CHANGE ORDER NO. _ G-9
OWNER'S COPY 1i0'
FILE NO 8133/79005 - Phase II
CONTRACTOR'S COPY
DATE 6 March 1985
ARCHITECT'S COPY
The City of Oshkosh
OWNER 215 Church Avenue, Oshkosh, Wisconsin
Marino Construction Company, Inc.
CONTRACTOR 3620 South Clement Avenue, Milwaukee, Wisconsin 53207
General Construction Work, Phase II, Restoration and
CONTRACT FOR _Rehabilitation, The Grand Opera House, Cit of Oshkosh, WI
IT IS HEREBY AGREED THE FOLLOWING CHANGE IN THE WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE
ATTACHED PROPOSAL AND SUBJECT TO TERMS OF THE ORIGINAL CONTRACT DATED 15 September 1983
SEE ATTACHMENT
FOR THE SUM OF (ADD -)0EZglg NINF� TNnrTSAND FOUR HIT DRF. ) SEVEN
AND 99 111THS
DOLLARS ($
ADD DEDUCT ORIGINAL CONTRACT
PRIOR TO 476, 944 . 00
THIS ORDER 47, 335. 47 NONE EXTRA ORDERS
56, 743. 46
THIS ORDER
9,407. 99 NONE CREDIT ORDERS
TOTAL TO DATE NONE
56, 743. 46 NONE NET TOTAL TO DATE
`33, 687. 46
APPROVED
YARBRO-KEMPINGER, ARCHITECTS ACCEPTED
PFALLE HE BSS CITE' OF fSHKOSH, k�TISCONSIN
�� SSO�� ATES, INC. ,
BY
Robert L. Y. bro -_-------_-- BY ,( '
t--T-Manager
ACCEP ED BY t"� ! ' ��z,d'
MARIO ONSTRUCTION CO. ,INC. App owed ,.. s •r.' For --�'`t Clerk
BY i, , , '4'►.._,_ galt 15 v- i attorney
.4' I hereby certi y-that the necessary
provisions ha been ma e . e
-3-//e..f" liability that will accrue under this contract.
r: ,
t ( a tti-#t--r City Oamptroller
since 1908
4' .
MARINO CONSTRUCTION CO. ' 4
Incorporated
GENERAL CONTRACTORS • BUILDERS
February 7, 1985
Yarbro-Kempinger Architects, Inc.
1018 West South Park Avenue
P. 0. Box 2096
Oshkosh, Wisconsin 54903
Attn: Mr. Robert Yarbro
RE: The Grand Opera House Phase II
Project No. 8133/79005
Change Estimate No. 18
Gentlemen:
Attached please find our Change Estimate No. 18 to close the opening in fire wall
in proscenium to attic space, resulting in an ADD to our contract in the amount of
THREE THOUSAND TWO HUNDRED EIGHTY THREE DOLLARS AND SEVENTY CENTS ($3,283.70).
Please issue the appropriate change order.
Respectfully submitted,
0 CONSTRUCTION COMPANY, INC.
411, liril-ta--1 ,/99a,e--z- 2---t)
James R. Marino
Executive Vice President
JRM/dee
Att.
cc: Mr. John W. Pence, City Attorney
City Hall, Oshkosh
A
%
since 1908
,.— fleat,..
t. 4;4,- a tt- ,. �" -air g,. ~, ,..
MARINO CONSTRUCTION CO. „ ,. _>
Incorporated t,. 44 . `.rt
GENERAL CONTRACTORS • BUILDERS
February 7, 1985
Yarbro-Kempinger Architects, Inc.
1018 West South Park Avenue
P. 0. Box 2096
Oshkosh, Wisconsin 54903
Attn: Mr. Robert Yarbro
RE: The Grand Opera House Phase II
Project No. 8133/79005
Change Estimate No. 19
Gentlemen:
Attached please find our Change Estimate No. 19 for the joist found rotted and
unsafe, annex stair landing 1st floor, labor and materials to correct same,
resulting in an ADD to our contract in the amount of ONE THOUSAND TWO HUNDRED
FOURTEEN FOLLARS AND SEVENTY FIVE CENTS ($1,214.75).
