Loading...
HomeMy WebLinkAbout21906-Cross Connection Control (testing) 12/26/2013 i . CITY OF OSHKOSH INSPECTION SERVICES DIVISION ROOM 205 � 215 CHURCH AVE DEPARTMENT OF COMMUNITY DEVELOPMENT � PO Box 1130 CORRECTION NOTICE OSHKOSH OSHKOSH WI 54903-1130 ON THE WATER Issue Date 12/26/2013 Re Issue Date Complies No Address 2737 HARRISON ST Sent to ✓ Owner � OSHKOSH CORPORATION PO BOX 2566 OSHKOSH WI 54903 -2566 Required for Occupancy Occupancy Introduction There is a cross connection control assembly RO#1230572 that has not been tested. The installation for this assembly is non-compliant because it is more than 7 feet above the floor. Item# 1 Code SPS 382.41(5)(�2. Complies No Comply By 01/25/2014 IMMEDIATELY Description The maximum distance befinreen the floor, surface or platform which is to provide access and the lowest point of the assembly may not be more than 7 feet. Summarv The assembly must be re-installed in a code compliant manner and testedwithin the next 30 days. Documentation of the test shall be sent to the State of Wisconsin and the City of Oshkosh. Violations must be corrected and approved by the noted compliance dates of each item. Call for reinspections prior to concealment and/or occupancy. Upon completing the corrections,the owner/contractor/agent must sign and date at the bottom of this notice and return it to the Inspection Services Division by the Compliance Date of 1/25/2014 Office hours are Monday through Friday 7:30 a.m.-4:30 p.m. or by appointment.To schedule inspections please call the Inspection Request li at 6-5128 noting the address, permit number(when applicable),and the nature of what needs to be inspected. Signature Date/Z.u�� � In pected by: Jon Mueller 236-5049 jmueller�ci.oshkosh.wi.us I hereby certify the violations listed on this report have been corrected in compliance with the applicable codes. Print Name Company Signature Date Also Sent to: Bldg _ _ __ Elec _ ' HVAC _ _ Plbg i - Designer __ _ Other _ _ -__ Inspector � 21906 Page 1 of 1