HomeMy WebLinkAbout13-18 Lunda Construction/Boatworks/Riverwalk 2014 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) Second Partial Award THIS AGREEMENT is by and between City of Oshkosh ("Owner") and Lunda Construction Company ("Contractor"). Owner and Contractor hereby agree as follows: ARTICLE 1 —WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: City Contract 13-18: Boat Works Property Riverwalk, 2nd Partial Award ARTICLE 2 —THE PROJECT 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: City Contract 13-18, RES No., 14-06: Boat Works Property Riverwalk Partial Award Item B1 Bridge Spans, $1,073,264.00 ADD 2nd Partial Award (Resolution No. 14-79) Item B3 Elevated Bridge Approach/West $326,166.00 Item Alt. 1 Demolition of Former Marina Structures $164,688.00 Item Alt. 5 Coconut COIR Logs & Riprap $ 57,000.00 Total Addition $547,854.00 TOTAL REVISED CONTRACT $1,621,118.00 ARTICLE 3 — ENGINEER 3.01 The Project has been designed by AECOM (Engineer), which is to act as Owner's representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents. ARTICLE 4—CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. E.ICDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright c%2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page I of 8 4.02 Dales for Substantial Completion and Final Payment A. The Work will be substantially completed on or before October 1, 2015, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before January 1, 2016. 4.02 Liquidated Damages A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration preceding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay(but not as a penalty), Contractor shall pay Owner per 2013 Standard Specifications for City of Oshkosh, Wisconsin Section 100.45 for each day that expires after the time specified in Paragraph 4.02 above for Substantial Completion until the Work is substantially complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner per 2013 Standard Specifications for City of Oshkosh, Wisconsin Section 100.45 for each day that expires after the time specified in Paragraph 4.02 above for completion and readiness for final payment until the Work is completed and ready for final payment. ARTICLE 5—CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to Paragraphs 5.01.A, 5.01.B, and 5.01.0 below: A. Bid Item B1, Bridge Spans, Lump Bid Sum, a sum of: $1,073,264.00 (Original Contract) B. Bid item B3 Elevated Bridge Approach/West, Lump Bid Sum, a sum of: $326,166.00 C. Bid Item Alt. 1, Demolition of Former Marina Structures, Lump Bid Sum, a sum of $164,688.00 D. Bid Item AIt.5, Coconut COIR Logs& Riprap, Unit Rate, a Sum of: $57,000 The Bid prices for Lump Sum/Unit Price Work set forth as of the Effective Date of the Agreement are based on bid set project plans and specifications. E. For all Work, at the prices stated in Contractor's Bid, attached hereto as an exhibit. EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright(c_`)2007 National Society of Professional Engineers for E.JCDC.All rights reserved. Page 2 of 8 ARTICLE 6— PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.02 Progress Payments; Retainage A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment approximately every four weeks based on the schedule provided at the Preconstruction Conference during performance of the Work as provided in Paragraph 6.02.A.I below. All such payments will be measured by the schedule of values established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, 100.45, 2013 City Standard Specifications, in accordance with Paragraph 14.02 of the General Conditions. a. 95 percent of Work completed (with the balance being retainage). If the Work has been 50 percent completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to Owner and Engineer, then as long as the character and progress of the Work remain satisfactory to Owner and Engineer, there will be no additional retainage; and B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 95 percent of the Work completed, less such amounts as Engineer shall determine in accordance with Paragraph 14.02.B.5 of the General Conditions and less 10 percent of Engineer's estimate of the value of Work to be completed or corrected as shown on the tentative list of items to be completed or corrected attached to the certificate of Substantial Completion. 6.03 Final Payment A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07. ARTICLE 7— INTEREST 7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall bear interest at the rate 1% per month. F..ICDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright,c:2007 National Society of Professional Engineers for EJCUC.All rights reserved. Page 3 of 8 ARTICLE 8— CONTRACTOR'S REPRESENTATIONS 8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work. D. Contractor has carefully studied all: (I) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities), if any, that have been identified in Paragraph SC-4.02 of the Supplementary Conditions as containing reliable "technical data," and (2) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in Paragraph SC-4.06 of the Supplementary Conditions as containing reliable "technical data." E. Contractor has considered the information known to Contractor; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Site-related reports and drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Contract Documents; and (3) Contractor's safety precautions and programs. F. Based on the information and observations referred to in Paragraph 8.01.E above, Contractor does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract'Times, and in accordance with the other terms and conditions of the Contract Documents. