HomeMy WebLinkAboutPW CNT 12-03/CHG OR 4 DEPARTMENT OF PUBLIC WORKS
215 Church Avenue �
P.O.Box 1130 �
Oshkosh,Wisconsin 54903-1130
Ph.(920)236-5065
Fax(920)236-5068 Q HKOIH
ON THE WATER
September 3, 2014
Mr. Glenn Joski
Advance Construction
2141 Woodale Avenue
Green Bay, WI 54313
Re: Change Order No. 4 (Final)
Contract 12-03
Dear Mr. Joski:
Enclosed is an executed copy of Change Order No. 4 (Final) between the City of Oshkosh and Advance
Construction regarding the abovementioned project.
If you have any questions,please call our office at(920)236-5065.
Sincerely,
_ n n�
`! �/ � � I
David C. Patek
Director of Public Works
DCP/tlt
Enclosure: Change Order No. 4 (Final)
cc: P�m L?brig, City Clerk(w/original)
Lynn Lorenson, City Attorney(w/copy)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
I:�Engineering\I2-03 Sawyer Creek Channel Improvements�Project_Information\Contract Info\Change Orders\12-03 Page 1 of 1
Executed CO#4(Final)Lv_9-3-14.docx
� ,
TO: Advance Construction CHANGE ORDER#4(FINAL)
2141 Woodale Avenue DATEp:August 8, 2014
Green Bay, WI 54313
Your present contract wifh the City of 4shkosh, Contract No.12-03, awarded May 22, 2012, is hereby
amended and changed as follows:
NET DECREASE TO: SECTION 1-PAVING 0.00
NET INCREASE TO: SECTION 11-STORM SEWER 17,330.75
NET DECREASE TO: SECTlON 111-SANITARY SEWER 0.00
1N
NET�CREASE TO CONTRACT $17,330.75
���
Sectlon I Seckion II Sectlon lll
(Paving) (Storm} (Sanitary) 7otaEs
eid Total $1,754,605.00 $759,362.00 $82,200.00 $2,596,167.00
C.O.#1 $$Q,452.50 $100,798.02 $4.00 $161,250.52
Prev. Contract Totai $1,815,057.50 $860,160.02 $82,200.00 $2,757,417.52
C.O.#2 $0.00 $487,429.43 $4.00 $487,429.43
i'rev. ContractTotal $1,8'i5,057.50 $1,347,589.45 ti�C�� $82,200A0 $3,244,846.95 �
C.O.#3 ($149,844.60) $62,748,89�.�.��' ���1,555.00) (.$88,649.7�)�����52.1�� `�
Prev.ContractTotal $1,665,212.90 ����3� 3y $80,645.00 �56��,'-Q4 �3, ISb�1g�t.Z`I ,►A �
C.O.#4 $0.00 $17,330.75 � hs� $0.00 $17,330.75
COIVTRACT TOTAL �1,666s242.90 .�.r4?�7�6�6:99' �$0,845.00 $3;�3,52Z�13 3,��3�szy• 9q ,,� �
�1;�'L'1,tetr-1. tXi �„D
CITY OF OSHKOSH
BY: �
e.�— �.
Recommended: City Mana �
�:� -p�-.��
Director of Public Works City C1erk �
Appr ved and accepted:
Contr or
1 certify that pravision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin,
under#he within Change Order.
