Loading...
HomeMy WebLinkAboutReinke, Hansche, Last, Inc/CHG OR/Oshkosh Centre Project architects REINKE • HANSCHE • LAST • INC • tY-VAVRA ARCHITECTS ENGINEERS INC 805 NORTH MAIN STREET • OSHKOSH, WISCONSIN 54901 • TELEPHONE 414 231-6950 September 12, 1983 Mr. William Frueh City of Oshkosh 215 Church Street Oshkosh, WI 54901 RE: OSHKOSH CENTRE PROJECT NO. 1383 Dear Mr. Frueh: We are forwarding this request for a change in our architectural contract for the Oshkosh Centre project. The requested change is to add $4,000.00 to the contract fee of $140,000.00. This request for additional fees is itemized as follows: 1. When the original fee was proposed, the Centre building by Code did not require an automatic fire protection system (sprinkler system) . If the construction of this project had commenced prior to July 1, 1983, the fire protection system would not be required. In accordance with State Building Codes as amended on July 1, 1983, this building now has to have a sprinkler system. We, therefore, are requesting an additional engineering fee of $2,000.00 to prepare the required documents, bid and administer the contract for this service. 2. Our original proposal to the City of Oshkosh for this project included a limited sound system. In reviewing the project in the contract document phase with Ron Burich, we find that television capabilities for standard, cable and satellite will be required. Also, requests are being made to provide capabilities for live TV broadcasts from the Centre. The electrical, sound and television engineering required to provide these additional requests are extensive. We are, therefore, requesting an addition to our contract of $2,000.00 to provide for these services. Mr. William Frueh September 12, 1983 Page 2 After you have reviewed this request for an additional $4,000.00 to our contract, it would be appreciated if this letter of accep- tance could be signed and returned to our office. A copy of this letter is enclosed for your files. If you or the Committee have questions about these requested changes in our contract, please feel free to call. V, ry fly yours, ONALD D. HANSCHE ACCEPTED: CITY OF OSHKOSH By ! Warren D. Ren.ndo, Asst. City Manager Ie• Harold Ka gu , i,p.City Clerk RDH/dcb Enc. cc: Paul Klumb her^hy cErt',',, .;Y_.fgsary Provisions hav,' n :;:,_ ii� i.y wnich will aCCRie 7 ? City Comptroller