Loading...
HomeMy WebLinkAbout07. 14-470 OCTOBER 28, 2014 14-470 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 14-27 TO NORCON CORPORATION FOR WATER FILTRATION PLANT SEDIMENTATION BASIN CONCRETE REPAIRS ($297,959.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for Water Filtration Plant Sedimentation Basin Concrete Repairs; and WHEREAS, upon the opening and tabulation of bids, the following is the only bid: NORCON CORPORATION 5600 Municipal Street Schofield, WI 54476 Total Bid: $297,959.00 WHEREAS, this bid meets the minimum specifications and staff has reviewed the bid and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 541-1810-1799-00000 Water Utility Construction Work in Progress � O HKO H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Public Works Utility Bureau Managers(�I� DATE: October 23, 2014 RE: Award Bid for Public Works Contract No. 14-27 Sedimentation Basin Concrete Repairs Norcon Corporation /($297,959) BACKGROUND The sedimentation basins at the Water Filtration Plant were put into service in November of 1999. Over time, some cracking and leaking at various locations, including expansion joints, were identified during routine maintenance of the basins. A condition assessment of the sedimentation basins was performed in May of 2012 by AECOM Technical Services, Inc. (AECOM). This assessment recommended the following repairs to the sedimentation basins: concrete repairs to the spalled, delaminated, and distressed concrete; chemical grout injection in walls and slabs; routing and sealing existing cracks on the top side of roof slabs; replacing existing expansion joint materials with chemical grout injection; and replacing joint sealant at exterior joint locations at the north and west elevations and building roof slab. ANALYSIS The bidding documents were prepared by AECOM for this project. Bids were opened on October 21, 2014, with one contractor bidding on the project. This bid was received from Norcon Corporation of Schofield, Wisconsin. The total bid is $297,959. The engineer's estimate was $325,000. The bid was reviewed by the project engineer and determined to be reasonable for the work specified. FISCAL IMPACT This project is included in the 2013 Capital Improvements Program under the Property Improvements Section (Water Utility Fund) with a budgeted amount of$288,000. The additional budget needed for this project is available from projects that have been completed under budget. RECOMMENDATIONS I recommend award to the low bidder, Norcon Corporation, in the amount of$297,959. Approved: ,,,�,m...�_.._�.. ���.����i,,,.-.. - � - Mark A. Rohloff City Manager SMB/tlt I:\Engineering�2014 CONTRACTS\14-27 Sediment Basin Conc Repairs\Project_Information\Correspondence\Memo\14-27 Bid Award Memo_10-23-14.docx °o °o °o °o °o °o °o °o m °cn- °e� °en- °cn- °� °En- u°� °v� 0 H 'c � 0 N Z U � �. � U 'c w � _ U M O O O O O O O O c0 � � � � � � � t�9 O H �C � 0 N Z U � a` � U �� w � _ U N O O O O O O O O f0 O O I� � M O 1!9 tff � � 6) M 00 (O I� O1 01 ~ � (�p � f� � b9 O> Q� 'C V) fA V) � � � � � N �p c N i� �p � � O O O G�O. O O n.Q� � � N N � CMO M � `o �� tfl 69 � � Z U � -o a O o � .a� � � m � 0 L = � Z lf') � N � t/1 ul � N N N 'c O p � Z Q Q Q 7 � � I� O N � M N N 3 N � � O N .0 LL LL fn LL (� N � � = c C j C � � � � J J J J J (n � C� � � � h �(p � 'O -� C O C � W F a � W � m .� �� � � O m � H Z �U c C U - � U e- � 0 (0 C U) N N � � O @ N • 0 �-�' N (0 C � � Z � � m � � N � � w ° � V X-� -a .5 � m � m „ o co C� � � w � a� cn :� � � `" � � � c a m m � � � X �� z V p OU � � � � � W � va � � � � O- � LL m V c � �- � °� n� � u°�i E .� a�°i o � � 'o �a �n � �' ~ � U � Q- x m :� m m o ;� ow x � .� w u� V w Z � � N c E w � '� pp t � � � � W � � X co W J � 00 � � � c°� o a� a o V ° n m a o ° a �m � m N fQ.. _ c a E 0 p m m m m � m v u� a cn a� U g .o ; � �; � � � _ _ .� � � �, _ � �, � a � o 0 � o — c� Y � m � � a � � � � � � � � w m c ~ ui p f6 m � � � E � a � @ � � � a� a� � c°� O 0 � Fa- E m � H �� U m � Q � � ° a a? a � U a � 'm Q ~ Q 1- � � o F t� u� o a� � n c � � � � o-� � � o- � m � w � � p W s 0 N X p N 'p �� p o p N c o o N � � m (n m m N U li � N c� � � � c� � U � m c� U � a tn C7 U � N M V � (O � O O O O O O _ O O O O O O