Loading...
HomeMy WebLinkAboutANR Pipeline Company 2014 r, r Project No.: Armory Area Detention Basin Tract No. 350-09-173, 1-350-09-173 RECEIVED MAY 27 2014 PRELIMINARY WORK AGREEMENT DEPT. OF PUBLIC WORKS OSHKOSH, WISCONSIN Authorizing ANR Pipeline Company to provide the necessary pipeline marking, pipeline depth determinations and construction monitoring to accommodate owner's encroachments affecting our easement and pipelines in order to facilitate protection of its pipeline facilities. �? //// This Agreement made this 10 day of /`7A , 2014, by and between ANR Pipeline Company (hereinafter referred td as ANR) having its principal office at 717 Texas Ave., Suite 2400, Houston, Texas 77002 and City of Oshkosh, (hereinafter referred to as OWNER/DEVELOPER) having their mailing address at 215 Church Street, Oshkosh, WI 54901; and WHEREAS, OWNER/DEVELOPER has proposed plans to improve lands in Winnebago County, Wisconsin, resulting in a possible conflict with ANR's existing pipeline facilities; and WHEREAS, OWNER/DEVELOPER is desirous of having ANR perform certain preliminary work and construction monitoring in accordance with the provisions of this Agreement. NOW, THEREFORE, both parties agree as follows: 1. ANR agrees to perform the necessary pipeline marking and construction monitoring in order to protect its pipeline facilities. 2. ANR, upon the request of OWNER/DEVELOPER, agrees to furnish a preliminary drawing showing its existing pipeline facilities to accommodate the plans of OWNER/DEVELOPER and/or what requirements OWNER/DEVELOPER must make in order protect ANR's existing pipelines and other facilities and appliances appurtenant thereto. 3. OWNER/DEVELOPER agrees that prior to commencement of ANR's preliminary survey and cost estimate, it will deposit with ANR a check in the amount of One Thousand and no/100 dollars ($1000.00) to cover the cost of the preliminary survey, inspection and supply cost. These services include coordinating with and monitoring the activities of the OWNER's Contractor to ensure that appropriate safety measures are in place while working around the high pressure gas transmission mains. 4. Upon completion of the work by ANR and the accumulation of the total cost and expenses, the unexpended balance, if any, shall be returned to OWNER/DEVELOPER. If the sum advanced by OWNER/DEVELOPER to ANR is insufficient to pay for the actual costs and expenses of the work, then OWNER/DEVELOPER shall pay to ANR such additional sum as necessary to s. PRELIMINARY WORK AGREEMENT Armory Area Detention Basin Page 2 complete said work, within 45 days upon being furnished by ANR with a statement of the amount over and above the estimated cost. 5. Any additions or modifications in the design of OWNER/DEVELOPER's proposed plans submitted after the date of this contract causing ANR to further alter or modify its pipeline and other facilities and appliances appurtenant thereto shall be at the expense of OWNER/DEVELOPER, its successors and assigns, and shall be performed only after a new or amended agreement is executed. IN WITNESS WHEREOF, the parties hereunder have caused this contract to be executed as of the day and year first above written. WITNESS: OWNER/DEVELOPER: City of Oshkosh __a. =S= , By: ( l Title: C 1 J 414nwA4E/2 WITNESS: ANR PIPELINE COMPANY k By: Alan Oslo's,* 6lN((,t.1 Title: Manager,Laid Msssgeuent This instrument prepared by: ANR Pipeline Company Property Rights Services W 3925 Pipeline Lane, Eden, WI 53019 Prol minsryWOrkAgremnt-Armory JER Comments 0x-(OVR8)