HomeMy WebLinkAboutPW CNT 13-05/CHG OR/Advance Construction � ` DEPARTMENT OF PUBLIC WORKS 215 Church Avenue � P.O.Box 1130 � Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 �HKOlH Fax(920)236-5068 ON THE WATER September 5, 2014 Mr. Glenn Joski Advance Construction, Inc. 2141 Woodale Avenue Green Bay, WI 543 i 3 Subject: Change Order No. 1 (Final) Contract 13-05 Dear Mr, Joski: Enclosed is an executed copy of Change Order No. 1 (Fina1) between the City of Oshkosh and Advance Construction, Inc. regarding the abovementioned project. If you have any questions, please call our office at(920)236-5065. Sincerely, ����� � David C. Patek � Director of Public Works DCP/tlt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk(w/original) Lynn Lorenson, City Attorney(w/copy) Tara Wendt, Assistant Finance Director(w/copy) File (w/original) I:�EngineeringU3-OS Conc Paving&Util�Project_Information\ConVact Info\Change Orders\13-OS Executed CO#1 Page 1 of 1 Lv 9-5-14.docx , . TO: Advance Construction, Inc. CHANGE ORDER# 1 �j(l'cLC 2141 Woodale Avenue DATED: AUGUST 12, 2014 Green Bay, WI 54313 Your present contract with the City of Oshkosh, Contract No. 13-05, awarded March 12, 2013, is hereby amended and changed as follows: NET DECREASE TO: SECTION I - PAVING (36,198.10) NET DECREASE TO: SECTION II - STORM SEWER (180,149.73) NET DECREASE TO: SECTION III - SANITARY SEWER (16,495.48) NET DECREASE TO: SECTION IV- WATER MAIN (71,178.52) NET DECREASE TO CONTRACT ($304,021.83) Section I Section il Section III Section IV (Paving) (Storm) (Sanitary) (Water) Totals Bid Total $1,442,867.75 $2,571,897.75 $986,051.75 $1,083,958.39 $6,084,775.64 C.O. #1 ($36,198.10) ($180,149.73) ($16,495.48) ($71,178.52) ($304,021.83) Contract Total $1,406,669.65 $2,391,748.02 $969,556.27. $1,012,779.87 $5,780,753.81 CITY OF OSHKOSH BY: ��f 4���''�°� Recommended: - -_, City Manager � �G..c� ��� � �- � ,,� �l, Director of Public Works City Clerk � Approved and accepted: , f, �. �... ntractor 1 certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ��� �a�n�, Comptroller Approved as t orm: Cit ey ' ' , CONTRACT: 13-OS CHANGE ORDER#1 SECTION i-PAVING ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 1011 Clearing,complete as incn s ecified Diameter 23 22.00 -1.00 $12.00 $12.00 1021 Grubbing,complete as inch s ecified Diameter 23 22.00 -1.00 $12.00 $12.00 1100 Removing pavement, Square com lete as s ecified Yards 7,040 6881.60 -158.40 $2.50 $396.00 1101 Removing pavement, Linear com lete as s ecified Feet 880 855.30 -24.70 $11.00 $271.70 1120 Removing concrete and asphalt sidewalk and driveway,complete as Square s ecified Feet 48,880 56500.50 7,620.50 $0.39 $2,972.00 1130 Removing bollards, com lete as s ecified Each 22 25.00 3.00 $100.00 $300.00 1200 Excavation,complete as Cubic s ecified Yards 12,500 11672.40 -827.60 $7.25 $6,000.10 1220 Excavation special (paving), complete as s ecified Tons 2,200 0.00 -2,200.00 $4.00 $8,800.00 1301 7"concrete pavement,5" CABC,and grading, Square com lete as s ecified Yards 14,430 14601.30 171.30 $27.70 $4,745.01 1303 7"concrete pavement HES,5"CABC,and grading,complete as Square specified Yards 815 413.20 -401.80 $34.70 $13,942.46 1311 8"concrete pavement,6" CABC,and grading, Square com lete as s ecified Yards 7,120 6964.20 -155.80 $30.80 $4,798.64 1313 8"concrete pavement HES,6"CABC,and grading,complete as Square s ecified Yards 930 1077.10 147.10 $36.73 $5,402.98 1325 9"concrete pavement doweled, HES,6"CABC, and grading,complete as Square s ecified Yards 1,665 1746.80 81.80 $38.75 $3,169.75 1340 Crushed aggregate base course,complete as s ecified Tons 4,650 136.40 -4,513.60 $7.50 $33,852.00 1350 Pavement ties,complete as s ecified Each 355 318.00 -37.00 $8.00 $296.00 1360 Adjust manholes and inlets,complete as s ecified Each 194 210.00 16.00 $165.00 $2,640.00 1370A Terrace work,complete as specified,on West 19th Lump Avenue Sum 1 1.00 $6,550.00 13706 Terrace work,complete as specified,on Montana Lump Street Sum 1 1.00 $5,615.00 1370C Terrace work,complete as specified,on West 23`a Avenue(Montana Street to Lump Ore on Street Sum 1 1.00 $11,660.00 Page 1 of 20 ' ' CONTRACT: 13-OS CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE lN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 1370D Terrace work,complete as specified,on West 23`' Avenue(Oregon Street to Lump Dot Street Sum 1 1.00 $12,600.00 1370E Terrace work,complete as specified,on Doty Street Lump Sum 1 1.00 $5,895.00 1370F Terrace work,complete as specified,on West 24'h Lump Avenue Sum 1 1.00 $6,545.00 1370G Terrace work,complete as specified,on Jackson Lump Street Sum 1 1.00 $500.00 1370H Terrace work,complete as specified,on Perimeter Lump Road Sum 1 0.00 -1.00 $3,550.00 $3,550.00 1380 Cold weather covering (concrete pavement)- single visquine,complete Square as s ecified Yards 2,230 679.40 -1,550.60 $0.01 $15.51 1382 Cold weather covering (concrete pavement)- double visquine,complete Square as s ecified Yards 2,230 0.00 -2,230.00 $0.01 $22.30 1384 Cold weather covering (concrete pavement)- double visquine with 6" hay, complete as specified Square Yards 2,230 0.00 -2,230.00 $0.01 $22.30 1410 12"radius curb with 6" CABC and grading, Linear com lete