Please issue the appropriate change order.
Respectfully submitted,
MARINO CONSTRUCTION COMPANY, INC.
•(James R. Marino
Executive Vice President
JRM/dee
Att.
cc: Mr. John W. Pence, City Attorney
City Hall, Oshkosh
Ake
mice 190E
r may' ,c*..ag*j { �.�7 y
MARINO CONSTRUCTION CO ,:,, .k.,. , ,, ,y.
Incorporated = = •`q rcn
GENERAL CONTRACTORS • BUILDERS
February 11, 1985
Yarbro-Kemping+er Architects, Inc.
1018 West South ParkrAvenue
P. 0. Box 2096
Oshkosh, Wisconsin 54903
Attn: Mr. Robert Yarbro
RE: The Grand Opera House Phase II
Project No. 8133/79005
Change Estimate No. 21
Gentlemen:
Attached please find our Change Estimate No. 21 for reinforcing the joist as
requested by the architect, resulting in an ADD to our contract in the amount
of TWO HUNDRED EIGHTY FOUR DOLLARS AND FIFTY FIVE CENTS ($284.55).
Please issue the appropriate change order.
Respectfully submitted,
0 • ' NO CONSTRUCTION COMPANY, INC.
r _ , , C7,�rz� 70
(James R. Marino
Executive Vice President
JRM/dee
Att.
cc: Mr. John W. Pence, City Attorney
City Hall, Oshkosh, WI
4 .r.
-_;,, 9t.,4,.Ai. . +a ■ S. <a,r w r,,,, - 1 , : * ,u c- *'.t ...
since 1908 MARINO CONSTRUCTION CO. 32(.;z
Incorporated f 41 11.4 10t-,
GENERAL CONTRACTORS • BUILDERS
February 26, 1985
Yarbro Kempinger Architects, Inc.
1018 West South Park Avenue
P. 0. Box 2096
Oshkosh, Wisconsin 54903
RE: The Grand Opera House Phase II
Project No. 8133/79005
Change Estimate No. 23 Reivsed
Gentlemen:
Attached please find our revised Change Estimate No. 23 to patch and close masonry
opening at Stage, and build & patch for beam elevation 95' 6", patch, furr and
plumb wall cavities at Orchestra Pit, resulting in an ADD to our contract in the
amount of ONE THOUSAND THREE HUNDRED 'THIRTY ONE DOLLARS AND FIFTY FIVE CENTS
($1,331.55).
Please issue the appropriate change order.
Respectfully submitted,
INO CONSTRUCTION COMPANY, INC.
#./.7;e1/1
amen R. Marino
Executive Vice President
JRM/dee
Att.
COMMERCIAL • 1 Nf]I 1 T =7 t -O— .- .'etr A1aic„
sine(' 1908
MARINO CONSTRUCTION CO
Incorporated s1 z.;'. 1 ;:?.�
GENERAL CONTRACTORS • BUILDERS
February 12, 1985
Yarbro-Kempinger Architects, Inc.
1018 West South Park Avenue
P. 0. Box 2096
Oshkosh, Wisconsin 54903
Attn: Mr. Robert Yarbro
RE: The Grand Opera House Phase II
Project No. 8133/79005
Change Estimate No. 24
Gentlemen:
Attached please find our Change Estimate No. 24 to remove concrete reinforced
topping on wd. joist, not in contract, resulting in an ADD to our contract in
the amount of ONE HUNDRED EIGHTY FOUR DOLLARS AND FIFTY FIVE CENTS ($184.55).
Please issue the appropriate change order.
Respectfully submitted,
MARINO CONSTRUCTION COMPANY, INC.
4110° r
lieues R. Marino
ecutive Vice President
JRM/dee
Att.
cc: Mr. John W. Pence, City Attorney
City Hall, Oshkosh, WI
J\ti
since 1908
h,
MARINO CONSTRUCTION CO. -j..,. ,,, = ,
Incorporated ' ''"' q %-1.1
GENERAL CONTRACTORS • BUILDERS
February 12, 1985
Yarbro-Kempinger Architects, Inc.
