FEBRUARY 25, 2014 14-79 RESOLUTION
(CARRIED__6-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: AWARD PARTIAL BID TO LUNDA CONSTRUCTION, CONTRACT
NO. 13-18 BOATWORKS RIVERWALK – EAST SECTION
($547,854.00)
INITIATED BY: COMMUNITY DEVELOPMENT
WHEREAS, the City of Oshkosh has heretofore advertised for bids for
construction of a bike/pedestrian riverwalk with bridges along the south side of the Fox
River, at the end of Michigan Street, on property referred to as the Boat Works property;
and
WHEREAS, the City previously awarded a partial bid to Lunda Construction to
permit ordering the bridges for said riverwalk project which require several months for
fabrication; and
WHEREAS, the City desires to award another phase of the riverwalk project on
the east side of Michigan Street, to include bridge approach and related work,
demolition of the former marina related structures and docks/piers and restoration of the
shoreline; and
WHEREAS, it appears that the following partial bid for bridge approach and
related work, demolition of the former marina related structures and docks/piers and
restoration of the shoreline is the most advantageous bid:
Lunda Construction
2000 Taylor Street
Little Chute, WI 54140
TOTAL BID ITEMS B3, Alt. 1 & Alt. 5: $547,854.00
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that said partial bid for bridge approach and related work, and demolition of
the former marina related structures and docks/piers and restoration of the shoreline is
hereby accepted and the proper City officials are hereby authorized and directed to
enter into an appropriate agreement for the purpose of same, all according to plans,
specifications, and bid on file. Money for this purpose is hereby appropriated from:
Acct. No. 534-1040-7216-00000 TID #20 Fund – Boatworks / Riverwalk
OfHKOIH
ON THE WATER
TO: Honorable Mayor and Members of the Common Council
FROM: Allen Davis
Community Development Director
DATE: February 20, 2014
RE: Award Partial Bid to Lunda Construction Contract 13-18 for Boatworks
riverwalk east section $547,854
BACKGROUND
The City has designed and bid out the Boatworks portion of the south shore riverwalk. The
bid split the project into multiple pieces; the first piece of the base bid for the project includes
the bridges required to span the riverfront at the mouth of the old marina. The other elements
of the bid include the east-side ramp, shoreline protection, site demolition and clean up. The
City Council awarded the bridge fabrication in January due to the 4 to 6 months required to
fabricate the bridge. Staff is recommending award of the work on the east section of the
Boatworks since this work can begin now and not interfere with the west section of the
Boatworks.
The City Council, the RDA and the Parks Board reviewed other possible public improvements
in the west section of the Boatworks area due to changes in the available grants for additional
projects in additional locations. WisDNR had informed the City that a new $363,000 grant
could be used for the west-side Boatworks area public improvements, but not on the bridge.
City staff has sent the information for the west part of the project to WisDNR for their final
approval for the additional $363,000. None of the project costs on the west side of the
Boatworks has been awarded or will be awarded until WisDNR has provided final approval
for the project. This partial bid award is only for the east side of the Boatworks property.
ANALYSIS
The City has already obtained a $592,000 grant for the bridge/riverwalk project. The City has
also obtained permits from the WisDNR, the Army Corps of Engineers and the Coast Guard.
The riverwalk extension will begin at the end of the Steiger Park section which is located at
the base of the public fishing pier. The project will include the following elements:
• West-end ramp that circles once to achieve the height required for the bridge.
• A bridge span from the shoreline to the Boatworks island.
• An observation platform.
• A second bridge span from the island to the east shore of the Boatworks property
• An east end ramp.
• Use of one of the 1899 Railroad Bridge portals.
• Shoreline protection.
• Final demolition and clean up of Boatworks structures on the property.
Only the bid for the bridge and the east side of the property can be let at this time due to the
uncertainty of the use of the new $363,000 grant. Any project award prior to a grant contract
for the $363,000 would be ineligible for the WisDNR grant. The uses of the $363,000 include
the construction of the west end ramp, a restroom/shelter, a parking lot, a canoe/kayak
launch, a trail or sidewalk connection to 4th Ave, and/or a playground. The bids for the
additional west side elements of the Boatworks project will likely be awarded later this spring.
As the attached bid tabulation indicates, Lunda is also the lowest bidder for the other project
elements.
RECOMMENDATION
The City Council makes a partial bid award to Lunda Construction for the east section of the
Boatworks for $547,854.
FISCAL IMPACT
Total funding for the project includes $900,000 from savings accrued from the Steiger Park
riverwalk, $592,000 in existing grant funds and City's 2014 CIP budgeted $600,000. The
City's CIP funding would be paid by TID #20 increment and/or a donation by TID #7.
Approved,
City Manager
CITY OF OSHKOSH
CONTRACT 13-18 BOAT WORKS RIVERWALK
BIDS OPENED: OCTOBER 8, 2013
10:30 AM
NAME OF McMullen&Pitz Constructior Janke General Contractors Lunda Construction Radtke Contractors
BIDDER 17 Maritime Drive 1223 River View Lane 2000 Taylor Street 6408 Cross Road
Manitowoc,WI 54221 Athens,WI 54411 Little Chute,WI 54140 Winneconne,WI 54986
Item B1
Bridge Spans(2);viewing platform;
power center, conduit,wiring,
communication pull boxes,
electrical pull boxes, luminaries& 1,550,000.00 1,610,000.00 1,073,264.00 1,416,364.36
bollards. Includes island demolition,
mobilization/demobilization
Item B2
Elevated Bridge Approach/West
side; support foundations, conduit,
communication pull boxes, 341,000.00 435,000.00 300,741.00 310,378.95
electrical pull boxes, luminaries&
bollards; mob/demob
Item B3
Elevated Bridge Approach/East
side; support foundations, conduit,
communication pull boxes, 330,000.00 385,000.00 'x 326,166.00 339,535.30
electrical pull boxes, luminaries&
bollards; mod/demob
Item B4
Concrete Riverwalk; relocate
communication vault&electrical
pull box; install communication pull 169,000.00 136,000.00 91,314.00 54,332.60
boxes, electrical pull boxes;
luminaries&bollards; mob/demob
TOTAL BASE BID 2,390,000.00 2,566,000.00 1,791,485.00 2,120,611.21
Alt. 1
Demolition of former marina
seawall, docks, lift&boat house 127,750.00 215,000.00 x 164,688.00 35,000.00
Alt.2
Excavate addt'l 10 inches for 14 ft.
width. Dispose of excavated soils at
Valley Trail Landfill. Quantify paid 39,750.00, 105,000.00 16,590.00 38,400.00
by landfill scale measurements at
time of disposal.Tipping fees bills
directly to City
Alt.3
Place&compact 1 1/4 in. dense 13,500.00 21,450.00 11,910.00 8,910.00
aggregate base from City stockpile
Alt.4
Place SAS geotextile fabric at base 1,100.00 500.00 362.00 676.00
of pathway excavation
Alt.5
-
Coconut COIR log&riprap 120,000.00 51,600.00 x 57,000.00 71,352.00
Alt. 6
Riprap Type II 150,000.00 120,000.00 79,800.00 89,250.00
TOTAL
ALTERNATE BID ITEMS 452,100.00 513,550.00 330,350.00 243,588.00
BID BOND/CERTIFIED CHECK BB BB BB BB
ADDENDA
1, 2&3 Yes Yes Yes Yes