Loading...
HomeMy WebLinkAboutMarino Construction/CHG OR G-1/Grand Opera House 1/13/1983 kempinger tilyarbro architects, inc. 1 1018 W. SOUTH PARK AVENUE • POST OFFICE BOX 2096 • OSHKOSH, WISCONSIN 54903 • 414/235-3310 CHANGE ORDER NO. G-1 OWNER'S COPY ✓ FILE NO. 8133/79005 CONTRACTOR'S COPY DATE 13 January 1983 ARCHITECT'S COPY OWNER City of Oshkosh, Wisconsin Marino Construction Company CONTRACTOR 3620 S . Clement Avenue, Milwaukee, Wisconsin 53207 General Construction Work, PHASE I, Exterior Restoration CONTRACT FOR and Rehabilitation, The Grand Opera House, Oshkosh, WI . IT IS HEREBY AGREED THE FOLLOWING CHANGE IN THE WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE ATTACHED PROPOSAL AND SUBJECT TO TERMS OF THE ORIGINAL CONTRACT DATED 17 Sept. 1982 SEE ATTACHMENT NO. 1 FOR THE SUM OF (ADD -IRCkL.4) NINE THOUSAND SIX HUNDRED FORTY-TWO AND 81/100THS DOLLARS ($ 9,642. 81 ADD DEDUCT ORIGINAL CONTRACT $224 , 777. 00 PRIOR TO NONE NONE EXTRA ORDERS 9 ,642. 81 THIS ORDER THIS ORDER $9 ,642 . 81 NONE CREDIT ORDERS NONE TOTAL TO DATE $9 ,642 . 81 NONE NET TOTAL TO DATE $234 ,419 .81 APPROVED ACCEPTED / YARBRO- EMPIN ER, ARC ITECTS CITY O,FF HKOSH, W SCONSIN BY / . ✓ BY -'f ��%�� ?.G City Manager G Cf? W�_}BY �, i y r 6• _ x.'( 7}C City Clerk ACCEPTED 1#1/4`eG ` i 4,c.4 � 57' /92r y MARINO CONSTRUCTION COMPANY BY t e n ,,{S l v D oVrsIO� L:;.•• • BY BY ±. � I. r lily <r,, ' GCA i.)„t. • ATTACHMENT NO. 1 Change Order G-1 The Grand Opera House Oshkosh, Wisconsin ITEM NO. 1 Replace deteriorated wood cornice framing members as shown on YARBRO-KEMPINGER ARCHITECTS, INC./PFALLER HERBST ASSOCIATES, INC. ' s Drawing No. A-103, dated 11-2-82. This work was done on a time and material basis not to exceed $8 ,500. 00. Contractor's letter dated January 12 , 1983 is attached. ADD $ 8 ,500 .00 ITEM NO. 2 A. Change wood window balance system from counter- weights to springs. Deduct $198 . 00 B. Remove an existing steel beam and column in Lobby, not originally shown to be removed under Phase I Work Add 295 . 00 Net Add $ 97 .00 Contractor' s two letters, dated 28 December 1982 are attached. Per letter No. 2 NO CHANGE ITEM NO. 3 Change east fire escape railings to requirements of YARBRO-KEMPINGER ARCHITECTS, INC./PFALLER HERBST ASSOCIATES, INC. ' s Drawing No. A-104 , dated 3 December 1982 . This change is necessary to conform to fire escape code. Contractor's letter dated 30 December 1982 is attached. ADD 1,142 . 81 NET ADD $ 9 ,642. 81 y-� ..^TE11 / eece Cf000IMIlle, (Dm10 1.1 MARINO CONSTRUCTION CO. Milwa kee W sconsin Avenue 53207 Incorporated Phone (414) 7444386 GENERAL CONTRACTORS • BUILDERS f January 13, 1983 Yarbro-Kempinger Architects, Inc. P.O. Box 2096 Oshkosh, WI. 54903 Attention: Mr. Robert Yarbro RE: Grand Opera House Change Estimate No. 4 Gentlemen: -- 4 Attached please find our Change Estimate No. 4 for replacing wood framing members along the east cornice as shown on your Drawing No. A103 dated 11/2/82 which will result in an ADD to our contract in the amount of NINE THOUSAND SEVENTEEN DOLLARS AND 88/100 CENTS ($9,017.88) . Please issue the appropriate change order. In accordance with an agreement with Mr. Robert Yarbro, Marino Construction Co. ,Inc. agrees to perform this work for a total of $8,500.00. Respectfully submitted, r' MARINO CONSTRUCTION CO.,INC. 0191 1% � d,i�1D James R. Marino • JRM/mls attach. CJ. ITEM 2 wirr( c 190,5 000 �— , ae `j eee ii — .. Ma) Yar MARINO CONSTRUCTION CO M3620 South Wi Clement Avenue ilwaukee, sconsin53207 Incorporated Phone (414) 7444386 GENERAL CONTRACTORS • BUILDERS December 28, 1982 LE?TER X40. 