HomeMy WebLinkAboutPW CNT 13-04/CHG OR 1/Carl Bowers & Sons DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 (411) Oshkosh,Wisconsin 54903-1130 Fa.(920)236-5065 Of HKOfH Fax(920)236-5068 ON THE WATER January 15, 2014 Mr. Bill Bowers Carl Bowers & Sons Construction Co., Inc. N1844 Maloney Road Kaukauna, WI 54130 Re: Change Order No. 1 (FINAL) Contract 13-04 Dear Mr. Bowers: Enclosed is an executed copy of Change Order No. 1 (FINAL) between the City of Oshkosh and Carl Bowers & Sons Const. Co., Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, David C. Patek, P.E. 7)71-- Director of Public Works DCP/tlt Enclosure: Change Order No. 1 (FINAL) cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, City Attorney (w/copy) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) I:\Engineering\13-04 Cone Paving&Util\Project_Information\Contract Info\Change Orders\13-04 Executed CO#1 Page 1 of 1 Ltr_1-15-14.docx TO: Carl Bowers & Sonsc Const. Co., Inc. CHANGE ORDER# 1 FINAL N1844 Maloney Rd. DATED: DECEMBER 13, 2013 Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No. 13-04, awarded Apirl 9, 2013, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING 44,117.26 NET INCREASE TO: SECTION II - STORM SEWER 72,897.54 NET INCREASE TO: SECTION III - SANITARY SEWER 16,484.61 NET INCREASE TO: SECTION IV- WATER MAIN 13,114.89 NET INCREASE TO CONTRACT $146,614.30 Section I Section II Section III Section IV (Paving) (Storm) (Sanitary) (Water) Totals Bid Total $1,045,155.54 S1,119,002.51 $630,689.50 $624,990.11 $3,419,837.66 C.O. #1 $44,117.26 $72,897.54 $16,484.61 $13,114.89 $146,614.30 Contract Total $1,089,272.80 S1,191,900.05 $647,174.11 $638,105.00 $3,566,451.96 CITY OF OSHKOSH BY:Recommended: City Ma r \ a 1_0)"1/ Director of Public Works City Clerk Approved and accepted: ontractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. o ptroller Approved as tr form: City Attorney CONTRACT: 13-04 CHANGE ORDER#1 FINAL SECTION I-PAVING ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 1011 Clearing,complete as Inch specified Diameter 129 230.20 101.20 $12.00 $1,214.40 1021 Grubbing,complete as Inch specified Diameter 129 230.20 101.20 $12.00, $1,214.40 1100 Removing pavement, Square complete as specified Yards 6,975 7,087.50 112.50 $2.00 $225.00 1101 Remove underground scale pit,complete as Lump specified Sum 1 1.00 $2,500.00 1102 Remove rails,complete as Linear specified Feet 574 75.00 -499.00 $3.00 ($1,497.00) 1103 Remove and haul railroad ties,complete as specified Tons 20 0.00 -20.00 $30.00 ($600.00) 1104 Reset section monument and re-establish witness monuments,complete as Lump specified Sum 1 1.00 $1,000.00 1120 Removing concrete and asphalt sidewalk and driveway,complete as Square specified Feet 46,400 48,099.50 1,699.50 $0.50 $849.75 1200 Excavation,complete as Cubic specified Yards 9,060 11,245.70 2,185.70 $8.50 $18,578.45 1220 Excavation special (paving),complete as specified Tons 972 0.00 -972.00 $7.00 ($6,804.00) 1301 7"concrete pavement,5" CABC and grading, Square complete as specified Yards 13,145 12,295.80 -849.20 $28.00 ($23,777.60) 1303 7"concrete pavement HES,5"CABC and grading, complete as Square specified Yards 640 654.30 14.30 $32.00 $457.60 1311 8"concrete pavement HES,6"CABC and grading,complete as Square specified Yards 865 0.00 -865.00 $32.50 ($28,112.50) 1313 8"concrete pavement HES,6"CABC and grading,complete as Square specified Yards 715 1,714.10 999.10 $42.00 $41,962.20 1315 8"concrete pavement doweled,HES,6"CABC and grading,complete as Square specified Yards 2,281 2,301.00 20.00 $35.50 $710.00 1340 Crushed aggregate base course, complete as specified Tons 3,450 6,293.60 2,843.60 $4.00 $11,374.40 1350 Pavement ties,complete as specified Each 125 298.00 173.00 $7.00 $1,211.00 1360 Adjust manholes and inlets,complete as specified Each 150 149.00 -1.00 $150.00 ($150.00) 1370A Terrace work on West New York Avenue,complete as Lump specified Sum 1 1.00 $16,500.00 Page 2 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 1370B Terrace work on 10th Avenue,complete as Lump specified