Loading...
HomeMy WebLinkAbout08. 14-70 FEBRUARY 25, 2014 14-70 RESOLUTION (CARRIED__6-0______LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVAL OF ENGINEERING SERVICES AGREEMENT WITH AECOM TECHNICAL SERVICES, INC. FOR CONSTRUCTION- RELATED SERVICES FOR THE NATIONAL GUARD ARMORY AREA STORMWATER DETENTION BASIN IN THE AMOUNT OF $336,413.00 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with AECOM Technical Services for construction oversight, testing, and documentation, review of as-built construction drawings, and services related to any civil or geotechnical engineering issues which may arise in the construction of the Armory Area Detention Basin in the amount of three hundred thirty-six thousand four hundred thirteen dollars ($336,413). Acct. No. 561-2010-1799-00000 Storm Water Utility Construction Work in Progress 4.111) OJHKOJH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works 505 DATE: February 20, 2014 RE: Engineering Services Agreement for Construction-Related Services for Construction of Armory Area Detention Basin/AECOM Technical Services, Inc. (AECOM) ($336,413) BACKGROUND The Department of Public Works requested a proposal from AECOM to provide construction-related services associated with the construction of the Armory Area Detention Basin. These construction- related services will include, but are not limited to, construction oversight, construction testing and documentation, review of as-built construction drawings, and limited engineering services related to any civil or geotechnical engineering issues which may arise. ANALYSIS AECOM was chosen due to their experience with the design of the Armory Area Detention Basin, and their vast experience in geotechnical-related testing. The construction of Armory Area Detention Basin requires significant testing to comply with the WDNR permit requirements. FISCAL IMPACT The proposed fee is not to exceed $336,413. Funds for this project are included in the Storm Sewer section of the 2014 Capital Improvement Program. RECOMMENDATIONS Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. I have reviewed the proposal and in accordance with Section 12-16 of the Code, I am hereby recommending that the Common Council approve this agreement. Approved, Mark A. Rohloff City Manager SMG/tlt I:\Engineering\2014 CONTRACTS\14-03 Armory Area Det Basin\Project_Information\Correspondence\Memo\14-03 AECOM-CRS Agreement Memo_2-20-14.docx