HomeMy WebLinkAbout18. 14-14 JANUARY 14, 2014 14-14 RESOLUTION (CARRIED___6-0___LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 13-04 WITH CARL BOWERS & SONS CONSTRUCTION CO. INC. FOR VARIOUS CONCRETE PAVING & UTILITY PROJECTS – NORTH & SOUTH CENTRAL AREAS (+$146,614.30) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: CARL BOWERS & SONS CONSTRUCTION CO. N1844 Maloney Road Kaukauna, WI 54130 Net Increase to contract: $146,614.30 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 311-0410-7480-00000 Sidewalk Construction Fund 315-0410-7480-00000 Street Improvement Fund Expenditures 317-0410-7480-03301 Special Assessments Fund – Streets 317-0410-7480-03302 Special Assessments Fund – Sewer 317-0410-7480-03303 Special Assessments Fund – Water 317-0410-7480-03304 Special Assessments Fund – Sidewalks 317-0410-7480-03305 Special Assessments Fund – Storm Water 541-1810-1799-00000 Water Utility Construction Work in Progress 551-1910-1799-00000 Sewer Utility Construction Work in Progress 561-2010-1799-00000 Storm Water Utility Construction Work in Progress 4101. OJHKOJH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: January 9, 2014 RE: Change Order No. 1 for Public Works Contract No. 13-04 / Paving, Sidewalk, Driveway, & Utilities / Second Local Street Concrete Paving Program / Carl Bowers & Sons Construction Company, Inc. (+$146,614.30) BACKGROUND Change Order No. 1 for Contract 13-04 is scheduled for consideration by the Common Council at the January 14, 2014 meeting. The contract was originally awarded to Carl Bowers & Sons Construction Company, Inc. in April of 2013. This is the final change order. Quantities have been adjusted to match field conditions and additional services were provided. ANALYSIS Following is a summary of the significant changes to each section of the Capital Improvement Program (CIP). • Concrete Paving — Additional labor, materials, & equipment were required to remove organic material and sawdust (Bid Item #1200) on both West and East 10th Avenue and replace with new gravel base (Bid Item #1340). Additional quantity of 8" HES Concrete Pavement was added to facilitate access for businesses on East 10th Avenue (Bid Item#1313). • Storm Sewer — Additional labor, materials, & equipment were required to relocate the outfall on New York Avenue to avoid an existing gas main under the river (Bid Item #20003). Additional work was performed to tight sheet existing storm outfalls to allow the Street Department to televise the storm sewer at various locations throughout the City (Bid Item#20004). • Sanitary Sewer— Additional labor, materials, & equipment were required to install additional manholes and pipe when laterals were determined to be 8", not 6" (Bid Items #3000, #3100, #3300, #30001, and #30004). Carl Bowers & Sons was hired to verify railroad ditches were not connected to the sanitary sewer on Broad Street(Bid Item#30005). • Water Main — Additional labor, materials, & equipment were required to remove abandoned 10th main that was in conflict with water main (Bid Item #40000), to remove concrete vault on East 10t Avenue and fill with CABC (Bid Item #40001), and to install water service at new location (Bid Item#40002). FISCAL IMPACT Contract Section Change Order Amount New Contract Total CIP Budget Amount Concrete Paving $44,117.26 $1,089,272.80 $1,317,300 Storm Sewer $72,897.54 $1,191,900.05 $1,830,100 Sanitary Sewer $16,484.61 $647,174.11 $767,200 Water Main $13,114.89 $638,105.00 $702,700 Total $146,614.30_ $3,566,451.96 $4,617,300 Adequate funds are available in the relating sections of the 2013 Capital Improvements Budget. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 13-04 in the amount of +$146,614.30 to Carl Bowers & Sons Construction Company, Inc. Approved: Mark A. Rohloff City Manager SMG/tlt I:\Engineering\13-04 Conc Paving&Util\Project_Information\CorrespondencelMemo\13-04 CO#1 Memo_1-9-14.docx TO: Carl Bowers & Sonsc Const. Co., Inc. CHANGE ORDER # 1 FINAL N1844 Maloney Rd. DATED: DECEMBER 13, 2013 . Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No. 13-04, awarded Apirl 9, 2013, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING 44,117.26 NET INCREASE TO: SECTION II - STORM SEWER 72,897.54 NET INCREASE TO: SECTION III - SANITARY SEWER 16,484.61 NET INCREASE TO: SECTION IV - WATER MAIN 13,114.89 NET INCREASE TO CONTRACT $146,614.30 Section I Section II Section III Section IV (Paving) (Storm) (Sanitary) (Water) Totals Bid Total $1,045,155.54 $1,119,002.51 $630,689.50 $624,990.11 $3,419,837.66 C.O. #1 S44,117.26 $72,897.54 $16,484.61 $13,114.89 $146,614.30 Contract Total $1,089,272.80 $1,191,900.05 $647,174.11 $638,105.00 $3,566,451.96 CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works City Clerk Approved and accepted: ontractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 13-04 CHANGE ORDER#1 FINAL SECTION I-PAVING INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 1011 Clearing,complete as Inch $12.00 $1,214.40 specified Diameter 129 230.20 101.20 $ 1021 Grubbing,complete as Inch • specified Diameter 129 230.20 101.20 $12.00 $1,214.40 • 1100 Removing pavement, Square complete as specified Yards 6,975 7,087.50 112.50 $2.00 $225.00 1101 Remove underground scale pit,complete as Lump $2,500.00 specified Sum 1 • 1.00 1102 Remove rails;complete as Linear . specified Feet 574 75.00 -499.00 $3.00 ($1,497.00) 1103 Remove and haul railroad ties,complete as specified • Tons 20 0.00 -20.00 • $30.00 ($600.00) . 1104 Reset section monument and re-establish witness monuments,complete as Lump $1,000.00 specified Sum 1 1.00 1120 Removing concrete and asphalt sidewalk and driveway,complete as Square specified Feet 46,400 48,099.50 1,699.50 $0.50 $849.75 1200 Excavation,complete as Cubic • specified Yards 9,060 11,245.70 2,185.70 $8.50 $18,578.45 1220 Excavation special (paving),complete as 972 Op $7.00 specified Tons 972 0.00 ($6,804.00) 1301 7"concrete pavement,5" CABC and grading, Square complete as specified Yards 13,145 12,295.80 -849.20 $28.00 ($23,777.60) 1303 7"concrete pavement - HES, 5"CABC and grading,complete as Square specified Yards 640 654.30 14.30 $32.00 $457.60 1311. 8"concrete pavement . 1=IE-S,6"CABC and grading,complete as Square • . specified Yards 865 0.00 -865,00 $32.50 . ($28,112.50) 1313. 8"concrete pavement HES,6"CABC and grading, sppecified complete as Yards 715 1,714.10 999.10 $42.00 $41,962.20- 1315 8"concrete pavement . doweled,HES,6"CABC and grading, complete as Square specified Yards 2,281 2,301.00 20.00 $35.50 $710.00 1340 Crushed aggregate base course,complete as specified Tons 3,450 6,293.60 2,843.60 • $4.00 $11,374.40 1350 Pavement ties,complete as specified Each 125 298.00 173.00 $7.00 $1,211.00 1360 Adjust manholes and inlets, complete as specified Each 150 149.00 -1.00 $150.00 ($150.00) 1370A Terrace work on West New York Avenue,complete as Lump $16,500.00 specified Sum 1 1.00 Page 2of18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM •NUMBER DESCRIPTION BID INSTALLED NET INCREASE IN DECREASE IN ® QUANTITY QUANTITIES INCREASE DECREASE UNIT 13706 PRICE CONTRACT CONTRACT Terrace work on 101h PRICE PRICE Avenue, complete as Lump s.ecified Sum 1410 12"radius curb with 6" 1.00 $9,500.00 nilli CABC and grading, Linear com.lete as s.ecified Feet 1,070 1440 30"curb and gutter,7"with 1'91.10 21.10 El $6.00 $126.60 5 CABC and grading, complete as specified Linear Feet 890 993.90 103.90 I 36"mountable curb and $26.00 $2,701.40 gutter HES,8",with 6" CABC and grading, Linear complete as specified Feet 1,000 1460 Sidewalk curb, complete as Linear 986.40 -13.60 • $12.00 ($163.20) specified Feet 140 1500 4"concrete sidewalk with 48.00 111111 -92.00 $17.00 3"CABC and grading, Square ($1,564.00) coplete as s.ecified q 1510 6"concrete Feet 16,110 19,038.20 •2,928.20 . m 61.1 $3.40 $9,955.88 sidewalk/driveway/ramp with 3"CABC and grading, complete as specified Square Feet 16,180 17,472.60 1,292.60 1520 8"concrete $3.70 $4,782.62 sidewalk/driveway/ramp with 3"CABC and grading, complete as specified Square Feet 2,500 921.20 Ia'concrete -1,578.80 $4.05 sidewalk/driveway/ramp ($6,394.14) (HES)with 3"CABC and grading, complete as Square specified . Feet 2 280 1530 6"concrete step, complete Square ' 2,582.00 302.00 . • _� $4.15 $1,253.30 as s•ecified Feet 1540 Curb ramp detectable 61.50 28.50 MI warning field(natural/non- painted), $719.63 complete as Square • s•ecified Feet 1550 No.4 reinforcing rods- 420 392.00 28.00_ $24.25 ($679.00) deformed,epoxy-coated,p xy-coated, Linear com•lete as s•ecified Feet 3,540 4,400.00 860.00 $0.70 11110 . 1560 Drilled No.4 sidewalk tie $602.00 bars,deformed,epoxy- coated, complete as • specified Each 370.00 1600 Furnish and install tree, MEM 227.00 • com•lete is as ng pavement, __ ($299.64) 1700 Sawin existin 2.00 $250.00_� Sawing.existing pavement, complete as specified Linear Feet 1,634.50 1710 Sawing concrete pavement -8.50 $1.00 IN full depth, complete as Linear ($8.50) s•ecified Feet 695 Mal - 1900 Tack coat, complete as 713.50 18.50 s•ecified Gallons 100 1910 5"asphaltic transition with 7.40 -92.60 $13.50 10"CABC and grading, ($1,250.10) complete as specified Square Yards 2,460 2,364.30 -95.70 $28.00 Page 3 of 18 ($2,679.60) CONTRACT:.13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM BID INSTALLED NET NET UNIT CONTRACT CONTRACT DESCRIPTION UN17 QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE NUMBER 1911 4"asphaltic transition with 10"CABC and grading, complete as specified Square Yards 330 310.20 -19.80 $32.00 ($633.60) 1915 5"asphaltic surface,with 6" Square $29.00 $5,953.70 CABC and grading Yards 1,075 1,280.30 205.30 1916 4"asphaltic surface with 6" . CABC and grading, Square . 