Sum 1 1.00 $9,500.00 1410 12 radius curb with 6" CABC and grading, Linear complete as specified Feet 1,070 1,091.10 21.10 $6.00 $126.60 1440 30"curb and gutter,7"with 5"CABC and grading, complete as specified Linear Feet 890 993.90 103.90 $26.00 $2,701.40 1451 36"mountable curb and gutter HES,8",with 6" CABC and grading, Linear complete as specified Feet 1,000 986.40 -13.60 $12.00 ($163.20) 1460 Sidewalk curb, complete as Linear specified Feet 140 48.00 -92.00 $17.00 ($1,564.00) 1500 4"concrete sidewalk with 3"CABC and grading, Square complete as specified Feet 16,110 19,038.20 2,928.20 $3.40 $9,955.88 1510 6"concrete sidewalk/driveway/ramp with 3"CABC and grading, complete as specified Square Feet 16,180 17,472.60 1,292.60 $3.70 $4,782.62 1520 8"concrete sidewalk/driveway/ramp with 3"CABC and grading, complete as specified Square Feet 2,500 921.20 -1,578.80 $4.05 ($6,394.14) 1524 8"concrete sidewalk/driveway/ramp (HES)with 3"CABC and grading, complete as Square specified Feet 2,280 2,582.00 302.00 $4.15 $1,253.30 1530 6"concrete step, complete Square as specified Feet 33 61.50 28.50 $25.25 $719.63 1540 Curb ramp detectable warning field(natural/non- painted), complete as Square specified Feet 420 392.00 -28.00 $24.25 ($679.00) 1550 No.4 reinforcing rods- deformed,epoxy-coated, Linear complete as specified Feet 3,540 4,400.00 860.00 $0.70 $602.00 1560 Drilled No.4 sidewalk tie bars,deformed,epoxy- coated,complete as specified Each 597 370.00 -227.00 $1.32 ($299.64) 1600 Furnish and install tree, complete as specified Each 2 2.00 $250.00 1700 Sawing existing pavement, complete as specified Linear Feet 1,643 1,634.50 -8.50 $1.00 ($8.50) 1710 Sawing concrete pavement full depth,complete as Linear specified Feet 695 713.50 18.50 $1.75 $32.38 1900 Tack coat,complete as specified Gallons 100 7.40 -92.60 $13.50 ($1,250.10) 1910 5"asphaltic transition with 10"CABC and grading, complete as specified Square Yards 2,460 2,364.30 -95.70 _ $28.00 ($2,679.60) Page 3 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 1911 4"asphaltic transition with 10"CABC and grading, complete as specified Square Yards 330 310.20 -19.80 $32.00 ($633.60) 1915 5"asphaltic surface,with 6" Square CABC and grading Yards 1,075 1,280.30 205.30 $29.00 $5,953.70 1916 4"asphaltic surface with 6" CABC and grading, Square complete as specified Yards 505 611.30 106.30 $33.00 $3,507.90 SECTION I-(BID ITEMS 1011-1916)-SUB-TOTALS $107,432.61 ($74,612.88) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 10000 Furnish and install 6"HES concrete sidewalk and driveway on W. New York Ave.and on W. 10th Ave. (difference in bid price for 6"concrete sidewalk and driveway), complete as Square specified Feet 0.00 3,143.90 3,143.90 $0.35 $1,100.37 10001 Install additional concrete to provide a 12"thickened section along the street side edge of 8"concrete driveway aprons on E. 10th Ave,complete as specified Linear Feet 0.00 310.30 310.30 $8.80 $2,730.64 10002 Remove and replace 21 linear feet of severly tipped 18"retaining wall adjacent to new sidewalk work at 1207 High Ave. (W. New York Ave.side)(cost to be assessed back to property owner), complete as Lump specified Sum 0.00 1.00 1.00 $880.00 $880.00 10003 Re-set110 Linear Feet of landscape block adjacent to excavation below sub- grade work in front of Alro Steel,43 E. 10th Ave., Lump complete as specified Sum 0.00 1.00 1.00 $2,540.00 $2,540.00 10004 Profile saw cut curb at 1415 W.New York Ave., Lump complete as specified Sum 0.00 1.00 1.00 $425.00 $425.00 10005 Provide terrace restoration work beyond project limits for Wisconsin Public Service new gas main work on W.New York Ave.and on W. 10th Ave.(WPS to be invoiced full amount), complete as specified Lump Sum 0.00 1.00 1.00 $1,162.92 $1,162.92 Page 4 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 10006 Apply joint sealer between new sidewalk and building at the southeast corner of W. 10th Avenue and Oregon Street,complete Lump as specified Sum 0.00 1.00 1.00 $400.00 $400.00 10007 Furnish and install steel plates on shallow manholes and inlets, complete as specified Each 0.00 2.00 2.00 $604.30 $1,208.60 10008 Penalty for Trucks off the designated truck route on July 17,2013,per SP-4 Each 0.00 -2.00 -2.00 $200.00 ($400.00) 10009 Additional cost for removing underground scale pit beyond plan limits at Sadoff Iron&Metal Company 36 E. 10th Lump Avenue Sum 0.00 1.00 1.00 $1,250.00 $1,250.00 ADDITIONAL WORK: C.O.