TO: FOUR-WAY CONST. OF WI INC. DATED: July 28, 1983
P.O. Box 133
Berlin, WI 54923
Your present contract with the City of Oshkosh, Contract No. 82-17
is hereby amended and changed as follows:
( insert here work and/or materials to be added or eliminated and
the unit and/or lump sum price to be added to or deducted from the
contract. )
ADD - TO RELAY STORM SEWER ON CONGRESS AVE.WHICH COLLAPSED DURING PAVING GRADING:
220 lin.ft. double 21" RCP @ $40.00= $ 8,800.00
402 lin.ft. 21" RCP @ $25.00= $10,050.00
Const.2 box MHs,structures only @ $700.00= $ 1,400.00
Const. 2 std. MHs, structures only @ $350.00= $ 700.00
TOTAL ADDED BY CHANGE ORDER = $20,950.00
Recoi n - ad ed : ; C TY OF OS 'OSH
1
Director of • J is Works City Manager
t 60742(
City Clerk
Appr. -d a —cc-pted:
mot
,
Co jac /:r doe
I certify that provision has been made to pay the liability that
will accrue to the City of Oshkosh, Wisconsin, under the within
Change Order.
' '/ ' �� ?�� ^ 4--G) /L ;,
1 Comptrolleyr
Approved ,.s. to orm
J a
7/ .� ./
/Gib, City Attorney