33.00 $350790 complete as specified Yards 505 611.30 106.30 $33.00 $3,507.90 SECTION I-(BID ITEMS 1011-1916)-SUB-TOTALS $107,432.61 ($74,612.88) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I . • INCREASE IN DECREASE IN ITEM BID 'INSTALLED NET . NET UNIT CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE • 10000 Furnish and install 6"HES . concrete sidewalk and driveway on W. New York Ave.and on W. 10th Ave. (difference in bid price for • 6"concrete sidewalk and driveway),complete as Square $0.35 $1,100.37 specified Feet 0.00 3,143.90 3,143.90 10001 Install additional concrete to provide a 12"thickened section along the street side edge of 8"concrete driveway aprons on E. 10th Ave,complete as specified Linear 8.80 $2 730.64 • Feet 0.00 310.30 310.30 $ 10002 Remove and replace 21 linear feet of severly tipped • 18"retaining wall adjacent to new sidewalk work at 1207 High Ave. (W. New York Ave.side)(cost to be assessed back to property owner),complete as Lump $880.00 $880.00 specified Sum 0.00 1.00 1.00 $ 10003 Re-set110 Linear Feet of • landscape block adjacent to excavation below sub- grade work in front of Alro Steel,43 E. 10th Ave., Lump $2,540.00 $2,540.00 complete as specified Sum 0.00 1.00 1.00 $ 10004 Profile saw cut curb at 1415 W.New York Ave., Lump $425.00 $425.00 complete as specified Sum 0.00 1.00 1.00 10005 Provide terrace restoration work beyond project limits for Wisconsin Public Service new gas main work on W.New York Ave.and on W. 10th Ave.(WPS to be invoiced full amount), complete as specified Lump Sum 0.00 1.00 1.00 $1,162.92 $1,162.92 Page 4 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM NUMBER DESCRIPTION BID INSTALLED NET NET INCREASE IN DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 10006 Apply joint sealer between PRICE PRICE new sidewalk and building at the southeast corner of W. 10th Avenue and Oregon Street,complete Lump as specified Sum 0.00 10007 Furnish and install steel 1.00 1.00 $400.00 $400.00 plates on shallow manholes and inlets, complete as specified 0.00 10008 Penalty for Trucks off the • 2.00 2.00 $604.30 $1,208.60 designated truck route on- Jul 17, 2013, .er SP-4 0.00 10009 Additional cost for -2.00 2.00 $200.00 ($400.00) removing underground, scale pit beyond plan limits at Sadoff Iron&Metal Company 36 E. 10th Lump Avenue Sum 0.00 1.00 1.00 $1,250.00 $1,250.00 ADDITIONAL WORK: C.O.#1-(ITEMS 10001-10009)-SUB-TOTAL $11,697.53 ($400.00) NET INCREASE TO: SECTION I $44,117.26 SECTION II-STORM SEWER , ITEM ® NUMBER DESCRIPTION BID INSTALLED NET NET INCREASE IN DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE • 2006 Clear trees,complete as Lump specified • Sum 1 1.00 2008 Clear shrubs,complete as Lump $500.00 specified Sum 1 1.00 • 2014 Storm sewer utility line $500.00 opening, complete as specified . 2034 Furnish and install 10" 4.00 1.00 $300.00 ($300.00) . storm sewer,complete as Linear specified Feet 305 305.50 0.50 2036 Furnish and install 12" $43.00 $21.50 storm sewer,complete as Linear specified Feet 1,214.60 89.60 2038 Furnish and install 12" $44.00 $3,942.40 RCP Class III storm sewer, complete as specified Linear Feet 60 62.20 2.20 2042 Furnish and install 15" $50.00 $110.00 El storm sewer, complete as Linear specified Feet 140 208.60 68.60 2048 Furnish and install 18" $51.00 $3,498.60 storm sewer,complete as Linear specified Feet 756.00 2054 Furnish and install 21" 41.00 $52.00 $2,132.00 storm sewer,complete as Linear specified Feet 190 166.80 2060 Furnish and install 24" 23.20 $55.00 ($1,276.00) storm sewer,complete as Linear specified Feet 630 659.10 29.10 $56.00 $1,629.60 Page 5 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2078 Furnish and install 36" storm sewer,complete as Linear Feet 15 0.00 -15.00 $90.00 ($1,350.00) 2108 Furnish and install 66" storm sewer,complete as Linear specified Feet 1,420 1,427.30 7.30 . $176.00 $1,284.80 2128 Furnish and install 24"x 38"HERCP Class III storm sewer,complete as Linear Feet 800 763.60 -36.40 $78.00 ($2,839.20) 2186 Furnish and install 4'x 8' box culvert storm sewer, Linear -15.60 $341.00 ($5,319.60) complete as specified Feet 750 734.40 2234 Furnish and install 4'.x 8' box culvert storm sewer with manhole or inlet riser, • complete as specified Linear - $341.00 Feet 32 32.00 2280 Furnish and install 6"storm lateral, complete as Linear , specified Feet 1,170 1,197.20 