Chairperson Fojtik called the meeting to order at 4:00 pm. Roll call was taken and a quorum declared
present.
The minutes of November 4, 2014 were approved as presented. (Hinz/Bowen)
I. EXTRATERRITORIAL THREE-LOT LAND DIVISION/CERTIFIED SURVEY MAP
AT 6061 STATE ROAD 91 IN THE TOWN OF UTICA
The owner/petitioner are requesting a three-lot land division/certified survey map from one existing
parcel containing a total of 22.147 acres. Sizes of the proposed lots are as follows:
Lot 1 = 5.080 Acres
Lot 2 = 6.816 Acres
Lot 3 = 8.343 Acres
Right-of-Way = 1.908 Acres
Mr. Nau presented the item and reviewed the site and surrounding area as well as the county zoning
classifications and land use in said area. He reviewed the layout of the proposed land division and
stated that this area is outside of the City’s Comprehensive Land Use Plan area. He further stated that
the Department of Public Works reviewed this request and noted that it may have some drainage
easement requirements regulated by Winnebago County code and that there was possible wetlands on
the site which may require a wetland delineation prior to any development. These comments would be
forwarded to the appropriate County staff.
Ms. Propp questioned if we were aware of the potential land use of this site as the property is being
marketed and she was wondering if it would be for subdivision use.
Mr. Nau responded that the property currently possesses an A-2 County zoning classification of
agricultural use and he was not aware if the property owner had requested a zone change; however the
City has no regulatory authority in this area.
Mr. Buck added that the proposed lot sizes would meet both City and County standards.
Mr. Gray inquired if the Town board had approved this request.
Mr. Nau replied that the property owner has a closing scheduled at the end of the month on one of the
proposed lots but he is unaware of its standing with the Town board.
__________________________________
Plan Commission Minutes 2 November 18, 2014
Motion by Vajgrt to approve the extraterritorial three-lot land division/certified survey map at
6061 State Road 91 in the Town of Utica.
Seconded by Bowen. Motion carried 7-0.
II. GRANT STORM SEWER EASEMENT FOR PROPERTY SOUTH OF 2490 JACKSON
STREET
Jackson Square Apartments, LP is requesting a 20 foot by 165 foot storm sewer easement from the
City of Oshkosh to install a storm sewer across city-owned land to connect their on-site storm water
management facility with the municipal storm sewer system.
Mr. Buck presented the item and reviewed the site and surrounding area as well as the zoning
classifications and land use in said area. He stated that a planned development was approved for an
apartment complex earlier this year at 2490 Jackson Street and he reviewed the site plan from that
meeting. He explained the issues with connecting the private storm water management system to the
municipal storm sewer located within the Jackson Street right-of-way which led to the determination
that granting the easement would allow the development to connect to the municipal storm sewer to the
south of the property. The easement would extend through City owned property and would eventually
connect to the detention basin planned for construction on the subject site. He further stated that this
easement would not have any negative impact on surrounding properties and is necessary for the
development to continue. This easement would allow a more efficient way to connect to the City’s
storm sewer system at this time and it will be connected directly to the detention basin to the south
when it is constructed.
Mr. Bowen questioned if the developer is still constructing everything in the approved planned
development including the detention basin on the site and that the only change was the redirection of
the storm water runoff to the south.
Mr. Buck indicated that the planned development was unchanged and the storm water would still be
directed to the City’s municipal storm sewer system that is present through the City owned property
and will connect to the detention basin in the future.
Mr. Bowen inquired when the detention basin was planned to be constructed.
Steve Gohde, Assistant Director of Public Works, responded that the detention basin was planned to be
constructed in 2016 or 2017.
Mr. Gray questioned why there was one foot difference between where the easement area begins on the
north side compared to where it terminates on the south side.
Mr. Gohde replied that it was just how it was laid out.
Mr. Gray then questioned if this planned development was still going to proceed as he has not seen any
signs of construction on the site.
Mr. Buck responded affirmatively and stated that the planned development was approved in January
and was still in the process of obtaining approval for their plans and getting the appropriate permits in
order.
__________________________________
Plan Commission Minutes 3 November 18, 2014
Motion by Vajgrt to approve granting a storm sewer easement for property located south of
2490 Jackson Street.
Seconded by Nollenberger. Motion carried 7-0.
There being no further business, the meeting adjourned at approximately 4:12 pm. (Nollenberger/