as s ecified Feet 1,500 1533.40 33.40 $12.75 $425.85 1440 30"curb and gutter,7"with 5"CABC and grading, Linear complete as specified Feet 120 243.10 123.10 $16.10 $1,981.91 1442 30"curb and gutter,8"with 6"CABC and grading, complete as specified Linear Feet 195 323.40 128.40 $16.30 $2,092.92 1460 Sidewalk curb, complete Linear as s ecified Feet 572 553.90 -18.10 $16.85 $304.99 1500 4"concrete sidewalk with 3"CABC and grading, Square com lete as specified Feet 14,255 17659.20 3,404.20 $3.58 $12,187.04 1510 6"concrete s id ewa I k/d riveway/ra m p with 3"CABC and grading, Square com lete as s ecified Feet 37,580 35233.70 -2,346.30 $3.71 $8,704.77 1514 6"concrete sidewalk/d riveway/ramp (HES)with 3"CABC and grading,complete as Square specified Feet 810 655.70 -154.30 $3.90 $601.77 1520 8"concrete s idewalk/d riveway/ram p with 3"CABC and grading, Square complete as specified Feet 9,765 9748.70 -16.30 $4.15 $67.64 1524 8"concrete sidewalk/d riveway/ramp (HES)with 3"CABC and grading,complete as Square s ecified Feet 335 309.10 -25.90 $4.35 $112.67 Page 2 of 20 ' � CONTRACT: 13-05 CHANGE ORDER#1 ITEM BlD INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT qUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 1540 Curb ramp detectable warning field(natural/non- painted),complete as Square specified Feet 680 656.00 -24.00 $24.00 $576.00 1550 No.4 reinforcing rods- deformed,epoxy-coated, Linear com lete as s ecified Feet 6,530 8539.00 2,009.00 $0.66 $1,325.94 1560 Drilled No.4 sidewalk tie bars,deformed,epoxy- coated,complete as s ecified Each 813 504.00 -309.00 $1.30 $401.70 1580 Cold weather covering (sidewalk)-single visquine,complete as Square s ecified Feet 5,030 6579.90 1,549.90 $0.01 $15.50 1582 Cold weather covering (sidewalk)-double visquine, complete as Square specified Feet 5,030 0.00 -5,030.00 $0.01 $50.30 1584 Cold weather covering (sidewalk)-double visquine with 6"hay, Square com lete as s ecified Feet 5,030 0.00 -5,030.00 $0.01 $50.30 1600 Furnish and install tree, com lete as s ecified Each 1 0.00 -1.00 $500.00 $500.00 1700 Sawing existing pavement, Linear com lete as s ecified Feet 1,370 1420.20 50.20 $0.95 $47.69 1710 Sawing concrete pavement full depth,complete as Linear specified Feet 2,915 3018.20 103.20 $1.65 $170.28 1800 Base aggregate dense,'/:', com lete as s ecified Tons 50 0.00 -50.00 $10.00 $500.00 1900 Tack coat,complete as s ecified Gallons 54 0.00 -54.00 $15.00 $810.00 1906 4"asphaltic pavement with 10"CABC and grading, Square com lete as s ecified Yards 800 0.00 -800.00 $25.75 $20,600.00 1910 5"asphaltic transition with 10"CABC and grading, Square com lete as s ecified Yards 1,425 1509.70 84.70 $31.75 $2,689.23 1911 4"asphaltic transition with 10"CABC and grading, Square com lete as s ecified Yards 860 902.30 42.30 $25;75 $1,089.23 �9�2 2"asphaltic transition with 10"CABC and grading, Square com lete as specified Yards 145 116.30 -28.70 $23.75 $681.63 19�6 4"asphaltic surface with 6" CABC and grading, Square com lete as s ecified Yards 135 112.40 -22.60 $23.35 $527.71 1918 Jackson Street pavement Linear restoration Feet 870 855.30 -14.70 $33.75 $496.13 1999 Railroad insurance with limits of not less than $5,000,000 per occurrence for Bodily Injury Liability, Property Damage Liability, and Physical Damage to Property,with$10,000,000 aggregate for the term of Lump the olic Sum 1 1.00 $2,500.00 Page 3 of 20 � CONTRACT: 13-OS CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE pRICE SECTION I-(BID ITEMS 1011 -1999)-SUB-TOTALS $41,255.33 ($106,976.62) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I ITEM BlD INSTALLED NET NET UNIT /NCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE pRICE 10000 Additional cost to the handwork price for the use of ready mix concrete with heated water for late season paving,complete Square as specified Yard 0.00 416.90 416.90 $6.18 $2,576.44 10001 Additional cost to the machine work price to place concrete by hand and for the use of ready mix concrete with heated water for late season paving,complete as Square specified Yard 0.00 970.50 970.50 $14.18 $13,761.69 10002 Furnish and install cold weather covering with 1 layer of Visquine,complete Square as s ecified Yard 0.00 440.90 440.90 $2.00 $881.80 10003 Extra sidewalk work on north side of 20th& Montana, per invoice, Lump com lete as s ecified Sum 0.00 1.00 1.00 $2,667.52 $2,667.52 10004 Temporary paving of South Main Street over the winter,due to delays in box culvert installation, per Invoice,complete as s ecified Tons 0.00 84.35 84.35 $89.25 $7,528.24 10005 Additional traffic control due to contract delays, Lump com lete as s ecified Sum 0.00 1.00 1.00 $2,107.50 $2,107.50 ADDITIONAL WORK: C.O.