#1-(ITEMS 10001-10009)-SUB-TOTAL $11,697.53 ($400.00) NET INCREASE TO: SECTION I $44,117.26 SECTION II-STORM SEWER ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2006 Clear trees,complete as Lump specified Sum 1 1.00 $500.00 2008 Clear shrubs,complete as Lump specified Sum 1 1.00 $500.00 2014 Storm sewer utility line opening,complete as specified Each 5 4.00 -1.00 $300.00 ($300.00) 2034 Furnish and install 10" storm sewer,complete as Linear specified Feet 305 305.50 0.50 $43.00 $21.50 2036 Furnish and install 12" storm sewer,complete as Linear specified Feet 1,125 1,214.60 89.60 $44.00 $3,942.40 2038 Furnish and install 12" RCP Class Ill storm sewer, complete as specified Linear Feet 60 62.20 2.20 $50.00 $110.00 2042 Furnish and install 15" storm sewer,complete as Linear specified Feet 140 208.60 68.60 $51.00 $3,498.60 2048 Furnish and install 18" storm sewer,complete as Linear specified Feet 715 756.00 41.00 $52.00 $2,132.00 2054 Furnish and install 21" storm sewer,complete as Linear specified Feet 190 166.80 -23.20 $55.00 ($1,276.00) 2060 Furnish and install 24" storm sewer,complete as Linear specified Feet 630 659.10 29.10 $56.00 $1,629.60 Page 5 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2078 Furnish and install 36" storm sewer,complete as Linear specified Feet 15 0.00 -15.00 $90.00 ($1,350.00) 2108 Furnish and install 66" storm sewer,complete as Linear $176.00 $1,284.80 specified Feet 1,420 1,427.30 7.30 $ 2128 Furnish and install 24"x 38"HERCP Class III storm sewer,complete as Linear 2,839.20 specified Feet 800 763.60 -36.40 $78.00 ($2,839.20) 2186 Furnish and install 4'x 8' box culvert storm sewer, Linear complete as specified Feet 750 734.40 -15.60 $341.00 ($5,319.60) 2234 Furnish and install 4'x 8' box culvert storm sewer with manhole or inlet riser, complete as specified Linear $341.00 Feet 32 32.00 2280 Furnish and install 6"storm lateral,complete as Linear specified Feet 1,170 1,197.20 27.20 $30.00 $816.00 2282 Furnish and install 8"storm lateral,complete as Linear 42 p0 $2,289.00 specified Feet 35 89.50 54.50 $ 2284 Furnish and install storm sewer marker balls, complete as specified Each 107 98.00 -9.00 $20.00 ($180.00) ) 2286 Furnish and install clay dams,complete as specified Each 54 47.00 -7.00 $30.00 ($210.00) 2288 Furnish and install lateral inlet,complete as specified Each 38 32.00 -6.00 $350.00 ($2,100.00) 2374 Furnish and install 4'x 8' box culvert end section with joint ties,complete as $4,000.00 specified Each 1 1.00 2532 Furnish and install standard storm manhole(4' diameter),complete as Vertical specified Feet 80 84.47 4.47 $285.00 $1,273.95 2534 Furnish and install standard storm manhole(5' diameter),complete as Vertical 1,792.00 specified Feet 28 22.88 -5.12 $350.00 ($1,792.00) 2552 Furnish and install standard storm manhole(8' x 8'box),complete as Vertical specified Feet 104 113.00 9.00 $750.00 $6,750.00 2580 Furnish and install storm junction chamber, $12,000.00 complete as specified Each 1 1.00 2584 Furnish and install standard storm manhole riser(4'diameter), Vertical complete as specified Feet 6 2.94 -3.06 $250.00 ($765.00) 2596A Furnish and install storm manhole N-46,complete $5,000.00 as specified Each 1 1.00 Page 6 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2596B Furnish and install storm manhole N-48,complete as specified Each 1 1.00 $5,000.00 2612 Furnish and install Type 1 inlet,complete as specified Each 7 8.00 1.00 $1,450.00 $1,450.00 2614 Furnish and install Type 3 inlet(with 18"sump), complete as specified Each 50 49.00 -1.00 $1,400.00 ($1,400.00) 2616 Furnish and install Type 3 inlet,complete as specified Each 19 18.00 -1.00 $1,350.00 ($1,350.00) 2800 Connect to existing