HomeMy WebLinkAbout22. 13-559
DECEMBER 10, 2013 13-559 RESOLUTION
(CARRIED__7-0____LOST________LAID OVER________WITHDRAWN________)
PURPOSE: APPROVE VARIOUS FEES FOR INSPECTION SERVICES
DIVISION
INITIATED BY: DEPARTMENT OF COMMUNITY DEVELOPMENT
INSPECTION DIVISION
WHEREAS, the Building Ordinance, Chapter 7, the Electrical Code Ordinance,
Chapter 11, and the Plumbing Code Ordinance, Chapter 20, of the Municipal Code
provides for the adoption of a fee schedule for various fees throughout those chapters
to be incorporated into a fee schedule; and
NOW, THEREFORE, BE IT RESOLVED that the attached Fee Schedule is
hereby adopted and shall be in full force and effect on and after January 1, 2014.
INSPECTION SERVICES DIVISION FEE SCHEDULE
Effective January 1, 2013
BUILDING
The below fee breakdown is for but non limited to:
Interior Remodeling/Alterations, Decks, Fences, Patios, Steps, Porches, Driveways, Pools, Signs,
Windows, Roofing, Siding, Demo/Razing, Ramps, Etc:
Valuation
Fee
$ 0 to $ 1,000.00
.................................. ............................... .........................$37.00
$ 1,000.01 to $ 2,000.00
.................................. ............................... .........................$44.00
$ 2,000.01 to $ 3,000.00
.................................. ............................... .........................$51.00
$ 3,000.01 to $ 4,000.00
................................... ............................... .........................$58.00
$ 4,000.01 to $ 5,000.00
.................................. ............................... .........................$65.00
$ 5,000.01 to $ 6,000.00
.................................. ............................... .........................$72,00
$ 6,000.01 to $ 7,000.00
.................................. ............................... .........................$79.00
$ 7,000.01 to $ 8,000.00
.................................. ............................... .........................$86.00
$ 5,000.01 to $ 9,000.00
.................................. ............................... .........................$93.00
$ 9,000.01 to $10,000.00
................................. ............................... ........................$100.00
$10,000.01 to $20, 000.00
............... ........................$100.00 for the first $10,000.00
plus $6.00 for each thousand dollar valuation or part thereof
Over $20, 000.00 .........................
........................$160.00 for the first $20,000.00
plus $3.50 for each thousand dollar valuation or part thereof
The below fee breakdown is for:
New Buildings & Additions:
............................. ..........................$0.18 per square foot (Minimum of $30.00)
(square footage includes all new areas including garages, basement/crawlspace and decks or porches)
Additional Fees:
New Construction: one or two - family structure
Early Start Permit ( optional) ........ ............................... ........................$100.00
Plan Examination .............................................. ..............................$ 75.00
Wisconsin Uniform Building Permit Seal (cost + $ 5. 00) ..............................$ 30.00
SidewalkGrade Stake ......................................... ..............................$ 15.00
ZoningReview ................................................. ..............................$ 25.00
New Construction: multiple family (more than 2 units) or commercial /industrial structure
Plan Examination .................see WI Dept of Safety and Professional Services schedule
Sidewalk Grade Stake (when applicable) ................... ..............................$ 15.00
Zoning Review (up to 10,000 sq. ft.) ........................ ..............................$ 100.00
Zoning Review (over 10,000 sq. ft.) ......................... ..............................$ 200.00
Zoning Review (revision / amendment) ..................... ..............................$ 75.00
Additions or Alterations: one or two - family structure
Plan Examination — Deck, detached garages ............... ..............................$ 25.00
Plan Examination —1 -story building ........................ ..............................$ 50.00
Plan Examination — 2 -story building ........................ ..............................$ 75.00
Moving Permit: Under 500 sq. ft ..................................... ..............................$ 50.00
500 sq.ft. or more ................................... ..............................$ 100.00
Projection Fee: Sign ................................................... ..............................$ 50.00
Projection other than sign (i.e. awning) .......... ..............................$ 75.00
Zoning Review (see items listed below) ..... .........................$15.00 fence or ........... $ 25.00
New, expansion/addition: Deck, Driveway, Garage, Patio, Pool Ramp, Shed, Sign, Utility Building
Also see Miscellaneous Fees
MISCELLANEOUS
Commencing Work Without Permits .............................................. ............................... Double Fee
or $100.00 plus the normal permit fee, whichever is greater
Reinspection ................................................................ ............................... $100.00 per reinspection
CODE INFORCEMANT SERVICE FEE
Initial Service Fee ...................................................... ..............................$ 20.00
Subsequent Service Fee ................................................ ..............................$ 50.00
ROOMING HOUSE
Rooming House License (Annual) ............................... ............................... ........................$100.00
plus $15.00 per bedroom
Rooming House — Penalty for Late License .................................... ............................... Double Fee
for late renewal or operating without a license
HEATING
Valuation Fee
$0 to $1,000.00 ............................................................... ............................... .........................$30.00
$1,000.01 to $10, 000. 00 .................. ............................... .........................$30.00 for first $1,000.00
plus $16.00 per each additional $1,000.00 valuation or part thereof
$10,000.01 to $25,000.00 ............... ............................... .......................$174.00 for first $10,000.00
plus $10.00 per each additional $1,000.00 valuation or part thereof
Over $25,000.00 ...................... ............................... ........................$324.00 for the first $25,000.00
plus $5.00 per each additional $1,000.00 valuation or part thereof
Plan Examination ... ............................... see WI Dept of Safety and Professional Services schedule