#1-(ITEMS 10000-10005)-SUB-TOTAL $29,523.19 $0.00 NET DECREASE TO: SECTION I ($36,198.10) SECTION II-STORM SEWER ITEM BlD INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2014 Storm sewer utility line opening,complete as s ecified Each 5 11.00 6.00 $390.00 $2,340.00 2034 Furnish and install 10" storm sewer, complete as Linear s ecified Feet 235 235.00 $39.00 2036 Furnish and install 12" storm sewer,complete as Linear s ecified Feet 1,560 1569.40 9.40 $47.00 $441.80 Page 4 of 20 ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM DESCRIPTION UNIT BlD INSTqLLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2042 Furnish and install 15" storm sewer,complete as Linear s ecified Feet 250 167.90 -82.10 $51.50 $4,228.15 2048 Furnish and install 18" storm sewer,complete as Linear s ecified Feet 430 482.60 52.60 $55.00 $2,893.00 2054 Furnish and install 21" storm sewer,complete as Linear s ecified Feet 15 20.00 5.00 $67.00 $335.00 2060 Furnish and install 24" storm sewer,complete as Linear s ecified Feet 55 5.00 -50.00 $61.00 $3,050.00 2062 Furnish and install 24" RCP Class III storm sewer, complete as specified Linear Feet 50 47.00 -3.00 $61.00 $183.00 2072 Furnish and install 30" storm sewer,complete as Linear s ecified Feet 580 589.00 9.00 $87.50 $787.50 2078 Furnish and install 36" storm sewer,complete as Linear s ecified Feet 1,300 1238.90 -61.10 $123.00 $7,515.30 2090 Furnish and install 48" storm sewer,complete as Linear s ecified Feet 155 0.00 -155.00 $152.00 $23,560.00 2108 Furnish and install 66" storm sewer,complete as Linear s ecified Feet 230 32.00 -198.00 $218.00 $43,164.00 2114 Furnish and install 72" storm sewer, complete as linear s ecified Feet 85 0.00 -85.00 $216.00 $18,360.00 2116 Furnish and install 72" RCP Class III storm sewer, complete as specified Linear Feet 30 30.00 $350.00 2128 Furnish and install 24"x 38"HERCP Class ill storm sewer,complete as Linear specified Feet 65 63.20 -1.80 $105.00 $189.00 2132 Furnish and install 29"x 45"HERCP Class III storm sewer,complete as Linear specified Feet 300 293.70 -6.30 $112.00 $705.60 2136 Furnish and install 34"x 53"HERCP Class III storm sewer,complete as Linear specified Feet 1,550 1541.50 -8.50 $120.00 $1,020.00 2174 Furnish and install 4'x 6' box culvert storm sewer, Linear com lete as s ecified Feet 2,720 2725.00 5.00 $301.00 $1,505.00 2222 Furnish and install 4'x 6' box culvert storm sewer with manhole or inlet riser, complete as specified Linear Feet 96 96.00 $315.00 2280 Furnish and install 6" storm lateral,complete as Linear s ecified Feet 2,263 2417.90 154.90 $30.00 $4,647.00 2282 Furnish and install 8" storm lateral,complete as Linear s ecified Feet 175 77.00 -98.00 $32.00 $3,136.00 Page 5 of 20 ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM B!D INSTALLED NET NET UNIT INCREASE IN DECREASE lN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2284 Furnish and install storm sewer marker balls, com lete as s ecified Each 182 196.00 14.00 $17.00 $238.00 2286 Furnish and install clay dams,complete as s ecified Each 96 98.00 2.00 $50.00 $100.00 2288 Furnish and install lateral inlet,complete as specified Each 70 75.00 5.00 $330.00 $1,650.00 2326 Furnish and install 72" RCP Class III apron endwall with joint ties, com lete as s ecified Each 1 1.00 $4,403.00 2488 Furnish and install 84" casing pipe by trenchless methods,complete as Linear s ecified Feet 80 0.00 -80.00 $2,500.00 $200,000.00 2489 Furnish and install 84" casing pipe by trenchless methods in a non-rock boring situation,complete Linear as s ecified Feet 75 24.8625 -50.1375 $2,000.00 $100,275.00 2532 Furnish and install standard storm manhole (4'diameter),complete as Vertical specified Feet 58 68.31 10.31 $246.00 $2,536.26 2534 Furnish and install standard storm manhole (5'diameter),complete as Vertical s ecified Feet 73 86.08 13.08 $344.00 $4,499.52 2536 Furnish and install standard storm manhole (6'diameter),complete as Vertical s ecified Feet 52 37.27 -14.73 $380.00 $5,597.40 2538 Furnish and install standard storm manhole (7'diameter), complete as Vertical s ecified Feet 73 75.33 2.33 $600.00 $1,398.00 2556 Furnish and install standard storm inlet manhole(4'diameter), Vertical com lete as s ecified Feet 5 5.88 0.88 $272.00 $239.36 2580A Furnish and install storm junction chamber, com lete as s ecified Each 1 1.00 $10,646.00 25806 Furnish and install storm junction chamber, com lete as s ecified Each 1 1.00 $13,909.00 2580C Furnish and install storm junction chamber, com lete as s ecified Each 1 1.00 $16,919.00 2580D Furnish and install storm junction chamber, com lete as s ecified Each 1 1.00 $20,157.00 2580E Furnish and install storm junction chamber, com lete as s ecified Each 1 0.00 -1.00 $10,595.00 $10,595.00 2580F Furnish and install storm junction chamber, com lete as s ecified Each 1 1.00 $10,909.00 Page 6 of 20 ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2580G Furnish and install storm junction chamber, com lete as s ecified Each 1 1.00 $19,287.00 2580H Furnish and install storm junction chamber, com lete as s ecified Each 1 1.00 $12,161.00 25801 Furnish and install storm junction chamber, com lete as s ecified Each 1 1.00 $11,013.00 2584 Furnish and install standard storm manhole riser(4'diameter), Vertical com lete as s ecified Feet 47 43.25 -3.75 $100.00 $375.00 2612 Furnish and install Type 1 inlet,complete as specified Each 4 0.00 -4.00 $1,443.00 $5,772.00 2613 Furnish and install trench drain,complete as s ecified Each 1 1.00 $6,500.00 2614 Furnish and install Type 3 inlet(with 18"sump), com lete as s ecified Each 93 93.00 $1,427.00 2616 Furnish and install Type 3 inlet, complete as specified Each 2 5.00 3.00 $1,446.00 $4,338.00 2800 Connect to existing