��������
� Comptroller
Approved a to form:
RECEIV��
City SEP 2 4 2014
�------------
C1TY C:I,F;,RK'S OFFICE:
. CONTRACT:12-03 CHANGE ORDER#4
SECT�ON I-PAVING
lTEM CONTRACT INSTALLED NET NET UMT 1NCREASEIN DECREASElN
NUMBER p£SCRlPTlON UNlT QUANTITY QUANTlTlES INCREASE DECREASE PRICE CONTRACT CONTR,4C1'
PRlCE PRlCE
Furnish and Install Traffic Lump
1000 Control Sum 1.00 1.00 $20,000.00
Furnish and Install Boat Lump
1001 7raffic Conirol Sum 1.00 1.00 $8 400.00
Lump
1002 Excavation Mechanical Sum 1.00 1.00 $241 650.00
Lump
1003 Excavation,H draulic Sum 1.00 1.00 $623 480.00
Excavation,Fishing Hole Lump
1004 Es !e Slreef Sum 1.00 1.00 $88 000.00
Excavation,Fishing Hole Lump
1005 Hawk Street Sum 0.00 0.00 $132,000,00
Excavatlon and Placement, Lump
1006 C1a Liner Sum 0.00 0.00 $1i,650,00
1007 Excavation,S ecial Dollars 53,094.83 53,094.83 $1.00
1008 Dewaterin Each 4.00 4.00 $1 000.00
Linear
1009 Cofferdam Feet 0.00 Q.00 $3fi0.00
Lump
1010 Seawall Assessment Sum 1.00 1.00 $10 000.00
Lump
1011 Seawall Lacation Sum '1.00 1.00 $5 OOO.QO
Concrete Pavement Square
1012 Removal Yard 323.33 323.33 $10.00
Concrete Sidewalk and Square
1013 Drivewa Removal Yard 82.91 82.99 $8.00
Undercut and Undercut
10i4 Backfill Ton 0.00 0.00 $15.60
8-1NCH Non-Reinforced Square
1015 Concrete Pavement Yard 290.44 290.44 $53.50
5quare
1018 4-INCH Concrete Sldewalk Foot 205.00 205.00 $4.20
Square
1017 8-lWCH Concrete Sidewalk Foot 495.89 495.89 $4.76
Square
1018 6-IiVCH Concrete Drivewa Foot 45.28 45.28 $4.75
Square
1019 31/2-IN As haltic Concrete Yard 630.1d 830.10 $18.90
Remove 30-1N Curb and Linear
1020 Gutter Feet 177.00 177.0� $5.00
Linear
1021 30-IN Curb and Gutter Feet 177.00 177.00 $33.00
Linear
1022 12-IN Radius Curb Head Feet 0.00 0.0� $33.60
Square
1023 Deiectable Warnin Plates Feet 6.00 6.OQ $35.00
9024 Ad'ustCastin s Each 10.00 10.00 $350.Ob
Salvage and Relnstsll Linear
i025 Guardrail Feet 85.00 65.00 $30.00
Page 2 of 9
CONTRACT:72-03 CHANC3E ORDE#t#4
lTEM CONTRACT lNSTALLEp NET NET UN1T fNCREASElN DECREASEIN
NUMBER aESCRIP710N UN1T QUANTITY ctuanrrir��s lNCRFASE DECREASE PRfCE �NTRACI' CONTR.4CT
PR10E PRlCE
f2emove and Replace Lihear
1026 Guardraif Feet 0.00 0.00 $40.00
SEC710N i-(B!D 1TEMS 1000-1628)-SUB•T07A1. 30.00 $0.00
ADQITIONAL WORK REQUIRED: C.O.#1 -SECTION[
ITFM CONTRACT lNS7AtLED NET NET UNlT !lYCREASElN DECREASElN
NUMBER DESCRIP7lON UNlT QUAN7ITY QUANTITIES 1NCREASE DECRERSE PRlCE CONTRACT CON7i?ACT
PRICE PRlCE
10001 l.fnear
Cofferdam Feat 310.00 310.00 $400.00
10002 Hydraulic excavalion of Lump
Hawk Street Flshin Hole Sum 1.00 1.00 $65118.00