Also see Miscellaneous Fees
STORAGE TAN=KS
Installation & Removal of Tanks......... see WI Dept of Safety and Professional Services schedule
ELECTRICAL
Valuation Fee
$0 to $500.00 ..................................................... ............................... .........................$30.00
$500.01 to $1, 000. 00 ......... ............................... .........................$30.00 for the first $500.00
plus $8.00 for each additional hundred dollar valuation or part thereof
$1,000.01 to $10,000.00 .................. .........................$70.00 for the first $1,000.00
plus $17.00 for each additional thousand dollar valuation or part thereof
$10,000.01 to $20, 000.00 .................. ........................$223.00 for the first $10,000.00
plus $6.00 for each additional thousand dollar valuation or part thereof
Over $20, 000.00 ......................... ........................$283.00 for the first $20,000.00
plus $3.50 for each additional thousand dollar valuation or part thereof
Electrical License Fees (Type C, M, 5):
Original............................................................. ............................... ........................ $100.00
Renewal...................................................................................... ............................... $75.00
Electrical Credential Exam ......................................... ............................... .........................$25.00
Local Electrician Credential (3 -Year Credential):
New................................................................... ............................... ........................ $100.00
Renew................................................................ ............................... .........................$75.00
Annual Permits (Type M Optional Arrangement):
Assessed Valuation Fee
$50,000.00 or less ............................................. ............................... ........................ $100.00
$50,000.01 to $100,000.00 inclusive ................ ............................... ........................$200.00
$100,000.01 to $500,000.00 inclusive .............. ............................... ........................$300.00
$500,000.01 to $1,000,000.00 inclusive ........... ............................... ........................$400.00
$1,000,000.01 and over ..................................... ............................... ........................$500.00
Also see Miscellaneous Fees
PLUMBING
Fee
MinimumPermit Fee ..................................................... ............................... .........................$30.00
Eachfixture: New ......................................................... ............................... ..........................$9.00
Relocated................................................ ............................... ..........................$9.00
Replaced or roughed in for future use .... ............................... ..........................$9.00
Disconnect, abandon, or capping off of lateral (each lateral ) ........................ ..........................$9.00
Sanitary or Storm Sewer connections at main in street or curb .................... .........................$50.00
Sanitary or Storm Sewers re -laid from main or curb to building or main to curb .................$50.00
Water Service connections at main in street or curb ..... ............................... .........................$50.00
Water Service re -laid from main or curb to building or main to curb .......... .........................$50.00
Water Service and Sewer repair ..................................... ............................... .........................$50.00
PrivateWells ..................................... ............................... .........................$50.00
Plan Examination ........... ............................see City of Oshkosh Plan Review Fee schedule
Also see Miscellaneous Fees
OfHKOIH
ON THE WATER
TO: Honorable Mayor and Members of the Common Council
FROM: Allen Davis
Community Development Director
DATE: December 5, 2013
RE: Approval of Building Inspector Late Permit Fees & Plumbing Fee Schedule
BACKGROUND
Staff and City Council reviewed the fees as part of the budget planning. The late permit fee
is based on the penalty that is charged for projects that start without the proper permits, The
plumbing code change reduces the number of commercial fixtures requiring a plumbing plan
review from 16 to 10 fixtures. The fees generated have been incorporated into the City's
2014 Budget. There are other references to fees in the City Code that will be relocated to the
Fee Schedule, adopted by resolution.
ANALYSIS
The late fee increase is based on the levels of non- compliance for the homeowners or
contractors not pulling permits in the City. The current double permit fee does not adequately
encourage compliance. Other communities in the Fox Valley already charge the triple permit
fee. Staff hopes that the increase will encourage more compliance. The triple permit fee
should take effect January 1, 2014.
The Plumbing Code change relates to the number of fixtures in a commercial building that
would trigger a plumbing plan submittal.and City staff's review and approval. Currently, 16
fixtures require a plumbing plan submittal, review and approval. It is proposed that 10
fixtures be the trigger for a plumbing plan review, review and approval. The advantages of
lowering the fixture count are:
• Evidence of Plumbing Code compliance is easier when plans are drawn and
reviewed.
Plumbers bidding on a project have a specific plan for plumbing rather than
estimating or guessing.
• Inspections in the field have the plumbing plans for comparison to actual
construction, showing all connections, venting, and fixtures, existing and proposed.
• The plumbing in the building is memorialized for future reference so that repairs or
expansions are easier and the plumbing is not hidden behind walls.
Due to the bidding nature and plan design, staff recommends that the new plumbing code
change take effect March 1, 2014 so that plumbers and designers can factor in the plumbing
plan review fee into 2014 projects.
The other language changes in the code update relocate the fees from City Code and place it
in the Fee Schedule, to be adopted. The relocated fees are not changing with this code
update.
FISCAL IMPACT
The fees will generate about $39,500.
RECOMMENDATION
City Council approves the fee and code changes and waives the second reading so the Late
Permit Fee can go into effect January 1, 2014.
Approved,
W zoo;�
City Manager