Loading...
HomeMy WebLinkAbout06. 14-507 NOVEMBER 25, 2014 14-507 RESOLUTION (CARRIED___7-0_____LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVE PROFESSIONAL SERVICE AGREEMENT WITH AECOM FOR FINAL DESIGN AND PROJECT OVERSIGHT; JELD-WEN EAST OF OREGON STREET RIVERWALK ($355,000) INITIATED BY: COMMUNITY DEVELOPMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with AECOM Technical Services for final design and project oversight for construction of a proposed riverwalk in the Jeld-Wen area east of Oregon Street in the South Shore Redevelopment Area in the amount of $355,000.00. Acct. No. 534-1040-7216-00000 TIF #20 South Shore Redevelopment- Land Improvement 0 .IHK 1H orr nie w�hn TO: Honorable Mayor and Members of the Common Council FROM: Allen Davis, Community Development Director DATE: November 19, 2014 SUBJECT: Professional Services Agreement for Final Design and Construction/AECOM Consultants (355,000) for the Riverwalk - East of Oregon Street Background The Community Development Department requested a final design and construction services contract from AECOM for the construction of the riverwalk along the Fox River from the Oregon Street east to the Dockside Tavern, for construction in 2015. The proposed scope of the services is related to the final engineering, bidding and construction observation and documentation of the contractor's work on the riverwalk. Analysis The proposed fees are based on an hourly contract, not to exceed $355,000. Specific elements of the services to be perFormed for the project east of Oregon Street are: • Final Construction drawings and Plan Specifications • Contractor Bidding,and Award • Construction survey stake out • Construction observation/documentation • Civil/Structural engineering as needed • Environmental/geotechnical engineering as needed • Grant reporting/documentation as needed. An Alternate for$113,000 for possible engineering work west of Oregon Street will not be awarded at this time. This Alternate would only occur if low bids for the project east of Oregon Street would allow for additional construction west of Oregon. While staff is optimistic the City will be able to bid additional riverwalk west of Oregon, we will not know the bids until the spring of 2015. Staff will bring a contract amendment to City Council in 2015 if funds are available for extending the riverwalk project west of Oregon Street. Fiscal Impact The cost of these professional services is included in the project listed in the 2015 Capital Improvement Plan. The WisDNR has provided the City with $953,000 towards the total $2.1 million project cost. Recommendation The City Council approves the proposed contract for AECOM for $355,000. Approved, ,....��_.__.����. City Manager