1018 West South Park Avenue
P. 0. Box 2096
Oshkosh, Wisconsin 54903
Attn: Mr. Robert Yarbro
RE: The Grand Opera House Phase II
Project No. 8133/79005
Change Estimate No. 25
Gentlemen:
Attached please find our Change Estimate No. 25 to remove loose brick on North
wall annex parapet and replace, resulting in an ADD to our contract in the amount
of SIX HUNDRED FORTY SEVEN DOLLARS AND SIXTY FIVE CENTS ($647.65).
Please issue the appropriate change order.
Respectfully submitted,
t 'INO CONSTRUCTION COMPANY, INC.
de
i .�1/Y/a cry.,-�-e
/Karnes R. Marino
Executive Vice President
JRM/dee
Att.
cc: Mr. John W. Pence, City Attorney
City Hall, Oshkosh, WI
DVx`r.r
roue 190
tec ' 09 ° ,.
S
MARINO CONSTRUCTION CO. , . ,t ,, , 7
Incorporated ' =+1 '1,1 -,` h=
GENERAL CONTRACTORS • BUILDERS
February 12, 1985
Yarbro-Kempinger Architects, Inc.
1018 West South Park Avenue
P. 0. Box 2096
Oshkosh, Wisconsin 54903
Attn: Mr. Robert Yarbro
RE: The Grand Opera House Phase II
Project No. 8133/79005
Change Estimate No. 27
Gentlemen:
Attached please find our Change Estimate No. 27 for additional work required
in Rooms B-01, B-16 and $--20, resulting in and ADD to our contract in the amount
of FIVE HUNDRED TWENTY TWO DOLLARS AND FIFTY CENTS ($522.50).
Please issue the appropriate change order.
Respectfully submitted,
MARINO CONSTRUCTION COMPANY, INC.
lie / I - 1 '/ ..‘,,L-7-1-40
James R. Marino
Executive Vice President
JRM/dee
Att.
cc: Mr. John W. Pence, City Attorney
City Hall, Oshkosh, WI
mu( 1908
MARINO CONSTRUCTION CO
Incorporated 0 1 1
GENERAL CONTRACTORS • BUILDERS
February 12, 1985
Yarbro-Kempinger Architects, Inc.
1018 West South Park Avenue
P. 0. Box 2096
Oshkosh, Wisconsin 54903
Attn: Mr. Robert Yarbro
RE: The Grand Opera House Phase II
Project No. 8133/79005
Change Estimate No. 2$
Gentlemen:
Attached please find our Change Estimate No. 29 for extra work required at
basement of stair w$1l #3 wall adjacent to existing annex foundation wall, etc.,
resulting in an ADD to our contract in the amount of ONE THOUSAND SIX HUNDRED
EIGHTY TWO DOLLARS AND SIXTY FOUR CENTS ($1,682.64).
Please issue the appropriate change order.
Respectfully submitted,
i. 'INO CONSTRUCTION COMPANY, INC.
AOP
►" = flea R. Marino
xecutive Vice President
JRM/dee
Att.
cc: Mr. John W. Pence, City Attorney
City Hall, Oshkosh, WI
ikkti
singe 1908
bt$'1' ", `1"1" , . . , „, . _,.. , _
_4,4. .,, 1---4,-.:,,, -1,/ , . , .., oi.i., --..--,----7t.-*
MARINO CONSTRUCTION CO _tkr4 '1 .. ka
Incorporated '�'`i `�
GENERAL CONTRACTORS • BUILDERS
February 12, 1985
Yarbro-Kempinger Architects, Inc.
1018 West South Park Avenue
P. 0. Box 2096
Oshkosh, Wisconsin 54903
Attn: Mr. Robert Yarbro
RE: The Grand Opera House Phase II
Project No. 8133/79005
Change Estimate No. 30
Gentlemen:
Attached please find our Change Estimate No. 30 for extra work to mason up and
close basement window below rear door annex, opening not shown on plan and was
uncovered during construction, resulting in an ADD to our contract in the amount
of TWO HUNDRED FIFTY SIX DOLLARS AND TEN CENTS ($256.10).
