Loading...
HomeMy WebLinkAboutPW CNT 12-11/CNG OR 3/PTS Contractors " DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 Fax(920)236-5068 OJH<OJH ON THE WATER January 15, 2014 Mr. Steve Horn PTS Contractors, Inc. 4075 Eaton Road Green Bay, WI 54311-9340 Re: Change Order No. 3 (FINAL) Contract 12-11 Dear Mr. Horn: - Enclosed is an executed copy of Change Order No. 3 (FINAL) between the City of Oshkosh and PTS Contractors, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, D„- p David C. Patek, P.E. Director of Public Works DCP/tit Enclosure: Change Order No. 3 (FINAL) cc: Pam Ubrig, City Clerk(w/original) Lynn Lorenson, City Attorney (w/copy) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) I:\Engineering\12-11 San MH Rehab-I&I Reduction Prog\Project_Information\Contract Info\Change Orders\12-11 Page 1 of 1 Executed CO#3 Ltr 1-15-14.docx • TO: PTS Contractors, Inc. CHANGE ORDER#3 FINAL 4075 Eaton Road Dated: December 6, 2013 Green Bay, WI 54311-9340 Your present contract with the City of Oshkosh, Contract No. 12-11, awarded October 23, 2012, is hereby amended and changed as follows: NET DECREASE TO: SECTION I REPLACE SANITARY MANHOLES, SECTIONS, FRAMES, &LIDS ($117,369.96) NET DECREASE TO: SECTION II SANITARY MANHOLE GROUTING(CONES AND WALLS) ($610.00) NET DECREASE TO: SECTION III SANITARY MANHOLE GROUTING(BASE SECTIONS) ($10,331.30) NET INCREASE TO: SECTION IV SANITARY MANHOLE&SEWER ABANDONMENT $0.00 NET INCREASE TO: SECTION V SANITARY MANHOLE STRUCTURAL CEMENTITIOUS LINER $9,612.63 NET INCREASE TO: SECTION VI STORM SEWER WORK ON KOELLER STREET $0.00 NET INCREASE TO: SECTION VII ADDITIONAL STORM SEWER WORK $1,590.76 NET DECREASE TO CONTRACT ($117,107.87) SECTION I SECTION II SECTION III SECTION IV SECTION V SECTION VI SECTION VII Totals Bid Total $790,037.42 $94,876.00 $12,512.50 $8,897.20 $4,882.50 $0.00 $0.00 $911,205.62 C.O.#1 $5,293.62 $3,438.75 $0.00 $0.00 $0.00 $0.00 $0.00 $8,732.37 Prev.Contract Total $795,331.04 $98,314.75 $12,512.50 $8,897.20 $4,882.50 $0.00 $0.00 $919,937.99 C.O.#2 $3,538.12 $30,240.10 $0.00 $40,341.49 $0.00 $33,083.25 $0.00 $107,202.96 Contract Total $798,869.16 $128,554.85 $12,512.50 $49,238.69 $4,882.50 $33,083.25 $0.00 $1,027,140.95 C.O.#3 ($117,369.96) ($610.00) ($10,331.30) $0.00 $9,612.63 $0.00 $1,590.76 ($117,107.87) Contract Total $681,499.20 $127,944.85 $2,181.20 $49,238.69 $14,495.13 $33,083.25 $1,590.76 $910,033.08 CITY OF OSHKOSH BY: Recommended: City Manager _Ns..d = I' I -a, Director of Public Works City Clerk A proved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Appr• ed as to form:„,„...,„„k_ •City A • ey ` CONTRACT:12-11 CHANGE ORDER#3 FINAL SECTION I-Replace Sanitary Manholes,Sections,Frames and Lids ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE _ PRICE CONTRACT PRICE CONTRACT PRICE 100 Replace sanitary manhole casting(City to furnish casting),complete as specified Each 356.00 242.00 -114.00 $145.00 ($16,530.00) 102 9"external manhole chimney seal,complete as specified Each 363.00 217.50 -145.50 $649.00 ($94,429.50) 103 8"external chimney seal extension,complete as specified Each 115.00 5.00 -110.00 $157.00 ($17,270.00) 104 10"internal manhole chimney seal,complete as specified Each 77.00 66.00 -11.00 $234.00 ($2,574.00) 105 10"internal chimney seal extension,complete as specified Each 4.00 2.00 -2.00 $120.00 ($240.00) 106 7"internal chimney seal extension,complete as specified Each 38.00 34.00 -4.00 $80.00 ($320.00), 107 Concrete adjustment rings, Vertical complete as specified Feet 42.00 67.79 25.79 $215.00 $5,544.13 108 Rubber adjusting rings, Vertical complete as specified Feet 12.00 12.84 0.84 $737.00 $619.08 109 Saw cut concrete pavement,complete as Linear specified Feet 9120.00 6,902.80 -2,217.20 $1.69 ($3,747.07) 110 Remove concrete pavement,complete as Square specified Yards 3064.00 3,505.84 