HomeMy WebLinkAboutPW CNT 84-01/CHG OR 6/Fluor Bros Construction CHANGE ORDER NO. 6 TO: FLUOR BROS. CONSTRUCTION CO. DATED: 203 Otter Avenue P.O. Box 2326 Oshkosh, WI 54903 Your present contract with the City of Oshkosh, Contract No. 84-01 is hereby amended and changed as follows: ( insert here work and/or materials to be added or eliminated and the unit and/or lump sum price to be added to or deducted from the contract . ) OSHKOSH LOW LIFT/HIGH SERVICE PUMPING STATION For a description of the following items in this change order refer to the following sheet No . 2 Item No. 1 $6 ,687.00 Item No . 2 $ 1 , 097. 00 Item No . 3 $3 ,967 . 00 Item No . 4 $ 16 ,235. 00 Total Change Order No. 6 $27 ,986 . 00 All Items are to be made at No Change in the Contract Time Original Contract Amount $ 1 , 393 , 700 . 00 Total Amount of Previous Change Orders To Date 12 , 799 . 00 Previous Adjusted Contract Amount $ 1 ,406 , 499 . 00 Change Order No. 6 Amount 27 ,986 . 00 Total Amount of Current Contract Including C . O . 6 $ 1 ,434 ,485 . 00 Recoe,' dMd : CI OF OSHKOSH �irecto " of "D- •lic Works Y _ • �� `�-` City Manager / /. /2/;''A-) t/122_4L.4d.)-) City Cler Approved and accepted : C oli t ra c t c r /4.- I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. �tt'r,t,' U �'t c`�.cc / Comptroller Approved as to form: liu;1:�P c. L ; . City Attarneyc, ,4 Change Order No. 6 Sheet No. 2 March 18, 1985 Item No. 1 Provide two 20—inch diamter 90° MJ fittings and all necessary appurtences required to connect the two new 20" diameter high service discharge lines with the existing 24" high service PCCP water main. Item No. 2 Provide insulation over the 14" sump discharge line running from the south wall of the new pump station to the existing sanitary manhole. Insulation should meet the requirements as specified in specification section 7200. Insulation should be 2" thick, 16" wide, centered over the sump line , and be placed 3" above the line. Item No. 3 Provide additional labor and material necessary to dewater the existing 30" PCCP intake line running from Millers Bay to the Filtration Plant. Dewatering required in order to proceed with the necessary connections to the new pump station. Item No. 4 Provide additional labor and materials necessary to reroute the new 30" D.I. piping connecting the high service tanks in the new pump station with the existing north reservoir. Layout to be as shown in the drawings transmitted from HNTB to Fluor Construction Co. Inc. by letter of transmittal dated November 30, 1985.