Please issue the appropriate change order.
Respectfully submitted,
-MARINO CONSTRUCTION OMPANY, INC.
,
/ - �az)-
i "es R. Marino
vecutive Vice President
JRM/dee
Att.
cc: Mr. John W. Pence, City Attorney
City Hall, Oshkosh, WI
y ,.._yarbro -
kempinger
c____J architects, inc.
J 1018 W. SOUTH PARK AVENUE • POST OFFICE BOX 2096 • OSHKOSH, WISCONSIN 54903 • 414/235-3310
DATE: 13 March 1985 RE: FILE 8133/79005 - Phase II
TO: Ms. Catherine Porter Restoration and Rehabilitation
Associate Planner The Grand Opera House
215 Church Avenue Oshkosh, Wisconsin
Oshkosh, Wisconsin 54901 CC: RECEIVED
WE ARE ENCLOSING THE FOLLOWING
FOR YOUR REVIEW PER YOUR REQUEST
AR 1 4 1985
FOR YOUR USE X For City Council Action
QEPAI?TMENT OF
z COi4�MU f�TY DEVELOPMEP T
Cl) U)W z C.7 J wz
d Z Et" U 0 Z z pH :,Jr O
0 O Cl_ z o.w c g Ill D } a H DESCRIPTION AND/OR
U Ow O -§ O wY Qg OD 0 a w
wo z wo i 1 < Z X Q 20 W w FE w - DRWG. OR MODEL NO.
w W wO w cn a d cc
Om Om o ~w iw w O
Z Z O 0 z O 0 O
H
4 -- C. O. G-9 Marino Construction Company, Inc.
COMMENTS:
Bob Yarbro
ATTACHMENT
Change Order G-9
Marino Construction Co. , Inc.
6 March 1985
RE: File 8133/79005 - Phase II
Restoration and Rehabilitation
The Grand Opera House
Oshkosh, Wisconsin
PER ARCHITECT' S REQUEST DUE TO ON-SITE DISCOVERIES :
All work is completed.
( "Change Estimate Numbers" relate to Contractor' s numbering system. )
Change Estimate No. 18 dated February 7, 1985,
copy attached. This is for bricking closed an
opening through the procenium fine wall at the
Attic Level ADD $3,283 . 70
Change Estimate No. 19 dated February 7, 1985,
copy attached. This is for replacing of rotted
floor joist, first floor of the Annex at the north
end ADD 1, 214 . 75
Change Estimate No. 21 dated February 11, 1985,
copy attached, for reinforcing wood floor joists
under Room D. 09 . Original joists were cut away
for sprinkler main installation ADD
Change Estimate No. 23 dated February 26, 1985,
copy attached. This is for masonry work at the
basement level at each end of the orchestra pit
to patch and close encountered openings and for
concrete beam support where it was discovered
none existing ADD 1,331. 55
Change Estimate No. 24 dated February 12 , 1985,
copy attached. This is for removal of discovered
concrete topping over wood joists , Room F. 07 ADD 184 . 55
Change Estimate No. 25 dated February 12 , 1985,
copy attached. This is for removing and
replacing of loose bricks at the top of the
Annex North Wall ADD 647. 65
Change Estimate No. 27 dated February 12 , 1985 ,
copy attached. This is for removal of discovered
concrete curbs under removed masonry walls,
Rooms B. 02 , B. 16 and B. 20 ADD 522 . 50
Page 1 of 2
Change Estimate No. 29 dated February 12, 1985 ,
copy attached. This is for removal of protruding
Annex foundation stones which interferred with
new wall construction ADD 1, 682 . 64
Change Estimate No. 30 dated February 12 , 1985,
copy attached. This is for masonry closure
of a basement window below the original rear
Annex door ADD 256. 10
TOTAL CHANGE ORDER AMOUNT, ADD $9,407. 99
Page 2 of 2