prepared on a monthly basis. If services to be provided under this proposal require the agents, employees, or contractors of AECOM to enter onto the Project site, Client shall provide right-of-access to the site to AECOM, its employees, agents, and contractors, to conduct the planned field observations or services. The 2009 Negotiated Terms and Conditions with the City are expressly incorporated into, and are an This document includes proprietary data that shall not be duplicated,used or disclosed outside City of Oshkosh Department of Public Works for any purpose other than to evaluate this document.This restriction does not limit City of Oshkosh Department of Public Works's right to use information contained in this document if it is obtained from another source without restriction. OPP-323245_CY2015 Concrete Testing Proposal.docx � AECOM 2 integral part of our contract for services. AECOM can begin providing these services immediately upon receipt of the signed Authorization (attached). Please reference the AECOM proposal number, OPP-323245, in the Purchase Order that is forwarded to AECOM. We thank you for this opportunity to provide these services. If you have any questions or need to clarify a point, please call any of the undersigned at 920-235-0270. Sincerely yours, �'"�� � �- G%��� �/� � P I F. Timm l Albert W. Cole Account Manager Senior Program Manager Attachments: Authorization K:\PROPOSAL1City of Oshkosh\OPP-323245_CY2015 Concrete Testing\OPP-323245_CY2015 Concrete Testing Proposal.docx � ��0� AECOM 920.235.0270 tel 558 North Main Street 920.235.0321 fax Oshkosh,WI 54901 Authorization November 11, 2014 I hereby certify that the necessary provisions have been made to pay the liability, which will accrue under this contract. I hereby authorize AECOM to proceed with the scope of work for Cast-in-Place Concrete Compressive Strength Testing Services for the 2015 Construction Season as described in AECOM's proposal OPP-323245 dated November 6, 2014, with a budget authorization of$21,000 under the general terms and conditions specified in the proposal. �—�����%z� 1l-/9-.Zo/� Sig ture Date Mark A Rohloff Print Name City Manager Title/�rganization ' ��� � -���� i��. --�� � � -� , � � � � �J � � Signature Date Pamela R. Ubrig Print Name City Clerk Title/ anization � �- 19-�vl � ur Date Lynn A. Lorenson Print Name City Attorney Title/Organization �� �� li ���l I Signa ure �� Date � � Trena Larson Print Name Director of Finance Title/Organization K:\PROPOSAL\City of Oshkosh\OPP-323245_CY2015 Concrete Testing\OPP-323245_CY2015 Concrete Testing Proposal.docx � AECOM 4 I agree to accept invoices from AECOM via e-mail and not postal mail: � Yes Signature: E-mail address: Recipient Mr/Ms: Return to: Name: Paul Timm Address: 558 N. Main Street, Oshkosh, WI 54901 Phone: 920-236-6718 E-mail: Paul.TimmCa�aecom.com K:\PROPOSAL\City of Oshkosh\OPP-323245_CY2015 Concrete Testing\OPP-323245_CY2015 Concrete Testing Proposal.docx