Hydraulic excavatlon of
90003 "lsland"between etalions Lump
38 and 44 Sum 1.00 1.00 $167,445.00
10004 Lump
Tree removal at"is[and" Sum 1.00 1.00 $2,500.00
'f 0005 Lump
Abutment removal Sum 1.00 1.00 $2,000.00
10006 Tree removal at 917 Lump
Brookwood Court Sum 1.00 1.00 $3,363.50
ADDITIONAL WORK: C.O.#1-(ITEM3100U1-10006)-SUB•TOTAL $0.00 $0.00
NET DECREASE T0: SEC1'ION I $0.00
3ECT10H II•STORiIA SEWER
ITEM CONTRACT lNSTALLED NET NE'T UNtT rNCREASE 1N DECREASE IN
1VUM8ER DESCRlPTION Uk�r QUAN7ITY QUAN71TfES iIVCREASE D�CRFASE PRICE CONTRACT CONTRACT
PRlCE PRfCE
Mobllization,complete as Lump
2000 s ecified Sum 1.00 1.00 $218,500.00
Clear Trees,complete as tnch
200a s ecifisd Diameter 3,085,00 3 085.00 $15.00
Clear Shrubs,complete as Lump
2008 s ecifled Sum 1.00 i.00 $14 000.00
Grub Stumps,complete as lnch
2010 s ec3f€ed Diameter 2,271.00 2,27i.U0 $10.00
Storm sewer Utllfty Une
Opening(ULO),complete
2014 as s ecified Each 0.00 0.00 $1,000.00
Furnish and install 95"RCA
Class lll Siorm Sewar, Linear
2044 com lete as s eclfled Feet 111.00 111.00 $67.00
Furnlsh and install 18"RCP
Class ill Starm Sewer, Linear
2050 com lete as s ecifed Feet 43.00 43.00 $72.00
Page 3 of 9
� CONTRACT:9Z•03 CHANOE ORDER#4
l7EM CON7RACT lNSTALLFD NET NET UNIT
fNCREAS�JN DECREASE 1N
NUMBER DESCRfPTION UN1T qUAN71TY QUANTlTlES 1NCREASE DECRF�ISE PRlCE CONTRACT CONTR,4CT
PR/CE PRlCE
Furrtish and instal124"RCP
Class III Storm Sewer, Linear
2U62 com lete as s eciFled Feet 13.00 93.00 $83.00
Furnlsh and install 30"RCP
Class III Storm Sewer, Lfnear
2074 com lete as s ecifted Feet 176.00 176.00 $93.00
Furnish and instell 48"RCP
Class Ill Storm Sewar, Linear
2092 com lete as s ecifled Feet 92.00 92.00 $132.35
Furrtish and tnsta1154"RCP
Class III Storm Sewer, Linear
2098 com lete as s ecifIed Feet 166.00 168.00 $167.00
Furnish and lnstall 24"x
38"HERCP Class ill Storm
Sewer,complete as Linear
2128 s ecitied Feet 25.00 25.00 $140.00
Furnish and install 34"x
53"HERCP Class Ill Storm
Sewer,complete as Linear
2136 s ecifled Feet 155.00 155.Oa $168.00
Furn3sh and instal115"RCP
Class III Apron Endwall w/
joint ties,complete as
2302 s ecified Each 1.00 1.00 $965.00
Furrtish and install 18"RCP
Class III Apron Endwall w!
joint fies,complete as
2304 s ecified Each 1.06 1.00 $1,000.00
Furnish artd install 24"RCP
Class 111 Apron Endwall w/
joint ties,complete as
2308 s ecified Esch 1.00 1.Ob $1,100.00
Furnish and install 30"RCP
Class III Apran Endwall wl
joint ties,camplete as
2312 s eciffed Each 1.00 1.00 $1,205.00
Furnish and insta1148"RCP
Class III Apron Endwaff w!
