Loading...
HomeMy WebLinkAboutPW CNT 12-23/CHG OR 1/Straight Line Fence DEPARTMENT OF PUBLIC WORKS — 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 OJHKOIH Fax(920)236-5068 ON THE WATER January 16, 2014 Jon Kulas Straight Line Fence LLC 8545 County Road C Wittenberg, WI 54499 Re: Change Order No. 1 (Final) Contract 12-23 Dear Mr. Kulas: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Straight Line Fence LLC regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, David C. Patek Director of Public Works DCP/tIt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, City Attorney (w/copy) Tara Wendt, Assistant Finance Director(w/copy) File (w/original) I:\Engineering\12-23 Fence Contract-James Rd Area Det Basin\Project_Information\Contract Info\Change Orders\12-23 Page 1 of 1 Executed CO#1 Ltr 1-16-14.docx TO: Straight Line Fence LLC CHANGE ORDER# 1 FINAL 8545 County Road C DATED: NOVEMBER 14, 2013 Wittenberg, WI 54499 Your present contract with the City of Oshkosh, Contract No.12-23, awarded July 10, 2012, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - STORM SEWER 3,397.00 NET INCREASE TO CONTRACT $3,397.00 Section I (Storm Sewer) TOTAL Bid Total $15,970.00 $15,970.00 C.O. #1 $3,397.00 $3,397.00 Contract Total $19,367.00 $19,367.00 CITY OF OSHKOSH BY: Recommended: City Marla.- ,` .0..:d - ..A7st ic _ _! 7.11111 Ji Director of Public Works City Clerk Ap roved and c pted: )f\/(4 K\ Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. tdefai j pt roller Approved ao form: — t, •• A .A. Ct_.1ill City Attu ey CONTRACT:12-23 CHANGE ORDER#1 FINAL SECTION I-STORM SEWER ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET INCREASE NET DECREASE UNIT PRICE INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES CONTRACT PRICE CONTRACT PRICE 2000 Mobilization,complete as specified Lump Sum 1 1 $ 2,050.00 2951 Fence,Woven Wire 4.5 ft,complete as specified Linear Feet 3450 3695 245 $ 3.60 $ 882.00 2952 Pipe Gate,24 ft dual opening,complete as specifed Each 1 1 $ 1,500.00 Section I-(BID ITEMS 2000-2953)-SUB TOTALS $ 882.00 ADDITIONAL WORK REQUIRED:C.O.#1-SECTION I ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET INCREASE NET DECREASE UNIT PRICE INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES CONTRACT PRICE CONTRACT PRICE 20000 Mobilization August 2013 Lump Sum 0 1 1 $ 2,050.00 $ 2,050.00 20001 Gate Restocking Fee Lump Sum 0 1 1 $ 200.00 $ 200.00 20002 Line Post Replacement Each 0 1 1 $ 15.00 $ 15.00 20003 45 Degree Corner Each 0 2 2 $ 125.00 $ 250.00 ADDITIONAL WORK;C.O.#1-(ITEMS 20000-20003)-SUB TOTALS $ 2,515.00 NET INCREASE TO SECTION I $ 3,397.00 NET INCREASE TO CONTRACT: $ 3,397.00 CONTRACT: 12-23 CHANGE ORDER#1 FINAL SECTION I-STORM SEWER INCREASE IN DECREASE ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 2000 Mobilization, complete as Lump specified Sum 1.00 1.00 $2,050.00 2951 Fence,Woven Wire 4.5 ft, Linear complete as specified Feet 3,450.00 3,695.00 245.00 $3.60 $882.00 Pipe Gate,24 ft dual 2952 opening, complete as Each specifed 1.00 1.00 $1,500.00 SECTION I-(BID ITEMS 2000-2952)-SUB-TOTALS $882.00 $0.00 ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I INCREASE IN DECREASE ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE CONTRACT PRICE 20000 Mobilization August 2013 Lump Sum 0.00 1.00 1.00 $2,050.00 $2,050.00 20001 Gate Restocking Fee Lump Sum 0.00 1.00 1.00 _ $200.00 $200.00 20002 Line Post Replacement Each 0.00 1.00 1.00 $15.00 $15.00 20003 45-degree Corner Each 0.00 2.00 2.00 $125.00 $250.00 ADDITIONAL WORK: C.O.#1 -(ITEMS 20000-20003)-SUB-TOTAL $2,515.00 $0.00 NET INCREASE TO: SECTION I $3,397.00 NET INCREASE TO SECTION I $3,397.00 NET DECREASE TO SECTION I $0.00 NET INCREASE TO CONTRACT: $3,397.00 Page 2 of 2