Loading...
HomeMy WebLinkAbout06. 14-68 FEBRUARY 25, 2014 14-68 RESOLUTION (CARRIED__6-0______LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVAL OF AGREEMENT FOR PROFESSIONAL SERVICES WITH HYDRODESIGNS, INC. TO ASSIST WITH MANAGEMENT OF A POTABLE WATER SYSTEM BACKFLOW CONTROL PROGRAM IN THE AMOUNT OF $143,760.00 INITIATED BY: PURCHASING DIVISION BE IT RESOLVED by the Common Council of the City of Oshkosh that proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with HydroDesigns, Inc. for assistance with management of a potable water system backflow control program including a review of the current program, public awareness, educational material, preparation of reports and a policy manual, ordinance review and recommendations, and 660 industrial and commercial inspections each year for a period of two years in the amount of one hundred forty-three thousand seven hundred sixty dollars ($143,760.00). Acct. No. 541-1866-6401-08665 Water Utility – Contractual Services – Miscellaneous Expense OJHKOJH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Public Works Utility Bureau Manager blIW— DATE: February 20, 2014 RE: Approval of Agreement for Assistance with Performance and Management of a Potable Water System Backflow Control Program/ HydroDesigns, Inc. (HDI) ($143,760) BACKGROUND In 2012, the Wisconsin Department of Natural Resources (WDNR) updated the Administrative Code requirements for the cross-connection control program for industrial, commercial, public authority, and residential properties connected to the water distribution system. A cross-connection is a physical connection between the water supply and another water source that that can cause a back-siphon effect and contaminate the public water supply. Cross-connections are currently prohibited by the City of Oshkosh Municipal Code. The WDNR rules require that a comprehensive cross-connection control program be implemented for elimination of existing cross-connections and prevention for future cross connections. This is to be done through an inspection program for industrial and commercial properties every two years. ANALYSIS The City entered into a two-year agreement with HDI in February 2012 to provide these services. HDI has provided a proposal to continue providing assistance to the City's cross-connection control program program for another two years. The elements in the HDI proposal includes a program review meeting, public awareness program, assistance with educational material, preparation of management reports, review of cross-connection control ordinance, preparation of a policy manual, and 660 industrial and commercial inspections each year over the two-year program for a total of 1,320 inspections. Data management will be also provided throughout the contract period using the HDI Software management program. FISCAL IMPACT The total cost of the program for the 2014 to 2016 time period is $143,760 and is funded in the Water Utility operating budget. This proposed program cost compares to a $159,600 expense for 2012 to 2014. RECOMMENDATIONS Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature may be procured without the use of formal, sealed quotes. I have reviewed this agreement and in accordance with Section 12-16 of the Code, I am hereby recommending that the Common Council approve this agreement. Approved: Mark A. Rohloff City Manager SMB/tlt I.\Engineering\Tracy Taylor'Memos to Mayor&Common Council\2014\HydroDesign-Cross-Connection Ctrl Prog_2-20-14.docx