Loading...
HomeMy WebLinkAbout0159768-Building (demo) � CITY OF OSHKOSH No �s9�ss OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 500 S OAKWOOD RD Create Date 03/07/2014 Project Demolition _ _ Project Number 20140764 Owner MERCY MEDICAL CENTER OSH INC Plan Contractor BOLDT OSCAR CONSTRUCTION Inspector Nicole Krahn Designer : Category 220-Alteration Hospitals&Institutions Type of Plan Zoning C-1 PD Square Footage Major Occ Const Class Fire Protection � Sprinkled � Unsprinkled � Sprinkler Design Occupancy Permit Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 � Projection i, Canopies Signs Use/Nature of Work COMM/MERCY HOSPITAL/Demolition work only in preparation for the 3rd floor remodeling project. , � ; HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $22,000.00 Plan Approval $0.00 Permit Fee Paid $167.00 Park Dedication $0.00 Issued By: (\ j�/� Date 03/14/2014 Final/O.P. 00/00/0000 �`r � Permit Voided Parcel Id#0613660000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Signature Date AgenUOwner Address PO BOX 419 APPLETON WI 54912 - 0000 Telephone Number 739-6321 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.