storm sewer,complete as specified Each 8 4.00 -4.00 $300.00 ($1,200.00) 2802 Connect to existing storm lateral,complete as specified Each 4 6.00 2.00 $100.00 $200.00 2806 Connect to existing manhole,complete as specified Each 1 4.00 3.00 $500.00 $1,500.00 2808 Connect to existing inlet, complete as specified Each 1 1.00 $500.00 2820 Abandon 8"-12"storm sewer,complete as Linear specified Feet 260 260.00 $4.00 2822 Abandon 15"and larger storm sewer,complete as Linear specified Feet 1,555 1,555.00 $13.00 2824 Remove 30"and smaller storm sewer,complete as Linear specified Feet 970 970.00 $15.00 2826 Remove 33"-60"storm sewer,complete as Linear specified Feet 125 125.00 $35.00 2830 Abandon storm manholes and inlets,complete as specified Each 19 19.00 $350.00 2832 Remove storm manholes and inlets,complete as specified Each 23 23.00 $350.00 2858 Furnish,install, maintain and remove Type D modified inlet protection, complete as specified Each 130 121.00 -9.00 $82.00 ($738.00) 2860 Sediment removal-Type D modified inlet protection, complete as specified Each 130 7.00 -123.00 $3.00 ($369.00) 2862 Furnish, install,maintain and remove stone tracking pad,complete as specified Each 1 0.00 -1.00 $0.01 ($0.01) 2866 Furnish, install,maintain and remove stone bag, complete as specified Each 50 0.00 -50.00 $10.00 ($500.00) 2868 Furnish, install, maintain and remove 12"diameter sediment logs,complete as Linear specified Feet 60 65.00 5.00 $10.00 $50.00 Page 7 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2876 Furnish, install,maintain and remove turbidity barrier,complete as specified Each 1 1.00 $3,500.00 2930 Furnish and install Class I, Type A erosion control mat,complete as specified Square Yards 109 109.00 $5.00 2948 Furnish and install heavy rip-rap with filter fabric, Square complete as specified Yards 15 73.30 58.30 $100.00 $5,830.00 2960 Rock excavation,complete Cubic as specified Yards 50 0.00 -50.00 $0.01 ($0.50) 2990 Excavation special(storm), complete as specified Tons 200 0.00 -200.00 $12.00 ($2,400.00) 2992 Bentonite slurry dam (storm),complete as specified Each 5 5.00 $600.00 2994 Over-excavation(storm), Cubic _complete as specified Yards 100 77.00 -23.00 $12.00 ($276.00) SECTION II-(BID ITEMS 2006-2994)-SUB-TOTALS $32,777.85 ($24,365.31) ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION II INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2066 Furnish and install 27" • storm sewer,complete as Linear specified Feet 0 12.50 12.50 $60.00 $750.00 2072 Furnish and install 30" storm sewer,compelte as Linear specified Feet 0 5.00 5.00 $65.00 $325.00 20000 Additional equipment, labor,&materials to cap abondoned storm lateral tapped into the sanitary sewer&cut down 30" invert in manhole 10-24 for work performed on 7/15, Lump complete as specified Sum 0 1.00 1.00 $2,485.00 $2,485.00 20001 Additional equipment, labor,and materials to cut down 12"invert in manhole 10-20 and move gas main conflict on 7/17,complete Lump as specified Sum 0 1.00 1.00 $1,725.00 $1,725.00 20002 Additonal crew time to remove unmarked abandoned gas main in Main St.and install inlet for work performed on 7/18, complete as specified Hours 0 0.50 0.50 $1,150.00 $575.00 Page 8 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 20003 Additional equipment, labor,&materials to locate existing gas main at outfall on New York Avenue,relay pipe on new alignment, and remove rocks and piles on new alignment,for work performed on 6/24 through 6/26,complete as sepcified Lump Sum 0 1.00 1.00 $18,116.00 $18,116.00 20004 Additional equipment, labor,&materials to tight sheet existing storm outfalls for Street Department Televising at Osceola, Michigan,and Knapp,complete as Lump specified Sum 0 1.00 1.00 $28,405.00 $28,405.00 20005 Additional,equipment, labor,&materials to reset inlet N-89 and relay pipe, which had incorrect elevation on plans,for work performed on 7/9, Lump complete as specified Sum 0 1.00 1.00 $2,875.00 $2,875.00 20006 Additional equipment, labor,&materials to repair storm sewer that was bored through by WPS in front of 