Loading...
HomeMy WebLinkAboutVinton Cons/CHG OR 1/ Riverside Parking Lot CITY OF OSHKOSH LEGAL DEPARTMENT 215 CHURCH AVENUE, P.O. BOX 1130, OSHKOSH, WI 54903-1130 PHONE: (920) 236-5115 FAX(920) 236-5106 LETTER OF TRANSMITTAL To: Vinton Construction Date: September 24, 2014 PO Box 1987 Pro�ect: Riverside Parking Lot Manitowoc, WI 54221 From: Carol Marchant, Adm. Assistant Re: Change Order No. 1 Attn: Please find: � Attached ❑ Under Separate Cover ❑ Copy of Letter � Change Order ❑ Amendment ❑ Report ❑ Agenda ❑ Meeting Notes ❑ Photos ❑ Mylars ❑ Change Order ❑ Plans ❑ Specifications ❑ Estimates ❑ Diskette ❑ Zip Disk ❑ Other Quantit Descri tion 1 Ori inal of Chan e Order No. 1 for Contract 13-17 These are being transmitted as indicated below: ❑ For Approval � For Your Use ❑ As Requested ❑ For Review 8� Comment Remarks: cc: City Clerk (original) Transit (original) n � � � �r � � � � � � � � � � n b � . � � CHANGE ORDER NO. 1 TO: Vinton Construction Company Date: September 15, 2014 P.O.Box 1987 Manitowoc, WI 542221-1987 Your present Contract No 13-17 with the City of Oshkosh for construction of Riverside Parking Lot project is hereby amended and changed as follows: Bid Items Quantitv add/subtract Amount 1019 Remove/Dispose Soil subtract 500 CY <$8,000.00> 1020 Remove/Dispose Piles subtract 10 each <$2,960.00> 1203 EBS subtract 500 CY <$g,200.00> 1230 Heavy Fabric subtract 6974 SF <$ 1,384.32> 1260 Protect Wells subtract 7 each <$3,500.00> 1442 30"curb/gutter subtract 55 LF <$ g46.00> 1800 3/."CABC subtract 95 tons <$ 1,066.85> 1900 Tack coat subtract 667 GAL <$ 2,434.55> 1902 HMA Pavement subtract 208.44 ton <$13,183.83> 2990 EXC.lTrans./impacted soil subtract 2,535.09 tons <$42.843.02> Subtotal Decrease ' <$85,518.57> 1350 Pavement Ties add 31 each $ 310.00 1520 8"ramp/CABC add 1,194 SF $12,482.53 1811 1 '/<"CABC add 279 tons $ 3,133.17 2862 Silt Fence add 2 LF $ 4.00 2920 Turf Grass add 408.1 SY $ 285.67 2932 E-Mat add 240 SY $ 384.00 CB 1 Dumpster Enclosure Brick add exterior brick $ 1,518.00 CB 2 Dumpster Wall Retaining Wall change to Cast in Place $ 2,460.00 CB 3 Detectable Warning Fields Add 38 SF $ 1,520.00 CB-4 4"Sidewalk and CABC add 1,316.5 SF $ 7,04328 CB 5 Railing add 123 LF $ 6,765.00 CB 6 Biofilter Gutter Rebar add 485 LF $ 1,455.00 Subtotal Increase $37,360.64 Original Award Contract Amount $664,666.10 Net Change Decrease C.O.#1 <$48.157.93> Revised Contract Amount $616,508.17 j ♦ . 4 RECOMMENDED: CITY OF OSHKOSH ��- G-�..o BY: � /�—� Transpo�tation Director '4y Manager _ . , City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within APPROVED AND ACCEPTED: Change Order. � ��Q� A e r�1 ��%?�'-��-J���.� Finance Director Vinton Co uction Compsny Ap ved as to rm: n renson, Cit o ney