Loading...
HomeMy WebLinkAboutPW CNT 83-13/CHG OR #1/ Four Way Construction CHANGE ORDER NO. 1 TO: FOUR-WAY CONST. OF WI INC. DATED: October 24, 1984 P.O. Box 133 Berlin, WI 54923. Your present contract with the City of Oshkosh, Contract No. 83-13 is hereby amended and changed as follows: ( insert here work and/or materials to be added or eliminated and the unit and/or lump sum price to be added to or deducted from the contract. ) ADD - TO WATER MAIN STATE STREET, extra costs associated with removing unknown concrete foundations due to slight realignment of main $ 1,650.00 DIVISION STREFT, extra costs involving relocating main due to gas and telephone conflicts and extra fittings required to repair old services and connect to old main in poor condition $ 4,264.00 PIERCE AVENUE, extra cost to repair storm sewer and build new storm inlet in existing line which was in very poor condition and collapsed during construction $ 1,815.00 ADAMS AVENUE, extra cost for connection work added since contract bid and repairing lateral $ 473.00 TOTAL ADDED BY CHANGE ORDER #1 $ 8,202.00 Recomv'. d: CITY 0, OSHKOSH s /_ r_/_ By: Director o —?P.lic Wor s City Manager City Clerk Aoprov- . and -cceptea: -000' .e_4% - /".1 Con a�'er / I certify that provision has 'been made to pay the Liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attor ey , c��