HomeMy WebLinkAboutAment Construction/Cgh Or3/Con 78-18A/golf course YARBRO - KEMPINGER OWNER'S COPY ARCHITECTS 1018 WEST SOUTH PARK AVENUE BOX 2096 11414/235-3310 OSHKOSH, WISCONSIN 54901 CHANGE ORDER NO. G-3—__ FILE NO. 7806 DATE 30 May 1979 OWNER: City of Oshkosh, Wisconsin Ament Construction Co. CONTRACTOR: 900 S. Westland Dr. , Appleton, Wis. 54911__ General Construction Work, New Clubhouse CONTRACT FOR: Municipal Golf Course Clubhouse IT IS HEREBY MUTUALLY AGREED THAT THE FOLLOWING CHANGE IN THE WORK AS COMPRISED IN THE ORIGINAL CONTRACT DATED 8 Sept_ 1978 _SHALL BE COMPLETED IN ACCORDANCE WITH THE CONTRACTOR'S PROPOSAL)F May 21&May 24 WMDEMRXEXMXMKNXECOMUKMEXXMINWXX, the Architects letter of May 30, 1979, and subject to the terms of the contract. 1. Provide wood catwalk above room #102 in area of heating equipment and enclose plumbing vent in room #104. ADD $ 87 .94 2. For exterior stain not applied to siding. DEDUCT 50 . 00 3. For additional paving and walks, To sawcut exist- ing blacktop, and spread top soil . ADD 976. 47 4 . Adjustment to vinyl wall fabric allowance DEDUCT 240 . 00 NET CONTRACT ADD $774 . 41 Contractors proposals of May 21 and May 24, 1979 , �. PR S V D Architects letter of May 30, 1979, are attached. L2/ 1' 9 � //, / - ' '".CR ATTORNEY 4 4f/S 'OSHKOSH,WISCON FOR THE SUM OF _SEVEN HUNDRED AND SEVENTY FOUR &41/100 _DOLLARS ($ 774 . 41 _)ADDED TO:INRDUCRIND FROM CONTRACT. ADD DEDUCT APPROVED PRIOR TO YARBRO-KEMPINGER THIS ORDER $ 736. 44 $2 , 972 .00 Asia--- -- - IT CTS , THIS ORDER 774 .41 ---- By �!= _. i ■ _ TOTAL TO DATE F A ent 1 o 4 truction Co. 1510 . 85 $2,972 .00 __ ACCEPTED --- ,��r(2.../........-- ORIGINAL CONTRACT $137, 747 . 00 -_- y �-� -�� � EXTRA ORDERS /'� 1,510_8 5 �/: "1 ,, f Witilit6OIRR CREDIT ORDERS City Manager 2,972. 00 r. NET TOTAL TO DATE ',E a-a $136 , 285 . 85 #041/1ALI it ".., =KIM City =rk City Comptroller Ament Construction Co. 900 S. 'Jestland Dr. Appleton, VVi. 54911 ay 21 , 1979 YarLro-Kempinger Oshkosh, Wi. Re : New Clubhouse Bldg. - Munl Golf Course . Labor &: materials required, for ramp to e^uip; ent area & enclose plumbing vent in Rm 104 storage. - Add _ 0$7.94 Credit on exterior painting - - Deduct - 00.00 AMENT CONSTRUCTION CO . 900 S. Westland Dr. Appleton, Wi. 54911 May 24, 79 Yarbro-Kempinger Oshkosh, Wi. Re : New Clubhouse Bldg. - Muny Golf Course Asphalt paving -Increase walk width, from 5 ft to 6 ft . - 060.00 -Two additional pcs of walk added - 360.00 - Add to saw & excavate - 60.00 780.00 quoted 780.00 -Saw & remove East blacktop ramp, spread topsoil. -Install dedication plague . Labor & materials - 196.47 Add - 4976.47 YARBRO - KEMPINGER ARCHITECTS 1015 WEST SOUTH PARK AVENUE BOX 2095 114141235-3310 OSHKOSH, WISCONSIN 54903 30 May 1979 Ament Construction Co. 900 S. Westland Drive 54911 Appleton, Wisconsin RE: File 7806 Muny Clubhouse Oshkosh, Wisconsin Mr. Ament: 1 wall llowing is the "Allowance" adjustment relative to viny Fo fabric on the above project. Attached, for reference, is a copy of the invoice sent to Roger Hull, dated 4/4/79 . 1979 . Also attached is a copy of your material takeoff dated May 26 , coffeebean 500 S .F. Sackcloth - sunflower 210 S .F . Sackcloth 710 S.F. = 13. 5 S .F. per lineal yd. Sackcloth 54" wide x one yard 13o5g- $ . 2844 per S.F. credit due. Cost per lineal yard $3. 84 . 284 per S .F. Allowance of $ . 6000 $224s07• credit due. $. 3156 x 710 Sequence orange henna 120 S.F. = 13. 5 per lineal yard. Sequence 54" wide x one yard long = $. 4622 per S .F . Cost per lineal yard $6. 24 . 462 per S.F. credit due. Allowance of $ . 6000 minus $ .4622 = $ • $. 1378 x 120 S .F. = $16. 53 credit due. Total Credit Due $24 0 . 00 The above total has been included in the final Change Order now being processed. Respectfully, YARBRO-KEMPINGER, ARCHITECTS By 0 Richard J. Kempinger RJK/rr cc: Boyd Kraemer Encl. (2)