Loading...
HomeMy WebLinkAbout10. 14-61 FEBRUARY 11, 2014 14-61 RESOLUTION (CARRIED__7-0______LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVAL OF ENGINEERING SERVICES AGREEMENT WITH AECOM TECHNICAL SERVICES INC FOR THE DESIGN OF THE SNELL ROAD SANITARY SEWER PUMP STATION ($137,834.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with AECOM Technical Services, Inc. for design services for the Snell Road Sanitary Sewer Pump Station in the amount of one hundred thirty-seven thousand eight hundred thirty-four dollars ($137,834.00) Acct. No. 551-1910-1799-00000 Sewer Utility Construction Work in Progress O11-KOJH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works sinz, DATE: February 6, 2014 RE: Engineering Services Agreement for Design of the Snell Road Sanitary Sewer Pump Station / AECOM Technical Services, Inc. (AECOM) ($137,834) BACKGROUND The City is planning on constructing the Snell Road West Lift Station, which will replace the existing Fountain Avenue Lift Station. This construction is part of a multi-phase construction process over the next several years. Currently, the sanitary sewer collection system to the east of the existing pump station is at capacity, hampering future development. The overall construction will re-route some of the existing flows to the proposed lift station, which will give the sanitary sewer additional capacity providing the City the potential for future development. ANALYSIS Department of Public Works staff requested proposals from four different engineering firms. After careful review of the proposals, AECOM was selected based on several factors. AECOM's proposal demonstrated a significant understanding of the project and the challenges associated with designing a sanitary sewer lift station to integrate it into the existing system. AECOM's proposal also offered many unique ideas for the proposed design. In addition, AECOM has demonstrated a thorough understanding of the City of Oshkosh's sanitary sewer collection system and how the proposed projects will impact the entire system. FISCAL IMPACT The cost of the proposal selected is $137,834. Funds for this project are included in the Wastewater section of the 2012 Capital Improvement Program (CIP). RECOMMENDATIONS Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. I have reviewed the proposal and in accordance with Section 12-16 of the Code, I am hereby recommending that the Common Council approve this agreement. Approv d, Mar A. Rohloff City Manager SMG/tlt I:\Engineering\Tracy Taylor\Memos to Mayor&Common Council\14-12 Eng Des Sery Memo-AECOM_2-6-14.docx