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright(c,2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 4 of 8 ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents A. The Contract Documents consist of the following: 1. This Agreement(pages 1 to 8, inclusive). 2. Performance bond (pages 610-1 to 610- 3, inclusive). 3. Payment bond (pages 615-1 to 615-3, inclusive). 4. Certificate of Insurance (Contractors Insurance with Property Insurance Requirements listing AECOM as additional insured). 5. General Conditions(pages 700-I to 700-63, inclusive). 6. Supplementary Conditions (pages 800-1, and 810-1 to 810-14, inclusive). 7. Specifications as listed in the table of contents of the Project Manual. 8. Drawings consisting of 64 sheets with each sheet bearing the following general title: River Walk Expansion, Boat Works Property Segment, Issued for Bid dated 9/05/13. 9. Addenda(numbers 1 to 3, inclusive). 10. Exhibits to this Agreement(enumerated as follows): a. Contractor's Bid (pages 1 to 9, inclusive). b. Notice of Award (pates 520-1). 11. The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto: a. Notice to Proceed b. Work Change Directives. c. Change Orders. The Contract documents are complementary; what is required by one is as binding if required by all. In the event that any provision in any of the above component parts of this contract conflicts with any provision in any other of the component parts, the provision in the component part first enumerated above shall govern over any other component part with follows it numerically except as may be otherwise specifically stated. FJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright-2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 5 of 8 A. There are no Contract Documents other than those listed above in this Article 9. 13. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the General Conditions. ARTICLE 10— MISCELLANEOUS 10.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 1 0.02 Assignment of Contract A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be hound: and. specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 10.03 Successors and Assigns A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 10.04 Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. 10.05 Contractor's Certifications A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 10.05: 1. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process or in the Contract execution: EJCDC('-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright«)2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 6 of 8 2. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non-competitive levels, or(c) to deprive Owner of the benefits of free and open competition; 3. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and 4. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 10.06 None FJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright c 2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 7 of S IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. Counterparts have been delivered to Owner and Contractor. All portions of the Contract Documents have been signed or have been identified by Owner and Contractor or on their behalf. This Agreement will be effective on March 10, 2014 (which is the Effective Date of the Agreement). OWNER: [ CONTRACTOR: oSFl KOS h Lunda Construction nstructiBy .-- 13b'44 itiao bit ) 1 Title: Division Manager bit a �t Inc r 3 , 6. C�r k (If Contractor is a corporation, a partnership, or a joint venture, attach evidence of authority C`,+) of Qs11(caS 6tk-(orthe 4 rdD to sign. Attest: /i4sLawri Attest: ti- ,,s E rt, r�; r G'(a r 1< Administrative Assistan �.� Title: Address for giving notices: Address for giving notices: /S ('I\ut Oil Ave 2000 Taylor Street f<\Ktj�h L,03-- J 6HO1 PO Box 228 Little Chute, WI 54140-0228 License No.: 1106358 (Where applicable) (If Owner is a corporation, attach evidence NOTE TO USER: Use in those states or other of authority to sign. If Owner is a public body, Jurisdictions where applicable or required. attach evidence of authority to sign and resolution Agent for service of process: or other documents authorizing execution of this Agreement.) APPROVED I hereby certity that tile necessary provisions have been made to pay the iiability which will f►L�I. _� accrue under this contract. CITY AT_OP72"1"" HKOSH,WISCONSIN Y� 1 I( a0�� `CI • Pta-i -x/k . City omptroller EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) Copyright!