27.20 $30.00 $816.00 2282 Furnish and install 8"storm lateral,complete as Linear. specified Feet 35 89.50 54.50 $42.00 $2,289.00 2284 Furnish and install storm sewer marker balls, g 00 $20.00 ($180.00) complete as specified Each 107 98.00 • 2286 Furnish and install clay dams,complete as 7 00 $30.00 ($210.00) specified Each 54 47.00 2288 Furnish and install lateral inlet, complete as specified Each 38 32.00 -6.00 $350.00 ($2,100.00) 2374 Furnish and install 4'x 8' box culvert end section with joint ties, complete as $4,000.00 specified Each 1 1.00 2532 Furnish and install standard storm manhole(4' diameter),complete as Vertical $285.00 $1,273.95 specified Feet 80 84.47 4.47 $ 2534 Furnish and install standard storm manhole(5' diameter),complete as Vertical specified Feet 28 22.88 -5.12 $350.00 ($1,792.00) 2552 Furnish and install standard storm manhole(8' x 8'box),complete as Vertical specified Feet 104 113.00 9.00 $750.00 $6,750.00 2580 Furnish and install storm junction chamber, $12,000.00 complete as specified Each 1 1.00 2584 Furnish and install standard storm manhole riser(4'diameter), Vertical complete as specified Feet 6 2.94 -3.06 $250.00 ($765.00) 2596A Furnish and install storm manhole N-46,complete $5,000.00 as specified Each 1 1.00 Page 6 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL . •ITEM BID INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 2596B Furnish and install storm PRICE PRICE manhole N-48,complete as specified Each 1 1.00 2612 Furnish and install Type 1 $5,000.00 inlet,complete as specified _ Each 7 8.00 1.00 $1,450.00 $1,450.00 2614 Furnish and install Type 3 inlet(with 18"sump), - complete as specified Each 50 49.00 -1.00 2616 Furnish and install Type 3 $1,400.00 ($1,400.00) inlet,complete as specified Each 19 18.00 -1.00 $1,350.00 2800 Connect to existing storm ($1,350.00) sewer, complete as specified Each 8 4.00 -4.00 •2802 Connectto existing storm $300.00 ($1,200.00) lateral, complete as specified Each 4 6.00 2.00 2806 Connect to existing $100.00 $200.00 manhole,complete as specified Each 1 4.00 3.00. 2808 Connect to existing inlet, $500.00 $1,500.00 complete as specified Each 1 1.00 2820 Abandon 8"-12"storm $500.00 sewer,complete as . Linear • specified Feet 260 260.00 2822 Abandon 15"and larger $4.00 storm sewer,complete as Linear specified Feet 1,555 1,555.00 •2824 Remove 30"and smaller . $13.00 storm sewer, complete as Linear • specified Feet 970 970.00 2826 Remove 33"-60"storm $15.00 • sewer,complete as Linear specified Feet 125 125.00 2830 Abandon storm manholes $35.00 and inlets, complete as specified Each 19 19.00 •2832 Remove storm manholes $350.00 • and inlets, complete as - specified Each 23 23.00 2858 Furnish, install, maintain $350.00 and remove Type D modified inlet protection, complete as specified Each 130 121.00 -9.00 . 2860 Sediment removal-Type $82.00 ($738.00) D modified inlet protection, complete as specified • Each 130 7.00 -123.00 $3.00 2862 Furnish,install, maintain ($369.00) . and remove stone tracking pad, complete as specified Each 1 0.00 -1.00 $0.01 2866 Furnish, install,maintain ($0.01) and remove stone bag, complete as specified Each 50 0.00 -50.00 2868 Furnish, install,maintain $10.00 ($500.00) and remove 12"diameter . sediment logs,complete as Linear specified Feet 60 65.00 5.00 $10.00 $50.00 Page 7 of 18 • CONTRACT: 13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES fNCREASE DECREASE PRICE PRICE PRICE ' 2876 Furnish,install,maintain and remove turbidity barrier,complete as $3,500.00 specified Each 1 1.00 . • 2930 Furnish and install Class I, Type A erosion control mat,complete as specified Square $5.00 Yards 109 109.00 2948 Furnish and install heavy rip-rap with filter fabric, Square complete as specified Yards 15 73.30 58.30 $100.00 $5,830.00• 2960 Rock excavation,complete Cubic -50.00 $0.01 ($0.50) as specified Yards 50 0.00 2990 Excavation special(storm), complete as specified Tons 200 0.00 -200.00 $12.00 ($2,400.00) 2992 Bentonite slurry dam (storm), complete as $600.00 specified Each 5 5.00 2994 Over-excavation(storm), Cubic complete as specified Yards 100 77.00 -23.00 $12.00 ($276.00) SECTION II-(BID ITEMS 2006-2994)-SUB-TOTALS $32,777.85 ($24,365.31) ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION II INCREASE IN DECREASE IN ITEM BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2066 Furnish and install 27." storm sewer,complete as Linear - inear 60.00 $750.00 specified Feet 0 12.50 12.50 $ 2072 Furnish and install 30" storm sewer,compelte as Linear 5.00 5.00 $65.00 $325.00 specified Feet 0 20000 Additional equipment, labor, &materials to cap abondoned storm lateral tapped into the sanitary . sewer&cut