folnt tfes,complste as
2398 s ecifled Each 1.00 9.00 $2,260.00
Furnish and insiall 54"RCP
Class 111 Apron Endwal]w/
joint ties,complefe as
2320 s ecified Each 2.00 2.00 $3 460.00
Furnish and insfall 2a"x
38"RCP Class III Apron
Endwall w/jolnt ties,
2332 com lete as s ecifced Each 1.00 1.00 $1,560.00
Furnish and install 34"x
53"RCP Class 111 Apron
Endwall w/jo(nt ties,
2336 com lefe as s ecified Esch 2,00 2.00 $2 480.00
Furnish and instell
' Stendard Slarm Manhole
(4'diameter),complete as VeNcal
2532 s ecified Feet 7.80 7.80 $300.00
Page 4 of 9
CONTf2AC'C:12-03 CHANGE ORDER#4
!TE'M CONTRACT lNSTALLED NET NET UNlT �NCREASElN DECREASEfN
NUMBER p�SCR/AT10lV UNIT QUAN7JTY QUANTITlES /NCREASE DECREAS� PRlCE COIVTRACT CONTRACT
PRICF PRlCE
Furnish and install
Standard Storm Manhole
(5'diameter),compiete as Vertical
2534 s ecifled Feet 5.40 5.40 $380.00
Furnish and install
Standard Storm Manhole
(8'dlameter),complete as Vertical
2536 s ecified Feet 4,20 4.20 $530.00
Furnish and fnslall
Standard Storm Ma�hols
(7'diameter),complete as Vertica!
2538 s ecified Feet 28.81 28.81 $800,00
Furnish and install Type 3
2614Inlet w/'f8'Sum Each 1.00 'I.00 $1,500.00
Connect to Existing Storm
Sewer,complete as
2800 s acified Each 97.00 17.00 $6,500.00
Furnish,install,maintain
and remove Type D Inlet
Profection,complete as
2856 s ecifled �ach 34.00 34.00 $95.00
F'urnish,instell,maintain
and remove Stone
Tracking Pad,complete as
2862 s ec�fied Each 5.00 5.00 $1,50Q.00
�urnlsh,install,maintain
and remove Silt�ence, Unear
2864 com lete as s eclffed Feet 1,784.50 1,784.50 $1.50
Furnish,install,maintain
and remove Stona Bag,
2866 com lete as s ecified Each 0.00 0.00 $20.00
Fumish,install,maintain
and remove Turbidity
Barrier,complete as
2876 s ecified Each 10.00 10.00 $750.00
Furnish&install Turf
Reinforcement firlat
System,complete as Square
2936 s ecified Yartfs 421.70 421.70 $'f7.00
Furnish and install Medlum
Rip-Rap w/Filter Fabric, Square
2948 com lete as s ec(Oed Yards 0.00 0,00 $58.00
Furnish and install Heavy
Rip-Rap w!�(lier Fabric, Square
2948 com lete as s ecified Yards 199.40 199.40 $62.00
Furnish and install In-
Stream Boulder,complete
2959 as s ecified Each 24.00 24.00 $225.00
Furnish and install Woody
Debris Fish Nabitat,
2953 com lete as s ecified Each 8.00 8.00 $i,00o.00
Furnish and Install Canoe
2955 taunch Each 2.00 2.00 $750.00
ConsRruction Access
Restoration A,complate as Lump
2957 s eciTied Sum 1.00 1.00 $5 800.00
Page 5 of 8
CONTRACT:12-03 CHAN(3E ORDER#4
ITEM CONTRACT fNSTALLED NET NET UNIT JNCREASE 1N DECREASE IN
NUMBER DESCRIPTION UNI7 QUANTlTY QUANTfT1ES lNCREASE DFCREASE PRICE CONTRACT CONTR,4C?'