2316 Jefferson Street,complete as Lump specified Sum 0 1.00 1.00 $260.00 $260.00 20007 Down Crew time to wait for WPS to remove existing gas main that was in conflict with proposed storm sewer on 8/21, complete as specified Hours 0 2.00 2.00 $1,150.00 $2,300.00 20008 Additional equipment, labor,&materials to excavate for MH 10-36. Existing storm sewer was not located were staked, filled in hole on 9/53, Lump complete as specified Sum 0 1.00 1.00 $2,670.00 $2,670.00 Page 9 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 20009 Additional equipment, labor,&materials reset MH 10-36, remove concrete around encased existing storm sewer in vacated Indiana, plug hole in inlet 10-77,and core new hole into inlet 10-78 for new alignment,for work performed on 9/4, Lump complete as specified Sum 0 1.00 1.00 $3,000.00 $3,000.00 20010 Additional labor and materials to pour concrete walls in new inlets 10-75 through 10-80 to support special casting,complete Lump as specified Sum 0 1.00 1.00 $480.00 $480.00 20011 Additional equipment, • labor, &materials to cap storm lateral for 1446 New York with small crew per City's request,complete as Lump specified Sum 0 1.00 1.00 $1,000.00 $1,000.00 20012 Additional equipment, labor,&materials to modify inlet N-68 for new pipe run to existing ditch not shown on plans, complete as Lump specified Sum 0 1.00 1.00 $1,150.00 $1,150.00 20013 Additional equipment, labor,&materials to reset inlet 10-73 which was incorrecty staked,complete Lump as specifed Sum 0 1.00 1.00 $2,485.00 $2,485.00 20014 Furnish&install 12" endwall,complete as specified Each 0 1.00 1.00 $475.00 $475.00 20015 Penalty for Trucks off the designated truck route on June 12(2),June 13,& July 22,2013,per SP-4 Each 0 -4.00 -4.00 $200.00 ($800.00) 20016 Penalties for failure to deliver televising report prior to paving,per Section 2700.3.3 of the 2013 Linear Standard Specifications Feet 0 -1,895.50 -1,895.50 $2.00 ($3,791.00) ADDITIONAL WORK:C.O.#1 -(ITEMS 2066-20016)-SUB-TOTAL $69,076.00 ($4,591.00) NET INCREASE TO: SECTION II $72,897.54 SECTION III-SANITARY SEWER INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3000 Furnish and install 8" sanitary sewer relay, Linear complete as specified Feet 1,770 1,807.30 37.30 $75.00 $2,797.50 Page 10 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3002 Furnish and install 10" sanitary sewer relay, Linear complete as specified Feet 2,180 2,185.70 5.70 $70.00 $399.00 3004 Furnish and install 12" sanitary sewer relay, Linear complete as specified Feet 450 466.70 16.70 $85.00 $1,419.50 3020 Furnish and install 48" sanitary sewer relay, Linear complete as specified Feet 10 10.00 $500.00 3060 Furnish and install 8" sanitary sewer drop, Vertical complete as specified Feet 5 4.15 -0.85 $400.00 ($340.00) 3062 Furnish and install 10" sanitary sewer drop, Vertical complete as specified Feet 16 16.44 0.44 $420.00 $184.80 3064 Furnish and install 12" sanitary sewer drop, Vertical complete as specified Feet 17 16.71 -0.29 $440.00 ($127.60) 3100 Furnish and install standard sanitary manhole (4'diameter),complete as Vertical specified Feet 245 270.86 25.86 $210.00 $5,430.60 3102 Furnish and install standard sanitary manhole (5'diameter),complete as Vertical specified Feet 15 14.08 -0.92 $350.00 ($322.00) 3104 Furnish and install standard sanitary manhole (6'diameter),complete as Vertical specified Feet 13 12.58 -0.42 $500.00 ($210.00) 3114 Furnish and install external manhole chimney seal, complete as specified Each 23 29.00 6.00 $450.00 $2,700.00 3116 Furnish and install external manhole chimney seal extension,complete as specified Each 3 3.00 $450.00 3118 Furnish and install internal manhole chimney seal, complete as specified Each 3 0.00 -3.00 $300.00 ($900.00) 3122 Reconstruct sanitary sewer manhole(4'diameter), complete as specified Vertical Feet 7 10.00 3.00 $150.00 $450.00 3210 Furnish and install 8"x 6" factory wyes or tees, complete as specified Each 19 15.00 -4.00 $100.00 ($400.00) 3212 Furnish and install 10"x 6" factory wyes or tees, complete as specified Each 35 36.00 