storm sewer,complete as s ecified Each 5 21.00 16.00 $300.00 $4,800.00 2802 Connect to existing storm lateral,complete as s ecified Each 11 16.00 5.00 $100.00 $500.00 2806 Connect to existing manhole,complete as s ecified Each 3 1.00 -2.00 $600.00 $1,200.00 2808 Connect to existing inlet, com lete as s ecified Each 2 3.00 1.00 $400.00 $400.00 2820 Abandon 8"-12"storm sewer,complete as Linear s ecified Feet 500 446.00 -54.00 $5.00 $270.00 2822 Abandon 15"and larger storm sewer,complete as Linear s ecified Feet 4,000 3732.00 -268.00 $9.00 $2,412.00 2824 Remove 30"and smaller storm sewer, complete as Linear s ecified Feet 2,410 2656.00 246.00 $14.00 $3,444.00 2826 Remove 33"-60"storm sewer,complete as Linear s ecified Feet 125 256.00 131.00 $30.00 $3,930.00 2830 Abandon storm manholes and inlets, complete as s ecified Each 26 24.00 -2.00 $305.00 $610.00 2832 Remove storm manholes and inlets,complete as s ecified Each 44 40.00 -4.00 $325.00 $1,300.00 2858 Furnish, install,maintain, and remove Type D Modified inlet protection, com lete as specified Each 240 195.00 -45.00 $75.00 $3,375.00 2860 Sediment removal-Type D Modified inlet protection, complete as specified Each 240 16.00 -224.00 $10.00 $2,240.00 Page 7 of 20 ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNlT INCREASE IN DECREASE lN NUMBER DESCRIPTION UNIT pUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2862 Furnish, install,maintain, and remove stone tracking pad,complete as specified Each 1 1.00 $1,200.00 2866 Furnish, install, maintain, and remove stone bag, com lete as s ecified Each 50 69.00 19.00 $5.00 $95.00 2868 Furnish,install,maintain, and remove 12"diameter sediment logs,complete Linear as s ecified Feet 35 130.00 95.00 $10.00 $950.00 2876 Furnish, install, maintain, and remove turbidity barrier,complete as s ecified Each 1 2.00 1.00 $3,000.00 $3,000.00 2930 Furnish and install Class I, Type A erosion control mat,complete as specified Square Yards 20 20.00 $5.00 2946 Furnish and install medium rip-rap with filter fabric, complete as specified Square Yards 12 12.00 $75.00 2948 Furnish and install heavy rip-rap with filter fabric, Square com lete as s ecified Yards 38 62.44 24.44 $90.00 $2,199.60 2952 Dredging of channel (Ridgeview Landfill), com lete as s ecified Tons 1,220 0.00 -1,220.00 $23.00 $28,060.00 2954 Dredging of channel (Valley Trail Landfill), com lete as s ecified Tons 1,220 825.88 -394.12 $16.20 $6,384.74 2956 Dredging of channel (natural fill ONLY), com lete as s ecified Tons 1,220 0.00 -1,220.00 $13.20 $16,104.00 2960 Rock excavation,complete Cubic as s ecified Yards 175 16.60 -158.40 $0.01 $1.58 2990 Excavation special(storm), complete as specified Tons 800 1283.89 483.89 $8.00 $3,871.12 2992 Bentonite slurry dam (storm),complete as s ecified Each 4 6.00 2.00 $500.00 $1,000.00 2997 Remove/replace existing airport fence,complete as Linear s ecified Feet 200 0.00 -200.00 $12.00 $2,400.00 2998 Install temporary airport fence,complete as Linear s ecified Feet 230 0.00 -230.00 $3.50 $805.00 2999 Provide airport gate guard, Lump complete as specified Sum 1 0.00 -1.00 $5,000.00 $5,000.00 SECTION II-(BID ITEMS 2014-2999)-SUB-TOTALS $52,138.16 ($497,887.77) ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION II ITEM DESCRIPTION UNIT B�D INSTALLED NET NET UNIT INCREASE lN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PR10E CONTRACTPRICE CONTRACT PRICE Page 8 of 20 ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM BlD INSTALLED NET NET UNIT INCREASE lN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE pR10E 2032 Furnish and install 8" storm sewer,complete as Linear s ecified Feet 0.00 29.00 29.00 $39.00 $1,131.00 20000 Furnish and install 4'X 6' Box Culvert by Jack and Bore methods,complete Linear as s ecified Feet 0.00 56.00 56.00 $3,605.00 $201,880.00 20001 Additional equipment, labor, and materials to relocate and cut holes into new inlet for storm lateral for Oshkosh Truck at MH 23-72,complete as specified Hours 0.00 4.00 4.00 $750.00 $3,000.00 20002 Furnish and install 6" perforated drain tile behind curb and reconnect to exisiting on South Main Street,complete as Linear s ecified Feet 0.00 18.00 18.00 $20.00 $360.00 20003 Furnish and install cleanout for Pepsi, Lump com lete as s ecified Sum 0.00 1.00 1.00 $500.00 $500.00 20004 Modifications to MH 24-10 to fix box culvert instead of 72"Diameter pipe,due to field changes,complete as Lump specified Sum 0.00 1.00 1.00 $17,231.24 $17,231.24 20005 Modifications to MH 24-11 to fix box culvert instead of 72"Diameter pipe,due to field changes, complete as Lump specified Sum 0.00 1.00 1.00 $12,025.04 $12,025.04 20006 Change box culvert to Classs V concrete to railroad grade forjack and bore section under railroad tracks,per railroad specifications,complete as Linear specified Feet 0.00 21.00 21.00 $333.54 $7,004.34 20007 Installed bentonite dam at east of MH 24-10, Lump com lete as s ecified Sum 0.00 1.00 1.00 $6,000.00 $6,000.00 20008 Additional equipment, labor,and materials to install 14"x 23"strom sewer on South Main Street,complete as Lump s ecified Sum 0.00 1.00 1.00 $2,612.16 $2,612.16 20009 Additional equipment, labor,and materials to install inlet and new storm MH by sanitary MH 24-1 on South Main Street, Lump complete as specified Sum 0.00 1.00 1.00 $2,534.00 $2,534.00 20010 Overexcavate to allow for moving of KDL fiber line which was in conflict with storm sewer,complete as specified Hours 0.00 1.50 1.50 $750.00 $1,125.00 Page 9 of 20 . ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTR,qCT PRICE CONTRACT PRICE 20011 Additional equipment, labor,and materials to rebuild storm sewer at West 20th Avenue and Montana Street,complete Lump as s ecified Sum 0.00 1.00 1.00 $3,550.92 $3,550.92 20012 Additional equipment, labor,and materials to excavate and set extra depth on six inlets on West 23rd Avenue,complete as Lump specified Sum 0.00 1.00 1.00 $3,563.88 $3,563.88 20013 Addional equipment, labor, and material to re-install Type III inlet with sump on West 24th Avenue, Lump complete as specified Sum 0.00 1.00 1.00 $1,427.00 $1,427.00 20014 Restocking charge for 72" x 7'-9"base uit for MH 23- 36 which was eliminated from the contract, Lump complete as specified Sum 0.00 1.00 1.00 $1,655.30 $1,655.30 ADDITIONAL WORK:C.O.#7-(ITEMS 2036,20000-20074)-SUB-TOTAL $265,599.88 $0.00 NET DECREASE TO: SECTION II ($180,149.73) SECTION III-SANITARY SEWER ITEM BlD INSTALLED NET NET UNIT INCREASE lN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTlTIES INCREASE DECREASE PRICE CONTRACT PRICE pRICE 3000 Furnish and install 8" sanitary sewer relay, Linear com lete as s ecified Feet 3,965 4075.60 110.60 $81.20 $8,980.72 3002 Furnish and install 10" sanitary sewer relay, Linear com lete as s ecified Feet 1,675 1664.80 -10.20 $79.70 $812.94 3004 Furnish and install 12" sanitary sewer relay, Linear com lete as s ecified Feet 340 330.80 -9.20 $87.65 $806.38 3006 Furnish and install 15" sanitary sewer relay, Linear com lete as s ecified Feet 245 241.30 -3.70 $113.00 $418.10 3008 Furnish and install 18" sanitary sewer relay, Linear com lete as s ecified Feet 10 10.00 $93.20 3012 Furnish and install 24" sanitary sewer relay, Linear com lete as s ecified Feet 55 52.60 -2.40 $156.20 $374.88 3016 Furnish and install 36" sanitary sewer relay, Linear m I a e ified Feet 5 5.00 $186.00 3060 Furnish and install 8" sanitary sewer drop, Vertical com lete as s ecified Feet 20 35.91 15.91 $288.00 $4,582.08 3062 Furnish and install 10" sanitary sewer drop, Vertical com lete as s ecified Feet 9 3.20 -5.80 $306.00 $1,774.80 Page 10 of 20 ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT qUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3066 Furnish and install 15" sanitary sewer drop, Vertical com lete as s ecified Feet 7 3.52 -3.48 $374.00 $1,301.52 3100 Furnish and install standard sanitary manhole (4'diameter), complete as Vertical s ecified Feet 381 365.59 -15.41 $226.60 $3,491.91 3102 Furnish and install standard sanitary manhole (5'diameter),complete as Vertical s ecified Feet 10 8.77 -1.23 $326.00 $400.98 3114 Furnish and install external manhole chimney seal, complete as specified Each 42 40.00 -2.00 $315.00 $630.00 3116 Furnish and install external manhole chimney seal extension,complete as specified Each 5 0.00 -5.00 $227.00 $1,135.00 3118 Furnish and install internal manhole chimney seal, complete as specified Each 3 0.00 -3.00 $274.00 $822.00 3210 Furnish and install 8"x 6" factory wyes or tees, com lete as s ecified Each 64 65.00 1.00 $76.75 $76.75 3212 Furnish and install 10"x 6" factory wyes or tees, com lete as s ecified Each 16 13.00 -3.00 $127.40 $382.20 3214 Furnish and install 12"x 6" factory wyes or tees, com lete as s ecified Each 7 7.00 $177.75 3222 Furnish and install 6" "Insert-A-Tee"or"Kor-N- Seal",complete as specified Each 5 0.00 -5.00 $146.00 $730.00 3230 Furnish and install 4" sanitary laterals new, Linear com lete as s ecified Feet 60 58.00 -2.00 $60.00 $120.00 3231 Furnish and install 4" sanitary riser new, Linear com lete as s ecified Feet 1 3.00 2.00 $60.00 $120.00 3234 Furnish and install 4"/6" sanitary lateral relay, Linear com lete as s ecified Feet 2,700 2173.20 -526.80 $60.00 $31,608.00 3235 Furnish and install 4"/6" sanitary riser relay, Linear com lete as s ecified Feet 50 225.70 175.70 $60.00 $10,542.00 3236 Furnish and install sanitary lateral marker balls, complete as specified Each 180 177.00 -3.00 $17.40 $52.20 3238 Furnish and install clay dams, complete as s ecified Each 90 87.00 -3.00 $100.00 $300.00 3300 Furnish and install connections to existing 8" mains,complete as specified Each 10 9.00 -1.00 $416.00 $416.00 Page 11 of 20 ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT qUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3302 Furnish and install connections to existing 10" mains,complete as specified Each 3 3.00 $550.00 3304 Furnish and install connections to existing 12" mains,complete as s ecified Each 1 2.00 1.00 $600.00 $600.00 3306 Furnish and install connections to existing 15" mains, complete as specified Each 4 2.00 -2.00 $700.00 $1,400.00 3308 Furnish and install connections to existing 18" mains,complete as s ecified Each 1 1.00 $725.00 3312 Furnish and install connections to existing 24" mains,complete as specified Each 2 3.00 1.00 $1,170.00 $1,170.00 3316 Furnish and install connections to existing 36" mains,complete