pR10E PRfCF
Construction Access
Restoration B,complete as tump
2955 s ecl�ed Sum 1.00 1.00 $92,400.00
Construction Access
Rastoration C,complete as Lump
2961 s ecifled Sum 1.00 9.00 $10 600.00
Constniction Access
Restoratlon D,complete as Lump
2963 s ec3fied Sum 1.00 1.06 $7 800,00
Construclion Access
Restoration E,complete as Lump
2965 s ec3Fied Sum 1.00 1.00 $8,800.80
Construclion Access
Resioratlon F,complela as Lump
2967 s ecified Sum 1.00 '1.00 $2,700.Ofl
ConsttuCUon Access
Restoration G,complete as Lump
2969 s ecified Sum 1.00 9.Oa $16,600.00
Furn[sh and install
Vegetated Boulder
ReveEment,comple#e as Linear
2971 s ecifled Fee# 959.00 959.00 $31.00
Furnish and install Live
Stakes,complete as
2973 s ecifed Each 1,269.00 1 269,00 $5.00
Furnish and install Naiive
Rhizome Plugs,complete
2975 as s ecified Each 262.00 262.00 $4.21
SECTION II-(BID ITEMS 2000-2975)-3U8-TOTALS 50.00 SO.OQ
ADDITIONAL WORK REQUIRED; C.O.#1 SECTfON If
ITEM CONTR,4CT INSTALLED NET NET UN1T 1NCREASEIN DECREASEIN
NUMeER • DESCRIPT10fY UNlT qUANTlTY QUANTlTIES JNCREASE DECREASS PRICE ��NTR,4CT CONTRACT
PRlCE PRfCE
2U001 Additional turbldity Lump
monitorin Sum 'f.00 1.00 $2 625.00
Tree grubbing and disposat Lump
20002 at"isFand" Sum 1.00 i.aa $8,212.50
2d003 Remove Miscellaneous Lump
Pilin s Sum 1.00 1.00 $2,625.00
20004 Remove and reinstalf 54" Lump
endwall Snm 1.00 1,00 $'f,70U.00
20005 Resloration at 903 Lump
Brookwood Court Sum 1.00 1.00 $6,500.00
Llnear
20006 12"storm sewer Feet 64.00 64.00 $64.00
ADDITIONAL WORK:C.O.#9 (ITEMS 20004-20006)-SUB-TOTAL 50.00 $0.00
Page 6 of 9
CONTRACT:12-03 CHAN(iE ORDER#4
1TEM CON7liAC1' lNS1"ALLED NET hlET UNlT 1NC1iEASEIN p�CREASE/N
NUMBER DESCRlPT10N UNIT QuANT1TY QUANTlTfES /NCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRiCE
AQDITIONAL WORK RE RED: . . TION II
l7SM CONTRACT lNSTALLED NET NET UNlT 1NCREASE IN AECREASE!N
NUMBER DESCRlPTION UNlT QUAN717Y QUANRT/ES INCREASE DECREASE PlilCE CON7f2ACT CONTRACT
PRfCE PR10E
20007 2a�3&2014 Mabilization& Lump
Demobilizaiion Sum 1.OU 1.00 $96,335.00
2fl0�8 Lump
AI oma Park Site Sum 1.00 1.00 $18,469.50
20009 sauman Par1c Lump
UncontaminatedSite Sum 0.77 0.17 $26345.00
20010 sauman Aark l.ump
Confamineted Site Sum 9.00 1.00 $60,714.00
20091 Additional Contaminated Lump
Sadlment Dred in Costs Sum 1.00 1.00 $144 000.00
20092 Additional BoatTrafflc Lump
Control Sum 1.00 1.00 $8 Ab0.00
Addllional Turbidity LumA
20093 Manitoring 8�Test
Sam lin S�� i.00 1.00 $2,625.00
20014 �'��Q
Additional Traffic Control Sum 1.00 1.00 $5,000.06
Dredge&ACI Crew
20015 Standb 7ime Dey O.UO O.QO $3,937.00
20078 Lump
Lost Ba Ca aci Sum 1.00 9.00 $38,571.50
20017 Additianal Palymers to gaEn Gallon
control of contaminated
sediment'12 season 400.00 400.00 $12,60
Hauling cantaminated
20018 sediment'12 season Tons 4157.71 4157.71 $6.80
