HomeMy WebLinkAbout0159859-Electric � CITY OF OSHKOSH No 159859
OSHKOSH ELECTRIC PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1632 PELTON PKWY Owner EAA Create Date 03/17/2014
Contractor FAITH TECHNOLOGIES, INC. Category 643-Commercial-Addition/Remodels Plan
Inspector Adam Krause
Service New 0 Change 0 Temp � N/A Type � Overhead � Underground I
Volts Circuits Luminaires 18
Amps 100 Switches 7 Receptacles 11
Appliances Baseboard Heaters,Water Heater
i
! I
�
-------- -
:
Use/Nature of OMM/EAA STAFF LODGE/Addition to the lodge to create 4 additional bedroom suites to the existing lodge "check#1002793
Work
�
I
� -------
Fees: Valuation $14,200.00 Plan Approval $0.00 Permit Fee Paid $253.00
Issued By: ����(� Date 03/21/2014
�� .
❑ Permit Voided I Parcel Id#
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
Signature Date
AgenUOwner
Address PO BOX 260 _MENASHA WI 54952 -260 Telephone Number (920)738-1513
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
City of Oshkosh
Division of Inspection Services �
P.O.Box 1130 �
Oshkosh,W154903-1130
Phone(920)236-5050
. Fax (920)236-5084
crnr H tivn
r
� ELECTRICAL PERMIT APPLICATION
All information after bold categories must be provided.
' Incomplete applications will not be processed.
• Application(s)and fee(s)can be brought to City Hall,Room 205 or mailed to Inspection Services,PO Box 1128,
Oshkosh WI 54903-1128. Commencing work without permit(s)will result in fees being doubled or$100.00 plus the
normal permit fee,which ever is greater. ;
OR
�vaa aae cr coxtractar�,cirtic�alinb in the Yermi� l"ec Accarrnt Svsxem uri�t h�we «dec�ate h�nds check here
�vou want this processed through your accoun� ❑
�-I 3v� � ��I�� P�'l�l�� DATE � � � 1
JOB ADDRESS - I���
�.n_�
OWNER ��� MAR 21 2014
CONTRACTUR + J_ � � �- �
��r,��zr;t�:::�;� �r
�0�1\fUi7T'i%E:E:;:E��P�fEVT
CHECK E(ALL APPLICABLE INSPE�^Ti(��;�r�:;��a�.eF at�•iS�O,�
USE CATEGORY �
�Single Family ❑Duplex ❑Multi-Family ORental C�'Commercial ❑Industrial
SERVICE ONew ❑Temporary TYPE OOverhead ❑Not Applicable
�Change ❑Not Applicable OUnderground
� FILL IN THE APPROPRIATE BLANK WITH THE NUMBER
Volts / Receptacles# �� Circuits#
Phase
Amps__��,,,_ Switches# �_ Fixtures#��_ :
CHECK 0 ALL APPLICABLE
❑Range ❑Dishwasher OGarbage Disposal ❑Dryer C�'Water Heater
❑Fan OR Blower ❑Furnace [� C ❑Electric S'g j
❑Motors ❑Gas Pumps �ther �G-�.e:��-c.�'�`�,�,,�Z-
DESCRIPTION OF ALL WORK BEING DONE
C,, r
G� oa�
VALUE(Including labor and all materials including light tixtures)� �}�
MASTER ELECTRICIAN
3/02
.
EAA Staff Lodge Addition—Electrical Scope of Work
1. Distribution
a. [1] 100 amp loadcenter with necessary branch breakers.
i. Loadcenter would be feed from existing service paneL
ii. Loadcenter would be located in Mech. 106
2. Living Units 101-104[typical of four,each to include the following]
a. [1]twin arm CFL between beds
b. [1]surface ceiling entry light CFL
c. [1] 2'strip lights mounted in soffit with paracube lens dropped in frame provided by others @
bathroom sink.
d. [1)vanity light @ desk, in living area
e. [1J surface ceiling CFL near shower stall
f. [1]connection to ceiling exhaust fan [furnished and installed by others]
g. [4] wall switches
h. [6J duplex outlets
i. [2]GFI duplex outlets
j. [3] box and conduit rough-ins for fire alarm devices
3. Living Units 101& 102,outside wall bathrooms[typical of two,each to include the following]
a. [1] 1000w baseboard heater with integral thermostat [furnished by others]
4.Corridor 105
a. [4J 2x4 lay-in acrylic troffer with [2]T-8 lamps
b. [2]3-way switches
c. [2] LED exit fixtures
d. [1] emergency battery unit with twin heads
e. [i]duplex outlet
f. [1]fire alarm wall rough-in at new fire door
g. [1] north door contact rough-in
h. [1]4KW wall heater connection @ new north door[furnished by others]
5. Mechanical 106
a. [1]4'fluorescent strip light
b. [lJ wall switch
c. [1]duplex outlet
d. [i]3 ton air conditioner connection
e. [1]fumace connection
f. [1]gas water heater 120 volt connection for electronic controls
6.Storage 107
a. [2J 2x4 lay-in acrylic troffer with [2]T-8 lamps
b. [i]wall occupancy sensor switch
7. Exterior
a. Relocate wall light from original outside wall to new north outside wall
b. [iJ egress light
c. [1] GFI duplex weatherproof outlet at north exit door
3/18/2014