441.84 $4.56 $2,014.79 111 Drilled tie bars,complete as specified Each 2464.00 2,308.00 -156.00 $5.08 ($792.48) 112 8"concrete pavement/patching, Square complete as specified Yards 64.00 322.18 258.18 $73.00 $18,847.14 113 7"concrete pavement/patching, Square complete as specified Yards 3000.00 2,494.18 -505.82 $68.13 ($34,461.52) 114 Remove and replace concrete curb and gutter, Linear complete as specified Feet 192.00 99.70 -92.30 $28.50 ($2,630.55) 115 Remove and replace concrete sidewalk, Square complete as specified Feet 75.00 535.46 460.46 $5.08 $2,339.14 116 Saw cut asphalt pavement, Linear complete as specified Feet 5856.00 2,705.20 -3,150.80 $0.82 ($2,583.66) 117 Remove and replace HMA pavement,complete as Square specified Yards 1968.00 1,718.46 -249.54 $40.68 ($10,151.29) 118 Lawn restoration,complete Square as specified Yards 1090.00 899.52 -190.48 $13.35 ($2,542.91) 119 Traffic control,complete as Lump specified Sum 1.00 1.00 $9,400.00 120 Manhole lid plugs, complete as specified Each 415.00 440.00 25.00 $7.60 $190.00 Page 2 of 6 CONTRACT:12-11 CHANGE ORDER#3 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 121 Tuck point manhole, complete as specified Each 61.00 84.00 23.00 $250.00 $5,750.00 122 8"HES concrete pavement/patching, Square complete as specified Yards 32.00 18.30 -13.70 $83.00 ($1,137.10) 123 7"HES concrete pavement/patching, Square complete as specified Yards 375.00 338.90 -36.10 $77.00 ($2,779.70) 124 Remove and replace concrete curb(HES), Linear complete as specified Feet 30.00 0.00 -30.00 $30.00 ($900.00) 125 4'diameter manhole riser Vertical with sand slurry backfill Feet 68.00 145.62 77.62 $425.00 $32,988.50 SECTION I-(BID ITEMS 100-125)-SUB-TOTAL: $68,292.78 ($193,089.78) ADDITIONAL WORK REQUIRED: C.O.#1-SECTION I ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 101 4'diameter manhole riser, Linear complete as specified Feet 4.00 4.00 $337.00 1001 Sanitary sewer main repair on Fairview. Segment was Lump identified for repair by Sum televising 1.00 1.00 $2,265.00 1002 Storm sewer main repair on Fairview. Previously Lump damaged CMP storm Sum sewer was replaced with SDR 35 1.00 1.00 $1,130.62 1003 Additional sealing of the partial depth sawcuts Linear added to save on concrete Feet removal 200.00 160.20 -39.80 $2.75 ($109.45) ADDITIONAL WORK: C.O.#1-(ITEMS 101,1001-1003)-SUB-TOTAL: $0.00 ($109.45) ADDITIONAL WORK REQUIRED: C.O.#2-SECTION I ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 1005 Doweled pavement bars on Each S.Main St. 70.00 70.00 $11.55 1006 Detectable Warning Field Square Foot 8.00 8.00 $34.50 1007 Lateral Reconnect at MH Time& 03-491 Materials 1.00 1.00 $1,906.81 Credit for use of Infi-shield 1009 External Chimney Seal Each 136.00 136.00 ($10.00) Excessive water in existing Time& 1010 sanitary trench MH 14-139 Materials 1.00 1.16 0.16 $1,906.81 $300.93 ADDITIONAL WORK: C.O.#2-(ITEMS 1005-1010)-SUB-TOTAL: $300.93 $0.00 ADDITIONAL WORK REQUIRED: C.O.#3-SECTION I ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Contaminated soil 1004 encountered on Sterling Tons 0.00 57.41 57.41_ $18.25 $1,047.73 Page 3 of 6 CONTRACT:12-11 CHANGE ORDER#3 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Excess material purchase: 1011 Infi-shield external seals Each 0.00 51.00 51.00 $121.33 $6,187.83 ADDITIONAL WORK: C.O.#3-(ITEMS 1004&1011)-SUB-TOTAL: $7,235.56 $0.00 NET DECREASE TO SECTION I: ($117,369.96) SECTION II-Sanitary Manhole Grouting(Cones&Walls) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER _ QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 200 Sanitary manhole grouting setup,complete as specified Each 116.00 115.00 -1.00 $610.00 ($610.00) 201 Sanitary manhole grout, complete as specified Gallons 6,615.00 6,615.00, $8.14 202 Traffic control,complete as Lump specified Sum 1.00 1.00 $510.00 SECTION II-(BID ITEMS 200-202)-SUB-TOTAL: $0.00 ($610.00) ADDITIONAL WORK REQUIRED: C.O.