1 nos DATE Yarbro-Kempinger Architects, Inc. P.O. Box 2096 Oshkosh, WI. 54903 Attention: Mr. Robert Yarbro RE: Change Estimate No. 3 Remove beam in lobby. Gentlemen: Attached please find our change estimate no. 3 to remove beam in lobby which will result in an ADD to our contract in the amount of TWO HUNDRED NINTY-FIVE DOLLARS ($295.00) . Please issue the appropriate change order. Respectfully submitted, MARINO CONSTRUCTION CO.,INC. J V . ( James R. Marino JRM/mls attach. COMMERCIAL • INDUSTRIAL • INSTITUTIONAL BUILDING • Carpentry, Concrete, Masonry 1TeM mu (' 190S 4 -aeocei _111;CG000 . mmm Clement MARINO CONSTRUCTION CO. Mir a kee,�Wisconsin Avenue 53207 Incorporated Phone (414) 744-4386 GENERAL CONTRACTORS • BUILDERS December 28, 1982 — LETTE2 NO.2 T415 Ph T E Yarbro-Kempinger Architects, Inc. P.O. Box 2096 Oshkosh, WI. 54903 Attention: Mr. Robert Yarbro RE: Change Estimate No. 2 Credit for spring balances Gentlemen: Credit for spring balances (Getzel Woodwork, Inc.) $198.00. • Note: We propose to complete the work in change estimate No. 2 as a washout. This would result in no change in our contract for change estimates no. 's 2 and 3. Respectfully submitted, MARINO CONSTRUCTION CO.,INC. James R. Marino JRM/mis a, COMMERCIAL • INDUSTRIAL • INSTITUTIONAL BUILDING • Carpentry, Concrete, Masonry ITEM 3 �m c 190S 4 ceal�— oeeaa ram MARINO CONSTRUCTION CO Milwaukee,6Clement 20 South Avenue 53207 Incorporoted Phone (414) 7444386 GENERAL CONTRACTORS • BUILDERS December 30, 1982 Yarbro-Kempinger Architects, Inc. P.O. Box 2096 Oshkosh, WI. 54903 Attention: Mr. Robert Yarbro RE: Grand Opera House Phase I Change Estimate No. 3 Gentlemen: Attached please find our Change Estimate No. 3 to bring existing fire escapes up to todays state code which will result in an ADD to our contract in the amount of ONE THOUSAND ONE HUNDRED FORTY-TWO DOLLARS AND 81/100 CENTS ($1,142.81) . Please issue the appropriate change order. Respectfully submitted, MARINO CONSTRUCTION CO. , INC. ames R. Marino JRM/mis attach. a r //lam♦ @Ittun COMMERCIAL • INDUSTRIAL • INSTITUTIONAL BUILDING • Carpentry, Concrete, Masonry ATTACHMENT NO. 1 Change Order G-1 The Grand Opera House Oshkosh, Wisconsin ITEM NO. 1 Replace deteriorated wood cornice framing members as shown on YARBRO-KEMPINGER ARCHITECTS , INC./PFALLER HERBST ASSOCIATES, INC. ' s Drawing No. A-103, dated 11-2-82 . This work was done on a time and material basis not to exceed $8 ,500 . 00 . Contractor' s letter dated January 12 , 1983 is attached. ADD $ 8 ,500 .00 ITEM NO. 2 A. Change wood window balance system from counter- weights to springs. Deduct $198 . 00 B. Remove an existing steel beam and column in Lobby, not originally shown to be removed under Phase I Work Add 295 . 