HomeMy WebLinkAbout05. 14-146
APRIL 8, 2014 14-146 RESOLUTION
(CARRIED__7-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS
CONTRACT NO. 13-08 MIRON CONSTRUCTION CO. INC. FOR
THE PUBLIC WORKS FIELD OPERATIONS FACILITY ($0)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
MIRON CONSTRUCTION CO. INC.
1471 McMahon Drive
Neenah, WI 54956
No increase or decrease.
PURPOSE: See attached Change Order.
0
O1HKOf H
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: David C. Patek, Director of Public Works) c4)
DATE: April 3, 2014
RE: Approve Change Order No. 2 for Public Works Contract No. 13 -08 with Miron
Construction Co., Inc. (Miron) for the Public Works Field Operations Facility
BACKGROUND
In July of 2013, the Common Council awarded a bid to Miron for construction of the new Public
Works Field Operations Facility. In addition, Change Order No. 1 was approved in November of
2013 to allow the City to purchase the building materials for this project as a way to eliminate
the expense for the State of Wisconsin sales flax. At that time, no credit was given to the City for
the elimination of this expense.
ANALYSIS
Change Order No. 2 is required to process various changes that were required as part of the
first phase of this project. These changes were required for the following reasons:
1. To address future needs or as upgrades to current specifications
2. To address items deleted from contract
3. For changes in specifications
4. Credit for sales tax and the charge for insurance expenses
5. Provide electric for future salt storage building as part of the fuel island construction
FISCAL IMPACT
There is no change to the total contract value with the approval of this change order. The
attached page shows the expenses ($79,901.10) being totally offset by credits from sales tax
savings and by credits from the deletion of other items. The attachment also shows a credit
balance of $43,056.39 remaining for this project.
RECOMMENDATIONS
I recommend approval of the proposed change order with Miron.
Approved,
Mark A. Rohloff
City Manager
DCP /tlt
Attachment
1: Engineering113 -06 PW Field Ops FaclProject_ InformalionlCorrespondencelMemo 113 -08 Memo for CO #2_4- 3- 14.dacx
City of Oshkosh Public Works Facility Change Order Log - April 1, 2014
Cttu. �r ���Atpc� turns for, future needa, Inerease'in..a.ual�ty Add Credit
Install conduits for future use to fiber) hone. $448.00
Install (2) 4" conduits and (2) 2" conduits from the future CNG station to the
fuel island center islands. $3,951.00
Moving sink from laundry Room #119 to Support Room #120. $411.00
Increase overhead doors to 18' from 16'- two openings. $954.00
Change flooring in RM 101 to polished concrete in lieu of carpet. $335.00
Change flooring in shower area from polished concrete to epoxy. $881.00
Revisions to site elec., storm water & fencing , office area,.vehicle parking,
weld bay and small engines. $5,405.00
Provide concrete stain in rooms, 101 -106, 109 -110 & 112. $4,418.00
Update the new fuel control system from 60 Smartcards to 500 specialized
kevs. 1 $2,783.00
qty requested. items ilo be dale #ed nvt,requreci
Add Credit
Deleting 149' of 6" sanitary pipe and sanitary manhole #1 RFl #5 $4,569.25
Credit to delete six hand dryers, circuits and conduits. $2,741.00
Credit for deleting video screen in the Lunch I Training Room. $1,089.00
Delete the floor drain in the welding bay base. $276.00
Credit for countertop icemaker & associated piping /wiring in vending 113. $2,605.00
Chance iFn:.nreiect snecs Add Credit
Cost savinq for using 12 SS Super Saver Model Light fixtures at fuel island. $319.70
Add Drip an and Condensate liner to inside condensing units. $1,443.00
Provide (22) Circuit breakers at 35 KVA in panel PP1 and PP4 per
coordination study once upon selection of emergency enerator. $3,208.00
Provide card access at each gate - in lieu of fuel master units. $496.00
Add Credit
Savings for elimination of state sales tax. $110,861.54
Request for contractor to provide owners & contractors protective liability for
the City of Oshkosh. $17,161.10
Items required for phase 1 that were in phase'2 (2015} Add Credit
Furnish electrical panels for vehicle fueling station - Use for future salt
storage structure. $38,503.00
Add Credit
Sub totals $79,901.10 $122,957-49
Credit/Allowance to Remain in Miron Contract $43,056.39
Document G701"'-2001
.Change Order
PROJECT (Name and address):
CHANGE ORDER NUMBER: 002
OWNER: ❑
CITY OF OSHKOSH
DATE: 4/3/2014
ARCHITECT:
639 WITZEL AVENUE
'OSHKOSH, WI 54902
CONTRACTOR: ❑
TO CONTRACTOR (Name and address):
ARCHITECT'S PROJECT NUMBER:
FIELD: ❑
MIRON CONSTRUCTION
CONTRACT DATE: July 17'' 2013
OTHER: ❑
1471 MCMAHON DRM
CONTRACT FOR: General Construction
NEENAH, WI 54956
-THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)
The.original Contract Sum was $ 14,052,771.00
`.The n6 change by previously authorized Change Orders $ - 2,826,054.61
The Contract Sum prior to this Change Order was $ 11,226,716.39
The Contract Sum will be unchanged by this Change Order in the amount of $ 0.00
Thenew Contract Sure including this Change Order will be $ 11,226,716.39
The Contract Time will be increased by Zero (0) days.
The hate of Substantial Completion as of the date of this Change Order therefore is
'.NOTE; This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have
been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction. Change Directive.
NOT VALID UNTIL SIGNED BY THE .ARCHITECT, CONTRACTOR AND OWNER.
KUENY ARCHITECTS, LLC MIRON CONSTRUCTION CITY OF OSHKOSH DPW
ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name)
10505 C RATE.DRIVE, STE 100 1471 McMAHON DRIVE 215 CHURCH AVENUE
PLE49ANT RAaM, WI 53158 NEENAH, WI54956 OSHKOSH W1549034130
ADD. SS ADDRESS ADDRESS
P ALLENKAMP
name)
4/3/2014
DATE
BY (Signature)
(Typed name)
DATE
BY (Signature)
(Typed name)
DATE
AEA Document G701 Tm — 2001. Copyright m 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA®
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any ,E
portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was
produced by AIA software at 09:06:53 on 04103/2014 under Order No. 9396656249_1 which expires on 12/1212014, and is not for resale.
User Notes: (1885521299)