Project No.: Armory Area Detention Basin
Tract No. 350-09-173, 1-350-09-173
RECEIVED
MAY 27 2014
PRELIMINARY WORK AGREEMENT DEPT. OF PUBLIC WORKS
OSHKOSH, WISCONSIN
Authorizing ANR Pipeline Company to provide the necessary pipeline marking,
pipeline depth determinations and construction monitoring to accommodate owner's
encroachments affecting our easement and pipelines in order to facilitate protection of
its pipeline facilities.
�? ////
This Agreement made this 10 day of /`7A , 2014, by and
between ANR Pipeline Company (hereinafter referred td as ANR) having its principal
office at 717 Texas Ave., Suite 2400, Houston, Texas 77002 and City of Oshkosh,
(hereinafter referred to as OWNER/DEVELOPER) having their mailing address at 215
Church Street, Oshkosh, WI 54901; and
WHEREAS, OWNER/DEVELOPER has proposed plans to improve lands in
Winnebago County, Wisconsin, resulting in a possible conflict with ANR's existing
pipeline facilities; and
WHEREAS, OWNER/DEVELOPER is desirous of having ANR perform certain
preliminary work and construction monitoring in accordance with the provisions of this
Agreement.
NOW, THEREFORE, both parties agree as follows:
1. ANR agrees to perform the necessary pipeline marking and construction
monitoring in order to protect its pipeline facilities.
2. ANR, upon the request of OWNER/DEVELOPER, agrees to furnish a preliminary
drawing showing its existing pipeline facilities to accommodate the plans of
OWNER/DEVELOPER and/or what requirements OWNER/DEVELOPER must
make in order protect ANR's existing pipelines and other facilities and appliances
appurtenant thereto.
3. OWNER/DEVELOPER agrees that prior to commencement of ANR's preliminary
survey and cost estimate, it will deposit with ANR a check in the amount of One
Thousand and no/100 dollars ($1000.00) to cover the cost of the preliminary
survey, inspection and supply cost. These services include coordinating with
and monitoring the activities of the OWNER's Contractor to ensure that
appropriate safety measures are in place while working around the high pressure
gas transmission mains.
4. Upon completion of the work by ANR and the accumulation of the total cost and
expenses, the unexpended balance, if any, shall be returned to
OWNER/DEVELOPER. If the sum advanced by OWNER/DEVELOPER to ANR
is insufficient to pay for the actual costs and expenses of the work, then
OWNER/DEVELOPER shall pay to ANR such additional sum as necessary to
s.
PRELIMINARY WORK AGREEMENT
Armory Area Detention Basin
Page 2
complete said work, within 45 days upon being furnished by ANR with a
statement of the amount over and above the estimated cost.
5. Any additions or modifications in the design of OWNER/DEVELOPER's
proposed plans submitted after the date of this contract causing ANR to further
alter or modify its pipeline and other facilities and appliances appurtenant thereto
shall be at the expense of OWNER/DEVELOPER, its successors and assigns,
and shall be performed only after a new or amended agreement is executed.
IN WITNESS WHEREOF, the parties hereunder have caused this contract to be
executed as of the day and year first above written.
WITNESS: OWNER/DEVELOPER:
City of Oshkosh
__a. =S= , By:
( l Title: C 1 J 414nwA4E/2
WITNESS: ANR PIPELINE COMPANY
k By: Alan Oslo's,*
6lN((,t.1 Title: Manager,Laid Msssgeuent
This instrument prepared by:
ANR Pipeline Company
Property Rights Services
W 3925 Pipeline Lane,
Eden, WI 53019