1.00 $160.00 $160.00 3214 Furnish and install 12"x 6" factory wyes or tees, complete as specified Each 3 3.00 $220.00 3230 Furnish and install 4" sanitary laterals new, Linear complete as specified Feet 60 59.50 -0.50 $60.00 ($30.00) 3234 Furnish and install 4"/6" sanitary lateral relay, Linear complete as specified Feet 1,650 1,445.20 -204.80 $60.00 ($12,288.00) Page 11 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3235 Furnish and install 4"/6" sanitary riser relay, Linear complete as specified Feet 130 82.70 -47.30 $60.00 ($2,838.00) 3236 Furnish and install sanitary lateral marker balls, complete as specified Each 114 105.00 -9.00 $20.00 ($180.00) 3238 Furnish and install clay dams,complete as specified Each 57 51.00 -6.00 $88.00 ($528.00) 3300 Furnish and install connections to existing 8" mains,complete as specified Each 5 7.00 2.00 $500.00 $1,000.00 3302 Furnish and install connections to existing 10" mains,complete as specified Each 2 3.00 1.00 $525.00 $525.00 3304 Furnish and install connections to existing 12" mains,complete as specified Each 2 2.00 $550.00 3308 Furnish and install connections to existing 18" mains,complete as specified Each 1 1.00 $700.00 3310 Furnish and install connections to existing 21" mains,complete as specified Each 2 1.00 -1.00 $1,400.00 ($1,400.00) 3320 Furnish and install connections to existing 48" mains,complete as specified Each 2 2.00 $5,000.00, 3330 Furnish and install concrete collars,complete as specified Each 1 2.00 1.00 $1,000.00 $1,000.00 3332 Core into existing manhole, complete as specified Each 4 2.00 -2.00 $800.00 ($1,600.00) 3402 Furnish and install 8"open cut casing pipes, complete Linear as specified Feet 160 109.00 -51.00 $80.00 ($4,080.00) 3404 Furnish and install 10" open cut casing pipes, Linear complete as specified Feet 20 33.00 13.00 $80.00 $1,040.00 3406 Furnish and install 12" open cut casing pipes, Linear complete as specified Feet 20 20.00 $100.00 3408 Furnish and install 16" open cut casing pipes, Linear complete as specified Feet 20 20.00 $120.00 3600 Rock excavation, complete Cubic as specified Yards 50 0.00 -50.00 $0.01 ($0.50) 3700 Televise sanitary sewer, Linear complete as specified Feet 4,410 4,459.70 49.70 $1.30 $64.61 3800 Abandon sanitary manholes,complete as specified Each 4 4.00 $400.00 Page 12 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3801 Abandon 6"sanitary sewer, complete as specified Linear Feet 30 30.00 $3.00 3802 Abandon 8"sanitary sewer, complete as specified Linear Feet 1,250 750.00 -500.00 $3.00 ($1,500.00) 3806 Abandon 12"sanitary sewer,complete as Linear specified Feet 330 275.00 -55.00 $12.00 ($660.00) 3810 Abandon 18"sanitary sewer,complete as Linear specified Feet 640 580.00 -60.00 $15.00 ($900.00) 3852 Remove sanitary sewer manhole,complete as specified Each 4 3.00 -1.00 $500.00 ($500.00) 3900 Remove sanitary sewer, Linear complete as specified Feet 480 500.00 20.00 $15.00 $300.00 3902 Sanitary sewer utility line opening,complete as specified Each 5 9.00 4.00 $300.00 $1,200.00 3990 Excavation special (sanitary),complete as specified Tons 200 0.00 -200.00 $12.00 ($2,400.00) 3992 Bentonite slurry dam (sanitary),complete as specified Each 5 5.00 $600.00 3994 Over-excavation(sanitary), Cubic complete as specified Yards 100 0.00 -100.00 $12.00 ($1,200.00) SECTION III-(BID ITEMS 3000-3994)-SUB-TOTALS $18,671.01 ($32,404.10) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION III ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 30000 Additional equipment, labor,&materials to remove concrete around encased pipe at CO-18, Lump complete as specified Sum 0.00 1.00 1.00 $1,725.00 $1,725.00 30001 Additional crew time and materials to excavate for new MH at Goss Ct when it was discovered that existing lateral was 8"not Lump 6", complete as specified Sum 0.00 1.00 1.00 $5,670.00 $5,670.00 30002 Additional small crew time to excavate and abandon lateral for 1009 Main Street,once lots were combined,complete as specified Hours 0.00 1.50 1.50 $1,000.00 $1,500.00 Page 13 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 