HomeMy WebLinkAbout160594-Building (shed). ' g
� •
� 1 1 � ' � 11 / �
�.!/ • � �
�
❑ Check this box if you are a contractor participating in the Permit Fee Account System and you would
like this permit processed through your account.
Project Address: N.� S . Circle one: Sin le Family Duplex ,
Owner's Name: '
� Gl.r1 � Daytime Phone#: qaU-3`��—�r15�
y
Contractor's Name: � I� Daytime Phone #:
If the contractor is applying for the permit provide the following:
Dwelling Contractor# Contractor Qualifier#
*These rivo credentials are required by the State of Wisconsin Safety and Buildings Division for any contractors
conducting work on residential properry.
Value of the project including labor and material costs $ �p��e�0
*The value for both materials and labor is required to ensure consistency in assessing permit fees for all applicants
even ifyou're doingyour own work. A general rule of thumb is to double the material cost orprovide an estimate
from a contractor.
Full description of the work being done:
bX� 5�. � G�. aY
��� - a�.
Electrical Work is being done by:
Any work not noted on this application will not be included on the permit!
�� m,� ��� �
Y< �
„i'.
4 h ' �
�,..
iaSD�y
...,�� �. ..�,�,., ... . '�w d, i "mY.
�.. . .!.-,S.w��kN.�k.,'�,.f`R � -�.
. . ., _ ..�.. i e... .
Please read the followin and si n and date this a lication rior to a 1 in for the buildin ermit. �
g g PP P PP Y g g P
I cert�the above information is complete and accurate. Any deviations from the above submitted
information may require additional reviews and permits to be obtained. I acknowledge and agree to these
terms.
Signature: � Date: 5— � ����
4 1/4/2013
i
k.
� ZONING/LAND USE COMPLIANCE CHECKLIST
O�HKOSH
ON THE WATER
Name WENDY JO SPANBAUER Address 1208 N EAGLE ST Create Date 5/16/2014
Construction Data � New Construction � Addition �Alteration I
Type of Construction (i.e.fence,pool,parking lot,sign,etc. New Shed
Compliance Checklist
Deficient Comments
Use
Lot Width
Lot Area
Lot Area Per Family
Flood Plain '
Front Yard
Front Yard Side Street
Rear Yard
Side Yard I
Building Area
Parking Standards
[�Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
�Height
j_I Conditions ofApproval
I Compliance with P.C. or BZA Conditions ofApprova.
Signage Standards '
I Drainage Plan-Storm Drainage-City Easements
Review Authority
As per Section 30-5 Enforcement of the City Zoning Ordinance,the Director of Community Development,or designee, must approve ail plans,
except the following: (1)Alterations or interior work when the use is conforming and when no change in use is proposed. (2)Maintenance
items,e.g.siding,windows,etc.,when the use is conforming and when no change is proposed.
`� Approved � Denied
I Plan Commission Action Required J __
Variance(s)Required � _ _
Reviewed By Jeff Nau Date 05l16/2014