Loading...
HomeMy WebLinkAbout0159122-Building � CITY OF OSHKOSH No 159122 � OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 2261-2299 WESTOWNE AVE Create Date 12/19/2013 Project O�ce Build-out _ ___ Project Number 20130704 Owner WESTOWNE SHOPPES LLC Plan Z3-3936-1213 Contractor NORTHCENTRAL CONSTRUCTION CORP. Inspector Nicole Krahn Designer Category 223-Alteration Offices, Banks,Professional Type of Plan Alt. Level 2 Zoning C-2PD Square Footage Major Occ B; Business Const Class Type IIB Fire Protection � Sprinkled 0 Unsprinkled � Sprinkler Design NFPA 13 Occupancy Permit Required Fiood Plain Height Permit Park Dedication #Dweliing Units 0 #Structures 0 ❑ Projection Canopies _ Signs Use/Nature of Work COMM/2267/Office build-out*Create 2 offices within an exiting whitebox space. , i i HVAC Contractor Plumbing Contractor ' Electric Contractor Fees: Valuation $10,000.00 Plan Approvai $0.00 Permit Fee Paid $154.44 Park Dedication $0.00 Issued By: Date 12/19/2013 Final/O.P. 00/00/0000 : � Permit Voided' Parcel Id# 1621650400 in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to s necessary approvals before starting such activity. I have read and understand the mentioned information. Signature r-- Date _ f�`�E-�-Z�(.� � AgenUOwner Address 631 S HICKORY ST FOND DU LAC WI 54935 - 5502 Telephone Number 920-929-9400 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.