as specified Each 1 1.00 $1,222.00 3402 Furnish and install 8"open cut casing pipes, complete Linear as s ecified Feet 500 502.00 2.00 $60.00 $120.00 3406 Furnish and install 12" open cut casing pipes, Linear com lete as s ecified Feet 100 100.00 $80.00 3412 Furnish and install 24" open cut casing pipes, Linear com lete as s ecified Feet 40 40.00 $200.00 3500 Trenchless 18"casing pipe,complete as Linear s ecified Feet 60 60.00 $422.00 3600 Rock excavation, Cubic com lete as s ecified Yards 150 294.08 144.08 $75.00 $10,806.00 3700 Televise sanitary sewer, Linear com lete as s ecified Feet 6,540 6380.30 -159.70 $1.30 $207.61 3800 Abandon sanitary manholes, complete as s ecified Each 3 3.00 $400.00 3802 Abandon 8"sanitary sewer, complete as Linear s ecified Feet 860 761.00 -99.00 $5.00 $495.00 3808 Abandon 15"sanitary sewer, complete as Linear s ecified Feet 50 50.00 $7.00 3852 Remove sanitary sewer manhole, complete as s ecified Each 1 4.00 3.00 $500.00 $1,500.00 3900 Remove sanitary sewer, com lete as s ecified Each 535 290.00 -245.00 $16.00 $3,920.00 3902 Sanitary sewer utility line opening, complete as s ecified Each 1 3.00 2.00 $400.00 $800.00 3990 Excavation special (sanitary),complete as s ecified Tons 500 0.00 -500.00 $10.00 $5,000.00 Page 12 of 20 ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM BlD INSTALLED NET NET UNIT INCREASE IN DECREASE lN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3992 Bentonite slurry dam (sanitary),complete as s ecified Each 4 0.00 -4.00 $500.00 $2,000.00 3994 Furnish and install 12" ductile iron sanitary sewer force main,complete as Linear specified Feet 40 27.00 -13.00 $131.00 $1,703.00 3996 Furnish and install 12" ductile iron 45°bend, com lete as s ecified Each 4 2.00 -2.00 $647.00 $1,294.00 3998 Furnish and install 8" sanitary sewer in existing casing pipe,complete as Linear s ecified Feet 240 0.00 -240.00 $93.00 $22,320.00 SECTION 111-(BID ITEMS 3000-3998)-SUB-TOTALS $39,297.55 ($83,916.52) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION III ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CO R�RACT 3216 Furnish and install 15"x 6" factory wye,complete as s ecified Each 0.00 1.00 1.00 $513.05 $513.05 3410 Furnish and install 18" open cut casig pipe, Linear com lete as s ecified Feet 0.00 20.00 20.00 $140.00 $2,800.00 30000 Additional equipment, labor, and materials to field adjust an Oshkosh Truck sanitary lateral on July 30, 2014,due to pipe size changes,complete as specified Hours 0.00 5.00 5.00 $750.00 $3,750.00 30001 Additional equipment, labor,and materials to cap an abandoned lateral for Oshkosh Truck,complete as specified Hours 0.00 2.00 2.00 $750.00 $1,500.00 30002 Additional equipment, labor,and laterials to cap sanitary wye,due to abandoned lateral, com lete as s ecified Hours 0.00 1.00 1.00 $750.00 $750.00 30003 Additional equipment, labor, and materials to re- excavate for MH M-2, when it was determined that the second lateral for Pepsi was active,complete as specified Hours 0.00 2.00 2.00 $750.00 $1,500.00 30004 Additional equipment, labor, and materials to core new drop into MH 23- 6A and install a new Cor-N Seal boot for field adjusted sanitary lateral,complete as specified Hours 0.00 3.00 3.00 $750.00 $2,250.00 Page 13 of 20 ' CONTRACT: 13-OS CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE lN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 30005 Additional equipment, labor,and materials to relocate sanitary sewer forcemain that was in conflict with MH 24-11, com lete as s ecified Hours 0.00 12.00 12.00 $750.00 $9,000.00 30006 Additional equipment, labor,and materials to re- set up bypass for sanitary sewer force main due to complications with lift station, complete as specified Hours 0.00 3.00 3.00 $750.00 $2,250.00 30007 Additional crew time to determine which lateral was active at Station 62+50,due to multiple services coming into manhole and not shown on plan,complete as specified Hours 0.00 1.00 1.00 $750.00 $750.00 30008 Additional equipment, labor,and materials to fix grade conflict at MH 23-9, com lete as specified Hours 0.00 1.00 1.00 $750.00 $750.00 30009 Additional equipment, labor, and materials to slurry an 8-inch sanitary sewer that was not properly abandoned in the intersection of West 24th Avenue and Doty Street, Lump complete as specified Sum 0.00 1.00 1.00 $1,790.44 $1,790.44 30010 Additional equipment, labor,and materials to insulate sanitary lateral to restroom at boat launch due to shallow cover, Lump complete as s ecified Sum 0.00 1.00 1.00 $520.00 $520.00 ADDITIONAL WORK: C.O.