30003 Additional small crew time to excavate and abandon lateral and pipe for 929 Main Street,once City relocated lateral location, complete as specified Hours 0.00 1.00 1.00 $1,000.00 $1,000.00 30004 Additional crew time and materials to excavate for new MH for United Methodist Church,when it was discovered that existing lateral was 8"not Lump 6",complete as specified Sum 0.00 1.00 1.00 $7,970.00 $7,970.00 30005 Additional equipment, labor, &materials to excavate sanitary sewer to verify is railroad ditches on Broad street are connected to existing sanitary sewer, complete as specified Lump Sum 0.00 1.00 1.00 $9,019.70 $9,019.70 30006 Additional equipment, labor,&materials to install new lateral at relocated located for 929 Main Street. Main line needed to be cut and have new wye installed with hard couplings,for work performed on 8/28, Lump complete as specified Sum 0.00 1.00 1.00 $1,725.00 $1,725.00 30007 Penalties for failure to deliver televising report prior to paving, per Section 3700.5.3.3 of the 2013 Linear Standard Specifications Feet _ 0.00 804.00 804.00 $2.00 $1,608.00 ADDITIONAL WORK: C.O.#1 -(ITEMS 30000-30007)-SUB-TOTAL $30,217.70 $0.00 NET INCREASE TO: SECTION III $16,484.61 SECTION IV-WATER MAIN ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4000 Furnish and install 4" ductile iron water main with polywrap relay,complete Linear as specified Feet 35 35.00 $68.00 4002 Furnish and install 6" ductile iron water main with polywrap relay,complete Linear as specified Feet 375 388.00 13.00 $62.00 $806.00 4004 Furnish and install 8" ductile iron water main with polywrap relay,complete Linear as specified Feet 4,025 4,104.00 79.00 $67.00 $5,293.00 Page 14 of 18 • CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 4006 Furnish and install 10" ductile iron water main with polywrap relay,complete Linear as specified Feet 225 240.50 15.50 $76.00 $1,178.00 4008 Furnish and install 12" ductile iron water main with polywrap relay,complete Linear as specified Feet 250 244.50 -5.50 $81.00 ($445.50) 4036 Furnish and install 1"water service relay,complete as Linear specified Feet 1,305 1,220.50 -84.50 $55.00 ($4,647.50) 4037 Furnish and install 1%" water service relay, Linear complete as specified Feet 40 32.00 -8.00 $56.00 ($448.00) 4040 Furnish and install 2"water service relay,complete as Linear specified Feet 40 63.00 23.00 $63.00 $1,449.00 4042 Furnish and install 1"water service new,complete as Linear specified Feet 60 69.00 9.00 $55.00 $495.00 4048 Furnish and install 1" corporation and stop box, complete as specified Each 49 42.00 -7.00 $265.00 ($1,855.00) 4050 Furnish and install 1-1/4" corporation and stop box, complete as specified Each 2 2.00 $500.00 4053 Furnish and install 2" corporation and stop box, complete as specified Each 1 2.00 1.00 $850.00 $850.00 4055 Furnish and install water service clay dams, complete as specified Each 52 46.00 -6.00 $30.00 ($180.00) 4056 Furnish and install connections to existing 4" water main,complete as specified Each 1 1.00 $550.00 4058 Furnish and install connections to existing 6" water main,complete as specified Each 8 11.00 3.00 $600.00 $1,800.00 4060 Furnish and install connections to existing 8" water main,complete as specified Each 2 2.00 $650.00 4062 Furnish and install connections to existing 10" water main,complete as specified Each 5 6.00 1.00 $1,000.00 $1,000.00 4064 Furnish and install connections to existing 12" water main,complete as specified Each 3 2.00 -1.00 $1,100.00 ($1,100.00) 4110 Furnish and install 8"x 6" tee,complete as specified Each 12 12.00 $380.00 4111 Furnish and install 8"x 8" tee,complete as specified Each 6 6.00 $500.00 4118 Furnish and install 10"x 4" tee,complete as specified Each 1 1.00 $575.00 Page 15 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 4128 Furnish and install 12"x 6" tee,complete as specified Each 1 2.00 1.00 $625.00 $625.00 4190 Furnish and install 8"x 10" cross,complete as specified Each 2 2.00 $700.00 4191 Furnish and install 8"x 12" cross,complete as specified Each 2 2.00 $775.00 4219 Furnish and install 8"11'/4 bend, complete as specified Each 2 2.00 $275.00 4228 Furnish and install 8"22'/2° bend,complete as specified Each 4 6.00 2.00 $285.00 $570.00 4235 Furnish and install 4"45° bend,complete as specified Each 2 2.00 $180.00 4236 Furnish and install 6"45° bend,complete as specified Each 18 35.00 17.00 $230.00 $3,910.00 4237 Furnish and install 8"45° bend,complete as specified Each 12 11.00 -1.00 $300.00 ($300.00) 4238 Furnish and install 10"45° bend,complete as specified Each 10 14.00 4.00 $380.00 $1,520.00 4239 Furnish and install 12"45° bend,complete as specified Each 10 10.00 $550.00 4255 Furnish and install 8"cap, complete as specified Each 1 1.00 $175.00 4264 Furnish and install 8"x 6" reducer, complete as specified Each 7 8.00 1.00 $255.00 $255.00 4271 Furnish and install 12"x 10"reducer,complete as specified Each 1 1.00 $420.00 4356 Cut and cap existing 10" water main,complete as specified Each 2 2.00 $300.00 4400 Furnish and install 4"gate valve,complete as specified Each 1 1.00 $925.00 4401 Furnish and install 6"gate valve,complete as specified Each 13 15.00 2.00 $1,100.00 $2,200.00 4402 Furnish and install 8"gate valve, complete as specified Each 25 26.00 1.00 $1,400.00 $1,400.00 4403 Furnish and install 10"gate valve,complete as specified Each 4 4.00 $2,100.00 4404 Furnish and install 12"gate valve,complete as specified Each 4 5.00 1.00 $2,400.00 $2,400.00 4419 Furnish and install 6"x 6" tapping valve and sleeve, complete as specified Each 1 1.00 $2,300.00 Page 16 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 4500 Furnish and install hydrant, complete as specified Each 11 12.00 1.00 $3,200.00 $3,200.00 4502 Furnish and install gradelok for hydrant branches,complete as specified Each 11 0.00 -11.00 $0.01 ($0.11) 4712 Furnish and install 2"steel casing pipe,complete as Linear specified Feet 140 100.00 -40.00 $40.00 ($1,600.00) 4724 Furnish and install 16" steel casing pipe,complete Linear as specified Feet 40 38.00 -2.00 $120.00 ($240.00) 4728 Furnish and install 20" steel casing pipe,complete Linear as specified Feet 40 34.00 -6.00 $120.00 ($720.00) 4900 Abandon water main on West New York Avenue, Lump complete as specified Sum 1 1.00 $2,500.00 4902 Abandon water main on East and West 10th Avenue,complete as Lump specified Sum 1 1.00 $2,500.00 4920 Remove water main, Linear complete as specified Feet 950 700.00 -250.00 $15.00 ($3,750.00) 4950 Water main utility line opening,complete as specified Each 2 2.00 $300.00 4990 Excavation special(water), complete as specified Tons 200 0.00 -200.00 $12.00 ($2,400.00) 4992 Bentonite slurry dam (water),complete as specified Each 5 1.00 -4.00 $600.00 ($2,400.00) 4994 Over-excavation(water), Cubic complete as specified Yards 100 40.00 -60.00 $12.00 ($720.00) SECTION IV-(BID ITEMS 4000-4994)-SUB-TOTALS $28,951.00 ($20,806.11) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION IV ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 40000 Additional equipment, labor, &materials to removed abandoned gas main that was in conflict with tapping valve and sleeve in the intersection of W. 10th Avenue and Oregon Street,for work performed on 6/26, Lump complete as specified Sum 0.00 1.00 _ 1.00 $1,150.00 $1,150.00 Page 17 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 40001 Additional equipment, labor,&materials to remove existing concrete vault and fill with CABC on East 10th Avenue,for work performed on 7/24, Lump complete as specified Sum 0.00 1.00 1.00 $2,095.00 $2,095.00 40002 Additional equipment, labor,&materials to install new service at relocated location for 929 Main Street. Old Service needed to be abandoned and new service needed with additional bends,for work performed on 8/28, Lump complete as specified Sum 0.00 1.00 1.00 $1,725.00 $1,725.00 ADDITIONAL WORK: C.O.#1 (ITEMS 40000-40002)-SUB-TOTAL $4,970.00 $0.00 NET INCREASE TO: SECTION IV $13,114.89 NET INCREASE TO SECTIONS I,II,III,IV $303,793.70 NET DECREASE TO SECTIONS I,II, III,IV ($157,179.40) NET INCREASE TO CONTRACT: $146,614.30 Page 18 of 18