Loading...
HomeMy WebLinkAboutPW CNT 82-17/CHG OR #2/Four-Way Construction of WI Inc CHANGE ORDER NO. 2 TO: FOUR-WAY CONST. OF WI INC. DATED: July 28, 1983 P.O. Box 133 Berlin, WI 54923 Your present contract with the City of Oshkosh, Contract No. 82-17 is hereby amended and changed as follows: ( insert here work and/or materials to be added or eliminated and the unit and/or lump sum price to be added to or deducted from the contract. ) ADD - TO RELAY STORM SEWER ON CONGRESS AVE.WHICH COLLAPSED DURING PAVING GRADING: 220 lin.ft. double 21" RCP @ $40.00= $ 8,800.00 402 lin.ft. 21" RCP @ $25.00= $10,050.00 Const.2 box MHs,structures only @ $700.00= $ 1,400.00 Const. 2 std. MHs, structures only @ $350.00= $ 700.00 TOTAL ADDED BY CHANGE ORDER = $20,950.00 Recoi n - ad ed : ; C TY OF OS 'OSH 1 Director of • J is Works City Manager t 60742( City Clerk Appr. -d a —cc-pted: mot , Co jac /:r doe I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ' '/ ' �� ?�� ^ 4--G) /L ;, 1 Comptrolleyr Approved ,.s. to orm J a 7/ .� ./ /Gib, City Attorney