#1-SECTION II ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2001 Cost to seal the sanitary manhole in the park near Hazel/Parkway intersection. Additional effort required than what was bid due to failed cap Lump on an abandoned line. Sum 1.00 1.00 $3,438.75 ADDITIONAL WORK: C.O.#1-(ITEM 2001)-SUB-TOTAL: $0.00 $0.00 NET INCREASE TO SECTION II: ($610.00) SECTION III-Sanitary Manhole Grouting(Base Sections) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 300 Sanitary manhole grouting setup,complete as specified Each 15.00 2.00 -13.00 $610.00 ($7,930.00) 301 Sanitary manhole grout, complete as specified Gallons 375.00 80.00 -295.00 $8.14 ($2,401.30) 302 Traffic control,complete as Lump specified Sum 1.00 1.00 $310.00 SECTION III-(BID ITEMS 300-302)-SUB-TOTAL: $0.00 ($10,331.30) NET DECREASE,TO SECTION III: ($10,331.30) SECTION IV-Sanitary Manhole&Sewer Abandonment ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3101 Furnish and install standard sanitary manhole (4'diameter)with sand Vertical slurry backfill Feet 85.42 85.42 $410.00 Page 4 of 6 Y CONTRACT:12-11 CHANGE ORDER#3 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3800 Abandon sanitary manhole, complete as specified Each 8.00 8.00 $780.00 3808 Abandon 15"sanitary sewer,complete as Linear specified Feet 760.00 760.00 $3.72 SECTION IV-(BID ITEMS 3101-3808)-SUB-TOTAL: $0.00 $0.00 ADDITIONAL WORK REQUIRED: C.O.#2-SECTION IV ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3815 Abandon 26"sanitary sewer,complete as Linear specified. Feet 463.90 463.90 $11.10 ADDITIONAL WORK: C.O.#2-(ITEM 3815)-SUB-TOTAL: $0.00 $0.00 NET INCREASE TO SECTION IV: $0.00 SECTION V-Sanitary Manhole Structural Cementitous Liner ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 400 Sanitary manhole structural cementitious liner setup, complete as specified Each 6.00 17.00 11.00 $712.00 $7,832.00 401 Structural cementitious liner, complete as Vertical specified Feet 30.00 117.50_ 87.50, $20.35 $1,780.63 SECTION V-(BID ITEMS 400-401)-SUB-TOTAL: $9,612.63 $0.00 NET INCREASE TO SECTION V: $9,612.63 SECTION VI-Koeller Street Storm Sewer ADDITIONAL WORK REQUIRED: C.O.#2-SECTION VI ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 6000 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-1,dated 5/31/13,complete as Lump specified Sum 1.00 1.00 $6,269.16 Page 5 of 6 CONTRACT:12-11 CHANGE ORDER#3 FINAL ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 6001 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-2,dated 5/31/13,complete as Lump specified Sum 1.00 1.00 $7,766.42 6002 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-3,dated 5/31/13,complete as Lump specified Sum 1.00 1.00 $2,963.07 6003 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-4,dated 5/31/13,complete as Lump specified Sum 1.00 1.00 $6,682.93 6004 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-5,dated 5/31/13,complete as Lump specified Sum 1.00_ 1.00 $4,413.62 6005 Additional equipment, labor,and materials to install storm sewer on Koeller Street per Invoice 13-621-Koeller-6,dated 5/31/13,complete as Lump specified Sum 1.00 1.00 $4,988.05 ADDITIONAL WORK: C.O.#2-(ITEMS 6000-6005)-SUB-TOTAL: $0.00 $0.00 NET INCREASE TO SECTION VI: $0.00, SECTION VII-Additional Storm Sewer Work ADDITIONAL WORK REQUIRED: C.O.#3-SECTION VII ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Additional storm sewer lateral work required on 7001 Contract 12-04(final change order already Lump processed) Sum 0.00 1.00 1.00 $1,590.76 $1,590.76 ADDITIONAL WORK: C.O.#3-(ITEM 7001)-SUB-TOTAL: $1,590.76 $0.00 NET INCREASE TO SECTION VII: $1,590.76 NET INCREASE TO SECTIONS I-VII: $87,032.66 NET DECREASE TO SECTIONS I-VII: ($204,140.53) NET DECREASE TO CONTRACT: ($117,107.87) Page 6 of 6