00 Net Add $ 97 .00 Contractor' s two letters, dated 28 December 1982 are attached. Per letter No. 2 NO CHANGE ITEM NO. 3 Change east fire escape railings to requirements of YARBRO-KEMPINGER ARCHITECTS, INC./PFALLER HERBST ASSOCIATES , INC. ' s Drawing No. A-104 , dated 3 December 1982 . This change is necessary to conform to fire escape code. Contractor' s letter dated 30 December 1982 is attached. ADD 1,142 . 81 NET ADD $ 9 ,642 . 81 • a r�rn _t since 1908 cen - it N :11121 ' ILL vitt M z i MARINO CONSTRUCTION CO Milwaukee' „I, ;n , Incorporated h,,ne `4141 744-4386 GENERAL CONTRACTORS • BUILDERS January 13, 1983 Yarbro-Kempinger Architects, Inc. P.O. Box 2096 Oshkosh, WI. 54903 Attention: Mr. Robert Yarbro RE: Grand Opera House Change Estimate No. 4 Gentlemen: Attached please find our Change Estimate No. 4 for replacing wood framing members along the east cornice as shown on your Drawing No. A103 dated 11/2/82 which will result in an ADD to our contract in the amount of NINE THOUSAND SEVENTEEN DOLLARS AND 88/100 CENTS ($9,017.88) . Please issue the appropriate change order. In accordance with an agreement with Mr. Robert Yarbro, Marino Construction Co. ,Inc. agrees to perform this work for a total of $8,500.00. Respectfully submitted, MARINO CONSTRUCTION CO. ,INC. James R. Marino JRM/mis attach. os, , COMMERCIAL • INDUSTRIAL • IN5,f il'Tl C)'��+\r ,. ..'. :�:,z, c.r.`.r i - " F.1 • • ESTIMATE SHEET PAGE NO. 1 OF 1 PAGES JQB NAME CONTRACTOR ESTIMATE NO. Grand Opera House Marino Construction Co. ,Tnc. 4 LOCATION ARCHITECT DATE Oshkosh, WI. . Yarbro-Kempinger Architects, Inc. 1/13/83 ESTIMATOR CHECKED BY BID DATE E.O. Schultz .Tames R. Marino JOB DESCRIPTION Replace wood framing members - east side cornice as shown & per letter of Nov. 11-,_ 1982 Drawing A-103,11/2/82 FORWARD 'D E S C R I P T I O N O N QUANTITY ® MATERIAL LABOR SUBCONTRACT TOTAL Car enter 155 hrs. .2.001 IIIIIIIIIIII10.01 ' Laborer 92 hrs. 9.00/ 48.01 II Materials II Lumber treated for rot 111111111 ,580.00 „ Shorin_ lumber used & salva•_ed 90. 0 ' Lumber for re.airs to attic Inabove ' Rough Hdw. nails 26. 0 Scaffold _ 400. 0 --- Truckin: 236. 0 II Small tools etc. . . _ _ • • _ 150. .0 ®■_- 482. 0 5 58.0.1 5 II % tax 124. 0 ®. 11111111 ,616. 0 5, 58.01'. III G.C. 's 15% 390.50 �► II 996.50 5 411111 8 I 60 Bond 1% 8128 �, �1 II II II II II III ■ I II -_,-II II II MIN 11 II TOTAL COSTS • 1 11:8 MISC.JOB EXPENSES AMOUNT II II II OVERHEAD % _" II PROFIT % -" I TOTAL BID SUBMITTED FORM 237 Available from/NeBS)Inc..Groton,Mass.01450 OR TOTAL FORWARD _ . ITEM 2 . . since 1908 ooeco Jo4ricrrnn bc--- k 7 Tirrir— —1Nt*. ,--- ma--t,■■1 ^ 1,......;,-,...... -„_ '" API_t11001101 hakile -----...._____-*" — ''...ij ___J- „wV ____,..........--..,,-__ ,_ f„,Z-1. ___- 44.040,. . MARINO CONSTRUCTION CO M20 South Clement Avenue Milwaukee, Wisconsin 53207 Incorporated Phone (414) 744-4386 GENERAL CONTRACTORS • BUILDERS December 28, 1982 LE7TEa No. 1 THIS PATE Yarbro-Kempinger Architects, Inc. P.O. Box 2096 Oshkosh, WI. 54903 Attention: Mr. Robert Yarbro RE: Change Estimate No. 3 Remove beam in lobby. Gentlemen: Attached please find our change estimate no. 3 to remove beam in lobby which will result in an ADD to our contract in the amount of TWO HUNDRED NINTY-FIVE DOLLARS ($295.00) . Please issue the appropriate change order. Respectfully submitted, MARINO CONSTRUCTION CO.,INC. u,, 7 , I— \ /le!"