#1-(ITEMS 3216,3240,&30000-30010)-SUB-TOTAL $28,123.49 $0.00 NET DECREASE TO: SECTION III ($16,495.48) SECTION IV-WATER MAIN ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4000 Furnish and install 4" ductile iron water main with poly wrap relay,complete Linear as s ecified Feet 100 64.00 -36.00 $68.50 $2,466.00 4002 Furnish and install 6" ductile iron water main with poly wrap relay,complete Linear as s ecified Feet 700 622.00 -78.00 $69.70 $5,436.60 4004 Furnish and install 8" ductile iron water main with poly wrap relay,complete Linear as s ecified Feet 1,400 1369.00 -31.00 $75.00 $2,325.00 Page 14 of 20 � CONTRACT: 13-OS CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE pRICE 4005 Furnish and install 8" ductile iron water main with poly wrap relay and Snap- Loc restrained joints, complete as specified Linear Feet 200 0.00 -200.00 $75.25 $15,050.00 4008 Furnish and install 12" ductile iron water main with poly wrap relay,complete Linear as s ecified Feet 90 79.00 -11.00 $130.00 $1,430.00 4010 Furnish and install 16" ductile iron water main with poly wrap relay,complete Linear as specified Feet 3,800 3776.00 -24.00 $93.60 $2,246.40 4036 Furnish and install 1"water service relay,complete as Linear s ecified Feet 1,775 1916.00 141.00 $35.00 $4,935.00 4037 Furnish and install 1%<" water service relay, Linear com lete as s ecified Feet 25 21.50 -3.50 $38.25 $133.88 4038 Furnish and install 1'/:" water service relay, Linear com lete as s ecified Feet 25 81.00 56.00 $50.00 $2,800.00 4040 Furnish and install 2"water service relay,complete as Linear s ecified Feet 75 133.00 58.00 $66.00 $3,828.00 4042 Furnish and install 1"water service new,complete as Linear s ecified Feet 60 46.50 -13.50 $35.00 $472.50 4048 Furnish and install 1" corporation and stop box, com lete as s ecified Each 75 69.00 -6.00 $339.00 $2,034.00 4050 Furnish and install 1'/:' corporation and stop box, com lete as s ecified Each 1 1.00 $500.00 4051 Furnish and install 1'/z" corporation and stop box, com lete as s ecified Each 1 2.00 1.00 $788.00 $788.00 4053 Furnish and install 2" corporation and stop box, com lete as s ecified Each 1 3.00 2.00 $964.00 $1,928.00 4055 Furnish and install water service clay dams, com lete as s ecified Each 80 74.00 -6.00 $100.00 $600.00 4056 Furnish and install connections to existing 4" water main,complete as specified Each 3 1.00 -2.00 $1,100.00 $2,200.00 4058 Furnish and install connections to existing 6" water main,complete as specified Each 20 20.00 $1,350.00 4060 Furnish and install connections to existing 8" water main,complete as s ecified Each 6 6.00 $1,700.00 4064 Furnish and install connections to existing 12" water main,complete as specified Each 3 3.00 $2,400.00 Page 15 of 20 CONTRACT: 13-05 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4066 Furnish and install connections to existing 16 "water main,complete as specified Each 1 1.00 $3,500.00 4101 Furnish and install 6"x 6" tee,complete as specified Each 1 1.00 $259.00 4110 Furnish and install 8"x 6" tee,complete as specified Each 3 4.00 1.00 $330.00 $330.00 4111 Furnish and install 8"x 8" tee,complete as specified Each 2 4.00 2.00 $445.00 $890.00 4136 Furnish and install 16"x 4" tee,complete as specified Each 3 0.00 -3.00 $1,258.00 $3,774.00 4137 Furnish and install 16"x 6" tee, complete as specified Each 13 14.00 1.00 $1,123.00 $1,123.00 4138 Furnish and install 16"x 8" tee,complete as specified Each 1 2.00 1.00 $1,389.00 $1,389.00 4140 Furnish and install 16"x 12"tee,complete as s ecified Each 1 1.00 $2,385.00 4141 Furnish and install 16"x 16"tee, complete as s ecified Each 2 2.00 $2,200.00 4189 Furnish and install 8"x 8" cross,complete as s ecified Each 3 3.00 $574.00 4192 Furnish and install 8"x 16" cross,complete as s ecified Each 1 1.00 $1,390.00 4207 Furnish and install 16"x 16"cross,complete as s ecified Each 1 1.00 $2,650.00 4218 Furnish and install 6"11'/a bend,complete as s ecified Each 1 2.00 1.00 $188.00 $188.00 4222 Furnish and install 16" 11%a bend,complete as s ecified Each 1 1.00 $996.00 4235 Furnish and install 4"45° bend, complete as s ecified Each 7 2.00 -5.00 $133.00 $665.00 4236 Furnish and install 6"45° bend, complete as s ecified Each 65 78.00 13.00 $184.00 $2,392.00 4237 Furnish and install 8"45° bend, complete as s ecified Each 16 13.00 -3.00 $250.00 $750.00 4239 Fumish and install 12"45° bend, complete as s ecified Each 5 5.00 $543.00 4240 Furnish and install 16"45° bend, complete as s ecified Each 5 4.00 -1.00 $1,020.00 $1,020.00 4264 Furnish and install 8"x 6" reducer,complete as s ecified Each 17 17.00 $218.00 Page 16 of 20 CONTRACT: 13-05 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE lN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE pRICE 4273 Furnish and install 16"x 6" reducer,complete as s ecified Each 1 1.00 $818.00 4274 Furnish and install 16"x 8" reducer,complete as s ecified Each 2 2.00 $781.00 4276 Furnish and install 16"x 12"reducer,complete as s ecified Each 2 2.00 $836.00 4352 Cut and cap existing 6" water main,complete as s ecified Each 2 8.00 6.00 $174.00 $1,044.00 4354 Cut and cap existing S" water main,complete as s ecified Each 4 4.00 $229.00 4358 Cut and cap existing 12" water main,complete as s ecified Each 1 1.00 $395.00 4400 Furnish and install 4"gate valve, complete as s ecified Each 4 2.00 -2.00 $774.00 $1,548.00 4401 Furnish and install 6"gate valve,complete as s ecified Each 22 16.00 -6.00 $920.00 $5,520.00 4402 Furnish and install 8"gate valve,complete as s ecified Each 24 25.00 1.00 $1,282.00 $1,282.00 4404 Furnish and install 12"gate valve,complete as s ecified Each 1 1.00 $2,276.00 4405 Furnish and install 16"gate valve,complete as s ecified Each 20 17.00 -3.00 $5,146.00 $15,438.00 4420 Furnish and install 6"x 8" tapping valve&sleeve, com lete as s ecified Each 2 1.00 -1.00 $3,301.00 $3,301.00 