down 30" invert in manhole 10-24 for work performed on 7/15, Lump $2,485.00 $2,485.00 complete as specified Sum 0 1.00 1.00 $ 20001 Additional equipment, labor, and materials to cut down 12"invert in manhole • 10-20 and move gas main conflict on 7/17,complete Lump as specified Sum 0 1.00 1.00 $1,725.00 $1,725.00 20002 Additonal crew time to remove unmarked abandoned gas main in Main St. and install inlet for work performed on 7/18, complete as specified • Hours 0 0.50 0.50 $1,150.00 $575.00 Page 8 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM UNIT BID INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 20003 Additional equipment, PRICE PRICE labor, &materials to locate existing gas main at outfall • on New York Avenue,relay pipe on new alignment, and remove rocks and piles on new alignment,for work performed on 6/24 through 6/26, complete as sepcified Lump Sum 0 1.00 1.00 $18 20004 Additional equipment, ,116.00 $18,116.00 • labor, &materials to tight sheet existing storm outfalls for Street Department Televising at Osceola, Michigan,and Knapp, complete as Lump specified Sum 0 1.00 1.00 20005 Additional, equipment, $28,405.00 $28,405.00 labor,&materials to reset inlet N-89 and relay pipe, which had incorrect elevation on plans,for work performed on 7/9, Lump complete as specified Sum 0 1.00 1.00 20006 •Additional equipment, $2,875.00 $2,875.00 • labor,&materials to repair storm sewer that was bored through by WPS in front of 2316 Jefferson Street,complete as Lump . specified Sum 0 1.00 1.00 $ $260.00 $2fi0.00 20007 Down Crew time to wait for WPS to remove existing gas main.that was in conflict with proposed storm sewer on 8/21, • complete as specified Hours 0 20008 Additional equipment, 2.00 2.00 $1,150.00 $2,300.00 labor, &materials to • excavate for MH 10-36. Existing storm sewer was • not located were staked, • filled in hole on 9/53, . Lump • complete as specified Sum 0 1.00 1.00 $2,670.00 $2,670.00 Page 9 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 20009 Additional equipment, labor,&materials reset MH 10-36, remove concrete around encased existing • storm sewer in vacated Indiana,plug hole in inlet 10-77,and core new hole into inlet 10-78 for new . alignment,for work performed on 914; Lump 3,000.00 $3,D00.00 complete as specified Sum 0 1.00 1.00 $ 20010 Additional labor and materials to pour concrete walls in new inlets 10-75 through 10-80 to support special casting,complete Lump as specified Sum 0 1.00 1.00 $480.00 $480.00 • 20011 Additional equipment, labor, &materials to cap storm lateral for 1446 New • . York with small crew per • City's request, complete as Lump $1,000.00 $1,000.00 specified Sum • 0 1.00 1.00 $ i 20012 Additional equipment, labor, &materials to modify inlet N-68 for new pipe run existing ditch not shown . on plans, complete as Lump specified Sum 0 1.00 1.00 $1,150.00 $1,150.00 20013 Additional equipment, labor, &materials to reset • inlet 10-73 which was incorrecty staked,complete Lump as specifed Sum 0 1.00 1.00 $2,485.00 $2,485100 20014 Furnish&install 12" endwall,complete as $475.00 $475.00 specified Each 0 1.00 1.00 $ 20015 Penalty for Trucks off the • designated truck route on June 12(2),June 13,& 4.00 $200.00 • ($800.00) July 22,2013,per SP-4 Each 0 -4.00 20016 Penalties for failure to deliver televising report prior to paving,per Section 2700.3.3 of the 2013 Linear Standard Specifications Feet 0 -1,895.50 -1,895.50 $2.00 ($3,791.00) WORK:C.O.#1 -(ITEMS 2066-20016)-SUB-TOTAL $69,076.00 ($4,591.00) NET INCREASE TO: SECTION II $72,897.54 SECTION III-SANITARY SEWER INCREASE IN DECREASE IN ITEM BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3000 Furnish and install 8" sanitary sewer relay, Linear complete as specified Feet 1,770 1,807.30 37.30 $75.00 $2,797.50 Page 10 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 3002 Furnish and install 10" PRICE PRICE sanitary sewer relay, Linear complete as specified Feet 2,180 2,185.70 5.70 $70.00 $399.00 3004 Furnish and install 12" sanitary sewer relay, Linear complete as specified Feet 450 466.70 16.70 $85.00 $1,419.50 3020 Furnish and install 48" sanitary sewer relay, _ Linear • complete as specified. Feet 10 10.00 $500.00 3060 Furnish and install 8" • sanitary sewer drop, Vertical. complete as specified Feet 5 4.15 -0.85 $400.00 ($340.00) 3062 Furnish and install 10" • sanitary sewer drop, Vertical complete as specified Feet 16 16.44 0.44 $420.00 $184.80 3064 Furnish and install 12" sanitary sewer drop, Vertical • complete as specified Feet 17 16.71 -0.29 $440.00 ($127.60) 3100 Furnish and install standard sanitary manhole (4'diameter), complete as Vertical specified Feet 245 270.86 25.86 $210.00 $5,430.60 3102 Furnish and install standard sanitary manhole (5'diameter),complete as Vertical specified Feet 15 14.08 -0.92 $350.00 3104 Furnish and install ($322.00) standard sanitary manhole (6'diameter),complete as Vertical specified Feet 13 12.58 -0.42 $500.00 ($210.00) 3114 Furnish and install external manhole chimney seal, • complete as specified Each 23 29.00 6.00 $450.00 $2,700.00 • 3116 Furnish and install external manhole chimney seal __ extension, complete as specified Each 3 3.00 $450.00 3118 Furnish and install internal manhole chimney seal, complete as specified Each • 3 0.00 -3.00 $300.00 ($900.00) 3122 Reconstruct sanitary sewer . manhole(4'diameter), complete as specified Vertical Feet 7 10.00 3.00 $150.00 $450.00 3210 Furnish and install 8"x 6" • factory wyes or tees, complete as specified Each 19 15.00 -4.00 $100.00 ($400.00) 3212 Furnish and install 10"x 6" factory wyes or tees, complete as specified Each 35 36.00 1.00 $160.00 $160.00 3214 Furnish and install 12"x 6" factory wyes or tees, complete as specified Each 3 3.00 $220.00 3230 Furnish and install 4" sanitary laterals new, Linear complete as specified Feet 60 59.50 -0.50 $60.00 ($30.00) 3234 Furnish and install 4"/6" • sanitary lateral relay,. Linear complete as specified Feet _ 1,650 1,445.20 -204.80 $60.00 ($12,288.00) Page 11 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER DESCRIPTION QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3235 Furnish and install 476" sanitary riser relay, Linear -47.30 $60.00 ($2,838.00) complete as specified Feet 130 82.70 3236 Furnish and install sanitary lateral marker balls, complete as specified Each 114 105.00 -9.00 $20.00 ($180.00) 3238 Furnish and install clay dams,complete as -6.00 $88.00 ($528.00) • specified Each 57 51.00 3300 Furnish and install connections to existing 8" mains,complete as $500.00 $1,000.00 specified Each 5 7.00 2.00 3302 Furnish and install connections to existing 10" • mains,complete as 3.00 1.00 $525.00 $525.00 specified Each 2 3304 Furnish and install connections to existing 12" mains,complete as 2 00 $550.00 specified Each 2 . 3308 Furnish and install connections to existing 18" • mains,complete as . 1.00 $700.00 specified Each 1 3310 Furnish and install connections to existing 21" mains,complete as -1.00 $1,400.00 ($1,400.00) specified Each 2 1.00 3320 Furnish and install connections to existing 48" mains,complete as 2 00 $5,000.00 specified Each 2 3330 Furnish and install • concrete collars,complete as specified Each 1 2.00 1.00 $1,000.00 $1,000.00 3332 Core into existing manhole, complete as specified Each 4 2.00 -2.00 $800.00 ($1,600.00) 3402 Furnish and install 8"open cut casing pipes,complete Linear -51.00 $80.00 ($4,080.00) as specified Feet 160 109.00 3404 Furnish and install 10" open cut casing pipes, Linear $80.00 $1,040.00 complete as specified Feet 20 33.00 13.00 3406 Furnish and install 12" open cut casing pipes, Linear complete as specified Feet 20 20.00 $100.00 • 3408 Furnish and install 16" open cut casing pipes, Linear complete as specified Feet 20 20.00 $120.00 3600 Rock excavation, complete Cubic -50.00 $0.01 ($0.50) as specified Yards 50 0.00 3700 Televise sanitary sewer, Linear $1 30 $64.61 complete as specified Feet 4,410 4,459.70 49.70 3800 Abandon sanitary manholes,complete as 4 00 $400.00 specified Each 4 - Page 12 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL • ITEM NUMBER DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 3801 Abandon 6"sanitary sewer, PRICE PRICE complete as specified Linear Feet 30 30.00 3802 Abandon 8"sanitary sewer, $3.00 complete as specified Linear Feet 1,250 750.00 3806 Abandon 12"sanitary -500.00 $3.00. ($1,500.00) sewer,complete as Linear specified Feet 330 275.00 3810 Abandon 18"sanitary -55.00 $12.00 ($660.00) • sewer,complete as Linear specified Feet 640 580.00 3852 Remove sanitary sewer -60.00 $15.00 ($900.00) • manhole,complete as specified Each 4 3.00 3900 Remove sanitary sewer; Linear -1.00 $500.00 ($500.00) complete as specified Feet 480 3902 Sanitary sewer utility line 500.00 20.00 $15.00 $300.00 opening,complete as specified Each 5 9.00 3990 Excavation special 4.00 $300.00 $1,200.00 (sanitary), complete as specified Tons 200 0.00 3992 Bentonite slurry dam -200.00 $12.00 ($2,400.00) (sanitary), complete as specified Each 5- 5.00 3994 Over-excavation(sanitary), Cubic $600.00 complete as specified • Yards 100 0.00 -100.00 $12.00 • ($1,200.00) SECTION III-(BID ITEMS 3000-3994)-SUB-TOTALS $18,671.01 ($32,404.10) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION III ITEM I • I RICE QUANTITY BID INSTALLED NET NET UNIT DESCRIPTION INCREASE 7N DECREASE IN NUMBER i UNIT I QUANTITIES