--1: vil' James R. Marino JRM/mls attach. 4,0--catii?;.> Dyki i--,--r, ,N,t5,q;•••._ , .■.ii..,Ed COMMERCIAL • INDUSTRIAL • INSTITUTIONAL BUILDING • Carpentry, Concrete, Masonry since 1908 cn Lir a r MEM'r 0„, 7"%atiWfilltS11111141111-F • MAR I NO CO N ST R U CT I 0 N CO. 3620 South Clement Avenue Milwaukee, Wisconsin 53207 Incorporated Phone (414) 744-4386 GENERAL CONTRACTORS • BUILDERS December 28, 1982 — LETTER 1402 T415 DATE Yarbro-Kempinger Architects, Inc. P.O. Box 2096 Oshkosh, WI. 54903 Attention: Mr. Robert Yarbro RE: Change Estimate No. 2 Credit for spring balances Gentlemen: Credit for spring balances (Getzel Woodwork, Inc.) $198.00. Note: We propose to complete the work in change estimate No. 2 as a washout. This would result in no change in our contract for change estimates no. 's 2 and 3. Respectfully submitted, MARINO CONSTRUCTION CO. ,INC. plzr7 James R. Marino JRM/mls .••••■ COMMERCIAL • INDUSTRIAL • INSTITUTIONAL BUILDING. • Carpentry, Concrete, Maschny ITE M 3 since 1908 Irmo NMI W,L1 r opt, _ _ II■timilmplikkfAhr vt MARINO CONSTRUCTION CO 3620 South Clem; Avenue Milwaukee, Wisconsin 53207 Incorporated Phone (414) 744-4386 GENERAL CONTRACTORS • BUILDERS December 30, 1982 Yarbro-Kempinger Architects, Inc. P.O. Box 2096 Oshkosh, WI. 54903 Attention: Mr. Robert Yarbro RE: Grand Opera House Phase I Change Estimate No. 3 Gentlemen: Attached please find our Change Estimate No. 3 to bring existing fire escapes up to todays state code which will result in an ADD to our contract in the amount of ONE THOUSAND ONE HUNDRED FORTY-TWO DOLLARS AND 81/100 CENTS ($1,142.81) . Please issue the appropriate change order. Respectfully submitted, MARINO CONSTRUCTION CO. , INC. lames R. Marino JRM/mls attach. ( COMMERCIAL • INDUSTRIAL • INSTITUTIONAL BUILDING • Carpentry, Concrete, Masonry yarbro - kempinger _ architects, inc. r 1018 W. SOUTH PARK AVENUE • POST OFFICE BOX 2096 • OSHKOSH, WISCONSIN 54903 • 414/235-3310 CHANGE ORDER NO G-1 OWNER'S COPY FILE NO. 8133/79005 CONTRACTOR'S COPY DATE 13 January 1983 ARCHITECT'S COPY OWNER City of Oshkosh, Wisconsin Marino Construction Company CONTRACTOR 3620 S. Clement Avenue, Milwaukee, Wisconsin 53207 General Construction Work, PHASE I, Exterior Restoration CONTRACT FOR and Rehabilitation, The Grand Opera House, Oshkosh, WI . IT IS HEREBY AGREED THE FOLLOWING CHANGE IN THE WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE ATTACHED PROPOSAL AND SUBJECT TO TERMS OF THE ORIGINAL CONTRACT DATED 17 Sept. 1982 SEE ATTACHMENT NO. 1 FOR THE SUM OF (ADD -MPATC3t) NINE THOUSAND SIX HUNDRED FORTY-TWO AND 81/100THS DOLLARS ($ 9 ,642. 81 ) ADD DEDUCT ORIGINAL CONTRACT $224 , 777 . 00 PRIOR TO NONE NONE EXTRA ORDERS 9 ,642. 81 THIS ORDER THIS ORDER $9 ,642 . 81 NONE CREDIT ORDERS NONE TOTAL TO DATE $9 ,642 . 81 NONE NET TOTAL TO DATE $234 ,419 .81 APPROVED ACCEPTED YARBRO- EMPIN ER, ARC ITECTS CITY OF • KOSH, WTSCO N BY V _ BY 4,r `,.6e..,. -dity Manager BY it,K. u 1j. vr,(: R/4',i City Clerk ACCEPTED ',proved��g- lo forte '. MARINO CONSTRUCTION COMPANY IY l a WI.n - / �%,5/ C/.71y 61/24 lit t/ p s,,ry fh BY -- >/-4./i1 //,/ ,;/(� BY ..,_ ,'_, , .:ti t I l Y,� ∎t t i . ;T'