4500 Furnish and install hydrant, complete as specified Each 14 13.00 -1.00 $3,403.00 $3,403.00 4501 Relocate existing hydrant, complete as specified Each 1 2.00 1.00 $1,035.00 $1,035.00 4502 Furnish and install gradelok for hydrant branches, complete as s ecified Each 14 0.00 -14.00 $0.01 $p.14 4700 Jack and bore 18"steel casing pipe, complete as Linear s ecified Feet 80 0.00 -80.00 $422.00 $33,760.00 4712 Furnish and install 2"steel casing pipe,complete as Linear s ecified Feet 550 540.00 -10.00 $30.00 $300.00 4714 Furnish and install 4"steel casing pipe,complete as Linear s ecified Feet 25 36.00 11.00 $40.00 $440.00 4722 Furnish and install 12" steel casing pipe, Linear com lete as s ecified Feet 20 40.00 20.00 $64.00 $1,280.00 4724 Furnish and install 16" steel casing pipe, Linear com lete as s ecified Feet 20 40.00 20.00 $74.00 $1,480.00 Page 17 of 20 CONTRACT: 13-05 CHANGE ORDER#1 ITEM BlD INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4728 Furnish and install 20" steel casing pipe, Linear com lete as s ecified Feet 20 20.00 $82.30 4732 Furnish and install 30" steel casing pipe, Linear com lete as s ecified Feet 20 20.00 $116.50 4900 Abandon water main on West 19th Avenue, Lump com lete as s ecified Sum 1 1.00 $4,500.00 4902 Abandon water main on West 23rd Avenue, Lump com lete as s ecified Sum 1 1.00 $7,000.00 4904 Abandon water main on West 24th Avenue, Lump com lete as s ecified Sum 1 1.00 $3,000.00 4906 Abandon water main on Doty Street,complete as Lump s ecified Sum 1 1.00 $1,000.00 4908 Abandon water main on Montana Street,complete Lump as s ecified Sum 1 1.00 $1,000.00 4920 Remove water main, Linear com lete as s ecified Feet 1,225 853.00 -372.00 $14.00 $5,208.00 4950 Water main utility line opening, complete as s ecified Each 5 2.00 -3.00 $400.00 $1,200.00 4990 Excavation special(water), complete as specified Tons 550 0.00 -550.00 $7.00 $3,850.00 4991 Bentonite slurry dam (water),complete as s ecified Each 4 2.00 -2.00 $200.00 $400.00 SECTION IV-(BID ITEMS 4000-4091)-SUB-TOTALS $27,152.00 ($114,531.52) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION IV ITEM BID INSTALLED NET NET UNIT INCREASE lN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4219 Furnish and install 8"11- 1/4°bend,complete as s ecified Each 0.00 2.00 2.00 $246.00 $492.00 4227 Furnish and install 6"22- 1/2°bend,complete as s ecified Each 0.00 1.00 1.00 $184.00 $184.00 4246 Furnish and install 8"90° bend,complete as s ecified Each 0.00 2.00 2.00 $275.00 $550.00 4262 Furnish and install 6"x 4" reducer,complete as s ecified Each 0.00 1.00 1.00 $200.00 $200.00 40000 Additional equipment, labor, and materials to move existing 16-inch water main due to conflict in the intersection of West 23rd Avenue and Oregon Street,complete as specified Hours 0.00 5.00 5.00 $750.00 $3,750.00 Page 18 of 20 CONTRACT: 13-05 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE lN DECREASE IN NUMBER DESCRIPTION UNIT qUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 40001 Additional equipment, labor,and materials to move existing 12-inch water main due to conflict in the intersection of West 23rd Avenue and Minnesota Street, complete as specified Hours 0.00 1.00 1.00 $750.00 $750.00 40002 Additional equipment, labor,and materials to take apart main T-15 and install new 16"x 8"Tee due to larger water service, complete as specified Hours 0.00 2.00 2.00 $750.00 $1,500.00 40003 Additional equipment, labor, and materials to change V-30 from 4-inch to 2-inch due to smaller water service,complete as s ecified Hours 0.00 1.00 1.00 $750.00 $750.00 40004 Additional equipment, labor,and materials to fix blown out water main on September 16,2013, complete as specified Hours 0.00 1.50 1.50 $750.00 $1,125.00 40005 Additional equipment, labor, materials,and crew down time to determine how to relay water service to Oshkosh Truck that changed sizes and was in conflict with sanitary sewer lateral, complete as specified Hours 0.00 3.00 3.00 $750.00 $2,250.00 40006 Additional equipment, labor,and matreials to redo the watermain at the end of West 23rd Avenue, once it was determined that the water main extension to the west was being eliminated from the contract,complete as specified Hours 0.00 2.00 2.00 $750.00 $1,500.00 40007 Additional equipment, labor,and materials to fix water main leak in the intersection West 19th Avenue and Delaware Street, complete as specified Hours 0.00 1.50 1.50 $750.00 $1,125.00 40008 Additional equipment, labor,and materials to unhook hydrant tee at West 24th Avenue and Doty Street due to relocation of hydrant, complete as specified Hours 0.00 2.00 2.00 $750.00 $1,500.00 Page 19 of 20 ' CONTRACT: 13-05 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACTPRICE CONTRACT PRICE 40009 Additional equipment, labor,and materials to cut down on West 23rd Avenue,when sidewalk was lowered,complete as Lump s ecified Sum 0.00 1.00 1.00 $525.00 $525.00 ADDITIONAL WORK: C.O.#7 (ITEMS 4219,4227,4246,4262,8 40000-40009)-SUB-TOTAL $16,201.00 $0.00 NET DECREASE TO: SECTION IV ($71,178.52) NET INCREASE TO SECTIONS I,II,III,IV $499,290.60 NET DECREASE TO SECTIONS I,II,III,IV ($803,312.43) NET DECREASE TO CONTRACT: ($304,021.83) Page 20 of 20