INCREASE DECREASE P I I CONTRACT CONTRACT PRICE I PRICE 30000 Additional equipment, labor, &materials to remove concrete around encased pipe at CO-18, Lump complete as specified Sum 0.00 • 1.00 30001 Additional crew time and 1.00 $1,725.00 $1,725.00 materials to excavate for new MH at Goss Ct when it was discovered that • • existing lateral was 8"not Lump 6", complete as specified Sum 0.00 1.00 30002 Additional small crew time 1.00 $5,670.00 $5,670.00 to excavate and abandon • lateral for 1009 Main • Street,once lots were combined,complete as specified Hours 0.00 1.50 1.50 $1,000.00 $1,500.00 • Page 13 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL • ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 30003 Additional small crew time • to excavate and abandon lateral and pipe for 929 Main Street,once City relocated lateral location, complete as specified Hours 0.00 1.00 1.00 $1,000.00 $1,000.00 30004 Additional crew time and materials to excavate for new MH for United Methodist Church,when it was discovered that existing lateral was 8"not Lump 6",complete as specified Sum 0.00 1.00 1.00 $7,970.00 $7,970.00. • 30005 Additional equipment, • • • labor, &materials to excavate sanitary sewer to verify is railroad ditches on Broad street are connected to existing sanitary sewer, complete as specified Lump • Sum 0.00 1.00 1.00 $9,019.70 $9,019.70 30006 Additional equipment, labor, &materials to install new lateral at relocated located for 929 Main Street. Main line needed to be cut and have new wye installed with hard couplings, for work performed on 8/28, Lump complete as specified Sum 0.00 1.00 1.00 $1,725.00 $1,725.00 30007 Penalties for failure to deliver televising report • prior to paving,per Section 3700.5.3.3 of the 2013 Linear Standard Specifications Feet 0.00 804.00 804100 • $2.00 $1,608.00 • ADDITIONAL WORK: C.O.#1 -(ITEMS 30000-30007)-SUB-TOTAL • $30,217.70 $0.00 NET INCREASE TO: SECTION III $16,484.61 SECTION IV-WATER MAIN • • • ITEM BID INSTALLED NET NET • UNIT INCREASE IN DECREASE IN DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE • 4000 Furnish and install 4" ductile iron water main with polywrap relay,complete Linear as specified Feet 35 35.00 $68.00 4002 Furnish and install 6" ductile iron water main with polywrap relay,complete Linear as specified Feet 375 388.00 13.00 $62.00 $806.00 4004 Furnish and install 8" ductile iron water main with polywrap relay, complete Linear as specified Feet _ 4,025 4,104.00 79.00 $67.00 $5,293.00 Page 14 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL • ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT , PRICE PRICE 4006 Furnish and install 10" ductile iron water main with polywrap relay,complete Linear as specified Feet 225 240.50 15.50 $76.00 $1,178.00 4008 Furnish and install 12" ductile iron water main with polywrap relay, complete Linear as specified Feet 250 244.50 -5.50 $81.00 ($445.50) 4036 Furnish and install 1"water service relay,complete as Linear specified Feet 1,305 1,220.50 -84.50 $55.00 ($4,647.50) 4037 Furnish and install 1'/:' water service relay, Linear complete as specified Feet 40 32.00 -8.00 $56.00 ($448.00) 4040 Furnish and install 2"water • service relay, complete as Linear • specified • Feet 40 63.00 23.00 $63.00 $1,449.00 4042 Furnish and install 1"water • service new,complete as Linear specified Feet 60 69.00 9.00 $55.00 $495.00 4048 Furnish and install 1" . corporation and stop box, complete as specified Each 49 42.00 -7.00 $265.00 ($1,855.00) 4050 Furnish and install 1-1/4" corporation and stop box, complete as specified Each 2 . 2.00 $500.00 • 4053 Furnish and install 2" corporation and stop box, complete as specified Each 1 2.00 1.00 $850.00 $850.00 4055 Furnish and install water service clay dams, complete as specified Each 52 . 46.00 . -6.00 $30.00 ($180.00) 4056 Furnish and install . connections to existing 4" water main, complete as specified Each 1 1.00 $550.00 4058 Furnish and install . • connections to existing 6" water main,complete as specified Each 8 11.00 3.00 $600.00 $1,800.00 4060 Furnish and install connections to existing 8" water main,complete as • specified Each 2 2.00 $650.00 4062 Furnish and install connections to existing 10" water main,complete_as specified • Each 5 6.00 1.00 $1,000.00 $1,000.00 • 4064 Furnish and install connections to existing 12" water main, complete as specified Each 3 2.00 -1.00 $1,100.00 ($1,100.00) 4110 Furnish and install 8"x 6" tee,complete as specified Each 12 12.00 $380.00 4111 Furnish and install 8"x 8" tee,complete as specified Each 6 6.00 $500.00 4118 Furnish and install 10"x 4" tee, complete as specified • Each 1 1.00 $575.00 Page 15 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 4128 Furnish and install 12"x 6" tee, complete as specified Each 1 2.00 1.00 $625.00 $625.00 4190 Furnish and install 8"x 10" cross,complete as specified Each 2 2.00 $700.00 4191 Furnish and install 8"x 12" cross, complete as specified Each 2 2.00 $775.00 • 4219 Furnish and install 8"11Y.. bend, complete as . specified Each 2 2.00 $275.00 4228 Furnish and install 8"22%° bend,complete as specified Each 4 6.00 2.00 $285.00 $570.00 4235 Furnish and install 4"45° • bend,complete as • specified Each 2 2.00 $180.00 . 