Trucking contaminated
20019 sediment'13 season Hours 360.50 360.50 $95.00
Additional excavator time
2002U for contaminated sedimant Hours
'13 season 66.50 68,50 $125.00
20021 l.inear
Goose Fence Feet 859.00 858.OU $2.10
ADDITIONAL WORK:C.O.#2-(ITEMS 20007-20021)-SUB-TOTAL $0.00 b0.00
ADDITlONAL WORK REQUIRED: C.O.#3 SECTlON il
1TEM CONTRACT 11VSTALLE� IV&T NET UN1T rNCREASElN DECREASEIN
NUMBER DESCRIPTlON UNlT QUANTITY QUANTITlES tNCREAS& DECREASE PR10E CONTRACT CONTR4C7
PRlCE PR10E
Constructlon of
21000 Dewatering\ Lump Sum
Transfer Site-Mechanical 1,00 1.Ob $11 000.00
2100'f Additlonal Cost Mechanicai Cubic
Yards 7,000.00 7 000.00 $13.i2
Additona!Trucicing for Cubic
2�002 Mechanica[{y Dredged Yards
Materia! 7,000.00 7,000.00 $3.50
Page 7 of 8
� CONTRACT:12•03 CHANGE ORDER#4
lTEM CONTRACT 1NSTALLEA NET NET UN1T lNCREASElN DECREASElN
NUMBER DESCRIPTION UNlT QUANTlTY QUANTiT1ES lNCREASE DECREASE PRICE CONTRAC7 CONTRACT
PRlCE PR10E
Additonal sanitary lateral
21003 work at 1301 Oshkosh Ave. Lump Sum
1.00 1.00 $2,500.00
21004 Additonal grading for Ball �ump Sum
Diamond Restoration 1.00 1.00 $a,SU0.00
ApDIT10NAL WORK:C.O.#3-(]TEMS 2180D-21002)-SUB-TOTAL $0.00 .50.00
ADDI710NAL WORK R�QUIRED: C.p.#4 SECTION II
lTEM COlJTR4CT lNSTALLED NET NET UNlT �NCRFAS�lN DECREASEIN
N1IMBER a�SCRlPT/0N UNIT QUANT/TY QUANTlTIFS INCREASE DFCRFr�SE PR10E CONTRACT CONTR.4C7
PRfCE PRlCE
Drain Ti1e for Ball Diamond
21005 unear
Feet 0.00 470.00 470.00 $25.00 $11,750.00
Clear Stone for Batl
21006 p}amond Tons p.00 446.46 446.46 $12.50 $5 580.75
ADDITIONAL WORK:C,Q.f�4-(ITEM3 29005-21006}-SUB-TOTAL 577,330.75 $0.00
NET INCREASE TO: SECTIOtJ[I 597,33U,75
SECTION III-BANITARY SEWER
ITEM BlD lNSTALLED NET NE7' UNJT 1NCREASEIN DECREASEIN
NUMBER DESCRlP710N UNlT QUANTITY QUANT117ES lNCREASE p�CREASE PR10E CONTRAC7 CONTRACT
PRlCE ARfCE
3035 Furnish and(nstall 4-inch
and 12-inch HDPE ssnitary Lump
sewer syphon,complete as Sum
specifled 1.00 1.00 $50,000.00
3102 Furnish and install
standard sanitary manhole Veriical
{5'dlameter),complete as Feet
specified 12.89 12.89 $500.00
3114 Furnish and install external
manhole chimney seal, Each
complete as apecifled
1.U0 1.00 $500.00
3304 Furnlsh and inslall
connections to existing 12"
mains,complete as Each
speclfled 2.00 2.00 $3,000.00
Page 8 of 9
CONTRACT:12•03 CHANGE ORDER#4
!1'EM CONTRACT lNSTALL�D NET NET UN1T rNCREASEfN DECREASElM
NUMBER DESCRIPTION UNfT QUANTlT1' QUANTITlES lNCREASE DECRF..4SE PRlCE CONTRACT CONTRACT
PRICE ARICE
3850 Remove sanitary sewer, Lump
complete as specified Sum 1.00 1.00 $17,700.00
SECTIOW ill-(B1D ITEMS 3035-3854�-SUB-T07AL $0.00 a0.00
NET DECREASE TO; SECTfON III Q.00
NET INGREASE 70 SECTIONS I,II,UI 317,330.75
NET DECREASE TO SECTIONS I,II,IEI $0.00
NET DECREASE TO CONTRACT 12•Q3: 517,334.76
Page 9 of 9