HomeMy WebLinkAboutReinke, Hansche, Last, Inc/CHG OR/Oshkosh Centre Project architects
REINKE • HANSCHE • LAST • INC • tY-VAVRA ARCHITECTS ENGINEERS INC
805 NORTH MAIN STREET • OSHKOSH, WISCONSIN 54901 • TELEPHONE 414 231-6950
September 12, 1983
Mr. William Frueh
City of Oshkosh
215 Church Street
Oshkosh, WI 54901
RE: OSHKOSH CENTRE PROJECT
NO. 1383
Dear Mr. Frueh:
We are forwarding this request for a change in our architectural
contract for the Oshkosh Centre project. The requested change is
to add $4,000.00 to the contract fee of $140,000.00.
This request for additional fees is itemized as follows:
1. When the original fee was proposed, the Centre building
by Code did not require an automatic fire protection
system (sprinkler system) . If the construction of this
project had commenced prior to July 1, 1983, the fire
protection system would not be required. In accordance
with State Building Codes as amended on July 1, 1983,
this building now has to have a sprinkler system. We,
therefore, are requesting an additional engineering fee
of $2,000.00 to prepare the required documents, bid and
administer the contract for this service.
2. Our original proposal to the City of Oshkosh for this
project included a limited sound system. In reviewing
the project in the contract document phase with Ron Burich,
we find that television capabilities for standard, cable
and satellite will be required. Also, requests are being
made to provide capabilities for live TV broadcasts from
the Centre.
The electrical, sound and television engineering required
to provide these additional requests are extensive. We
are, therefore, requesting an addition to our contract of
$2,000.00 to provide for these services.
Mr. William Frueh
September 12, 1983
Page 2
After you have reviewed this request for an additional $4,000.00
to our contract, it would be appreciated if this letter of accep-
tance could be signed and returned to our office. A copy of this
letter is enclosed for your files.
If you or the Committee have questions about these requested changes
in our contract, please feel free to call.
V, ry fly yours,
ONALD D. HANSCHE
ACCEPTED:
CITY OF OSHKOSH
By !
Warren D. Ren.ndo, Asst. City Manager
Ie•
Harold Ka gu , i,p.City Clerk
RDH/dcb
Enc.
cc: Paul Klumb
her^hy cErt',',, .;Y_.fgsary Provisions
hav,' n :;:,_ ii� i.y wnich will
aCCRie
7 ?
City Comptroller