4236 Furnish and install 6"45° . bend,complete as • specified . Each 18 35.00 17.00 $230.00 $3,910.00 4237 Furnish and install 8"45° • bend,complete as specified • Each 12 . 11.00 -1.00 _ $300.00 ($300.00) 4238 Furnish and install 10"45° bend,complete as specified Each 10 • 14.00 4.00 $380.00 $1,520.00 423.9 Furnish and install 12"45° bend,complete as specified Each 10 10.00 $550.00 4255 Furnish and install 8"cap, . complete as specified Each 1 1.00 $175.00 4264 Furnish and install 8"x 6" . reducer, complete as specified Each 7 8.00 1.00 $255.00 $255.00 4271 Furnish and install 12"x • 10"reducer, complete as - specified Each 1 1.00 $420.00 4356 Cut and cap existing 10" . water main, complete as specified Each 2 2.00 $300.00 4400 Furnish and install 4"gate valve, complete as specified Each 1 1.00 $925.00 4401 Furnish and install 6"gate . - valve,complete as • specified Each 13 15.00 '2.00 • $1,100.00 • $2,200.00 . 4402 Furnish and install 8"gate valve,complete as specified Each 25 26.00 1.00 $1,400.00 $1,400.00 4403 Furnish and install 10"gate valve,complete as _ . specified Each 4 4.00 $2,100.00 4404 Furnish and install 12"gate valve, complete as specified Each 4 5.00 1.00 $2,400.00 $2,400.00 4419 Furnish and install 6"x 6" tapping valve and sleeve, complete as specified Each 1 1.00 $2,300.00 Page 16 of 18 CONTRACT: 13-04 CHANGE ORDER#1 FINAL ITEM UNIT BID INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 4500 Furnish and install hydrant, PRICE PRICE complete as specified Each 11 12.00 1.00 4502 Furnish and install $3,200.00 $3,200.00 gradelok for hydrant branches,complete as specified Each 11 0.00 .4712 Furnish and install 2"steel -11.00 $0.01 ($0.11) casing pipe, complete as Linear specified Feet 140 100.00 4724 Furnish and install 16" -40.00 $40.00 ($1,600.00) steel casing pipe, complete Linear • as specified Feet 40 38.00 4728 Furnish and install 20" -2.00 $120.00 ($240.00) steel casing pipe, complete Linear as specified Feet 40 34.00 4900 Abandon water main on -6.00 $120.00 ($720.00) West New York Avenue, Lump • complete as specified Sum 1 1.00 4902 Abandon water main on $2,500.00 East and West 10th Avenue, complete as Lump • specified Sum 1 1.00 4920 Remove water main, Linear $2,500.00 complete as specified Feet . 950 700.00 4950 Water main utility line -250.00 $15.00 ($3,750.00) opening, complete as specified Each 2 2.00 4990 Excavation special(water), $300.00 complete as specified Tons 200 0.00 -200.00 $12.00 4992 Bentonite slurry dam ($2,400.00) (water),complete as specified Each 5 1.00 -4.00 4994 Over-excavation (water), Cubic $600.00 ($2,400.00)- complete as specified Yards 100 40.00 -60.00 $12.00 ($720.00) SECTION IV-(BID ITEMS 4000-4994)-SUB-TOTALS $28,951.00 ($20,806.11) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION IV ITEM I UNIT BID ( INSTALLED NET NET INCREASE IN DECREASE IN NUMBER I DESCRIPTION UNIT I QUANTITY QUANTITIES I INCREASE DECREASE PRICE CONTRACT CONTRACT 1 I PRICE PRICE I I 40000 Additional equipment, labor, &materials to removed abandoned gas main that was in conflict with tapping valve and sleeve in the intersection of W. 10th Avenue and Oregon Street,for work performed on 6/26, Lump complete as specified Sum 0.00 1.00 1.00 $1,150.00 $1,150.00 Page 17 of 18 CONTRACT:13-04 CHANGE ORDER#1 FINAL • INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 40001 Additional equipment, labor,&materials to remove existing concrete vault and fill with CABC on East 10th Avenue,for work performed on 7/24, Lump • complete as specified Sum 0.00 1.00 1.00 $2,095.00 $2,095.00 40002 Additional equipment, labor,&materials to install new service at relocated location for 929 Main • Street. Old Service needed to be abandoned and new service needed with additional bends,for • work performed on 8/28, Lump complete as specified Sum 0.00 1.00 1.00 $1,725.00 $1,725.00 • ADDITIONAL WORK: C.O.#1 (ITEMS 40000-40002)-SUB-TOTAL $4,970.00 . $0.00 NET INCREASE TO: SECTION IV $13,114.89 NET INCREASE TO SECTIONS I, II, III,IV $303,793.70 .NET DECREASE TO SECTIONS I, II, Ill,IV ($157,179.40) NET INCREASE TO CONTRACT: $146,614.30 • • • Page 18 of 18