( 2007 National Society of Professional Engineers for EJCDC.All rights reserved. Page 8 of 8 LUNDA CONSTRUCTION COMPANY BOARD OF DIRECTORS RESOLUTION: Authority to bind contracts: Power of Attorney DATE: July 23, 2004 Wherein, the.Board of Directors held a Special Meeting to discuss the authority to bind the company to contracts. Wherefore, a discussion was held regarding the necessity of granting authority to several management employees of the company to bind the company to contracts and be authorized to sign company documents. RESOLVED: Unanimous decision of the Board of Directors hereby grants authority to and empowers any one of the following employees to sign for and on behalf of Lunda Construction Company, documents such as bid bonds, proposals for bidding, and awarded contracts. Director: Larry Lunda, President Director: Carl W. Holmquist, Secretary/Treasurer Director: Richard S. Slifka Director Tom R. Braun Director Joseph A. Quist Dennis L. Behnke Christian Fox Michael D. Hanson Daniel R Oudenhoven Richard E. Rust Director, Larry Lunda AFFIX CORPORATE SEAL HERE Director, Carl . Holmquist e• or, Ric ' S. Slifka -ct•r, Tom Braun Di ector, Jo Quist L . LIZ Director, D nnis elflike D • , Thomas E. Lister • Bond No. 106041927 RIDER To be attached to and form a part of Performance and Payment Bond, No. 106041927 dated the 24th day of January ,2014 issued by Travelers Casualty and Surety Company of America as Surety, on behalf of Lunda Construction Company ,as Principal, in the penal sum of One Million Seventy Three Thousand Two Hundred Sixty Four and 00/100 Dollars($ 1,073,264.00 ),and in favor of City of Oshkosh,WI In consideration of the premium charged for the attached bond,it is hereby agreed that the attached bond be amended as follows: Bond Amount Increased an additional$547,854.00 Total New Bond Value:$1,621,118.00 Provided,However,that the attached bond shall be subject to all its agreements,limitations and conditions except as herein expressly modified,and further that the liability of the Surety under the attached bond and the attached bond as amended by this rider shall not be cumulative. This rider shall become effective as of the_10th day of March 2014 Signed,sealed and dated this 10th day of March 2014 Lunda Construction Company ATTEST: B f n (`..,A PRINCIPAL Daniel R Oudenhoven Division Manager Travelers Casualty and Surety Company of America By - J n M.Feeney ,Attorney-in-Fact WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER ,Ak POWER OF ATTORNEY TRAVELERSJ Farmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company Attorney-In Fact No. 226979 Certificate No. 0 0 5 5 8 17 1.4 KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa,and that Fidelity and Guaranty Insurance Underwriters,Inc.,is a corporation duly organized under the laws of the State of Wisconsin(herein collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint Michael J.Cusack,John J.Gambino,Nicole Roy,Natalie Coneys,Donald H.McCarter,Sandra C.Lopes,Jean M.Feeney,and Nicholas Labbe of the City of Boston ,State of Massachusetts ,their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above,to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF,the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed,this 31st day of July 2013 Farmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company G/SUA,+ E � . W/ RPE , b Fa�a g3 ,1 5UD w'rvE te-- G� N c o y% ocP° r 1 i° N "mix �4 �LOSPORA t-m I O m ATp s ^WCd�RAtED � Acm c�i ;zt CO n€ a HARTFORD ^^ I t u 1982 0 z f y 1951 SEAL CONN• > \- v 1 i '4)7 Aw�� n j i State of Connecticut By: City of Hartford ss. Robert L.Raney, enior Vice President 31 On this the st day of July 2013 ,before me personally appeared Robert L.Raney,who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc.,St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,and that he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IONIn Witness Whereof,I hereunto set my hand and official seal. "TAA C V st My Commission expires the 30th day of June,2016. * 00Blto * Marie C.Tetreault_Notary Public c;ft elf, 58440-8-12 Printed in U.S.A. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER • LUNDA CONSTRUCTION COMPANY BOARD OF DIRECTORS RESOLUTION: Authority to bind contracts: Power of Attorney DATE: July 23, 2004 Wherein, the.Board of Directors held a Special Meeting to discuss the authority to bind the company to contracts. Wherefore, a discussion was held regarding the necessity of granting authority to several management employees of the company to bind the company to contracts and be authorized to sign company documents. RESOLVED: Unanimous decision of the Board of Directors hereby grants authority to and empowers any one of the following employees to sign for and on behalf of Lunda Construction Company, documents such as bid bonds, proposals for bidding, and awarded contracts. Director: Larry. Lunda, President Director: Carl W. Holmquist, Secretary/Treasurer Director: Richard S. Slifka Director Tom R. Braun Director Joseph A. Quist Dennis L. Behnke Christian Fox Michael D. Hanson Daniel R. Oudenhoven Richard E. Rust Director, Larry Lunda AFFIX CORPORATE SEAL HERE Director, Carl . Holmquist I• e• or, Ric S. Slifka i. ct:r, Tom Braun fir Di ector, Jo Quist • L . *KA Director, D-s nnis ;ehnke D • , Thomas E. Lister