Loading...
HomeMy WebLinkAbout22. 13-559 DECEMBER 10, 2013 13-559 RESOLUTION (CARRIED__7-0____LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVE VARIOUS FEES FOR INSPECTION SERVICES DIVISION INITIATED BY: DEPARTMENT OF COMMUNITY DEVELOPMENT INSPECTION DIVISION WHEREAS, the Building Ordinance, Chapter 7, the Electrical Code Ordinance, Chapter 11, and the Plumbing Code Ordinance, Chapter 20, of the Municipal Code provides for the adoption of a fee schedule for various fees throughout those chapters to be incorporated into a fee schedule; and NOW, THEREFORE, BE IT RESOLVED that the attached Fee Schedule is hereby adopted and shall be in full force and effect on and after January 1, 2014. INSPECTION SERVICES DIVISION FEE SCHEDULE Effective January 1, 2013 BUILDING The below fee breakdown is for but non limited to: Interior Remodeling/Alterations, Decks, Fences, Patios, Steps, Porches, Driveways, Pools, Signs, Windows, Roofing, Siding, Demo/Razing, Ramps, Etc: Valuation Fee $ 0 to $ 1,000.00 .................................. ............................... .........................$37.00 $ 1,000.01 to $ 2,000.00 .................................. ............................... .........................$44.00 $ 2,000.01 to $ 3,000.00 .................................. ............................... .........................$51.00 $ 3,000.01 to $ 4,000.00 ................................... ............................... .........................$58.00 $ 4,000.01 to $ 5,000.00 .................................. ............................... .........................$65.00 $ 5,000.01 to $ 6,000.00 .................................. ............................... .........................$72,00 $ 6,000.01 to $ 7,000.00 .................................. ............................... .........................$79.00 $ 7,000.01 to $ 8,000.00 .................................. ............................... .........................$86.00 $ 5,000.01 to $ 9,000.00 .................................. ............................... .........................$93.00 $ 9,000.01 to $10,000.00 ................................. ............................... ........................$100.00 $10,000.01 to $20, 000.00 ............... ........................$100.00 for the first $10,000.00 plus $6.00 for each thousand dollar valuation or part thereof Over $20, 000.00 ......................... ........................$160.00 for the first $20,000.00 plus $3.50 for each thousand dollar valuation or part thereof The below fee breakdown is for: New Buildings & Additions: ............................. ..........................$0.18 per square foot (Minimum of $30.00) (square footage includes all new areas including garages, basement/crawlspace and decks or porches) Additional Fees: New Construction: one or two - family structure Early Start Permit ( optional) ........ ............................... ........................$100.00 Plan Examination .............................................. ..............................$ 75.00 Wisconsin Uniform Building Permit Seal (cost + $ 5. 00) ..............................$ 30.00 SidewalkGrade Stake ......................................... ..............................$ 15.00 ZoningReview ................................................. ..............................$ 25.00 New Construction: multiple family (more than 2 units) or commercial /industrial structure Plan Examination .................see WI Dept of Safety and Professional Services schedule Sidewalk Grade Stake (when applicable) ................... ..............................$ 15.00 Zoning Review (up to 10,000 sq. ft.) ........................ ..............................$ 100.00 Zoning Review (over 10,000 sq. ft.) ......................... ..............................$ 200.00 Zoning Review (revision / amendment) ..................... ..............................$ 75.00 Additions or Alterations: one or two - family structure Plan Examination — Deck, detached garages ............... ..............................$ 25.00 Plan Examination —1 -story building ........................ ..............................$ 50.00 Plan Examination — 2 -story building ........................ ..............................$ 75.00 Moving Permit: Under 500 sq. ft ..................................... ..............................$ 50.00 500 sq.ft. or more ................................... ..............................$ 100.00 Projection Fee: Sign ................................................... ..............................$ 50.00 Projection other than sign (i.e. awning) .......... ..............................$ 75.00 Zoning Review (see items listed below) ..... .........................$15.00 fence or ........... $ 25.00 New, expansion/addition: Deck, Driveway, Garage, Patio, Pool Ramp, Shed, Sign, Utility Building Also see Miscellaneous Fees MISCELLANEOUS Commencing Work Without Permits .............................................. ............................... Double Fee or $100.00 plus the normal permit fee, whichever is greater Reinspection ................................................................ ............................... $100.00 per reinspection CODE INFORCEMANT SERVICE FEE Initial Service Fee ...................................................... ..............................$ 20.00 Subsequent Service Fee ................................................ ..............................$ 50.00 ROOMING HOUSE Rooming House License (Annual) ............................... ............................... ........................$100.00 plus $15.00 per bedroom Rooming House — Penalty for Late License .................................... ............................... Double Fee for late renewal or operating without a license HEATING Valuation Fee $0 to $1,000.00 ............................................................... ............................... .........................$30.00 $1,000.01 to $10, 000. 00 .................. ............................... .........................$30.00 for first $1,000.00 plus $16.00 per each additional $1,000.00 valuation or part thereof $10,000.01 to $25,000.00 ............... ............................... .......................$174.00 for first $10,000.00 plus $10.00 per each additional $1,000.00 valuation or part thereof Over $25,000.00 ...................... ............................... ........................$324.00 for the first $25,000.00 plus $5.00 per each additional $1,000.00 valuation or part thereof Plan Examination ... ............................... see WI Dept of Safety and Professional Services schedule Also see Miscellaneous Fees STORAGE TAN=KS Installation & Removal of Tanks......... see WI Dept of Safety and Professional Services schedule ELECTRICAL Valuation Fee $0 to $500.00 ..................................................... ............................... .........................$30.00 $500.01 to $1, 000. 00 ......... ............................... .........................$30.00 for the first $500.00 plus $8.00 for each additional hundred dollar valuation or part thereof $1,000.01 to $10,000.00 .................. .........................$70.00 for the first $1,000.00 plus $17.00 for each additional thousand dollar valuation or part thereof $10,000.01 to $20, 000.00 .................. ........................$223.00 for the first $10,000.00 plus $6.00 for each additional thousand dollar valuation or part thereof Over $20, 000.00 ......................... ........................$283.00 for the first $20,000.00 plus $3.50 for each additional thousand dollar valuation or part thereof Electrical License Fees (Type C, M, 5): Original............................................................. ............................... ........................ $100.00 Renewal...................................................................................... ............................... $75.00 Electrical Credential Exam ......................................... ............................... .........................$25.00 Local Electrician Credential (3 -Year Credential): New................................................................... ............................... ........................ $100.00 Renew................................................................ ............................... .........................$75.00 Annual Permits (Type M Optional Arrangement): Assessed Valuation Fee $50,000.00 or less ............................................. ............................... ........................ $100.00 $50,000.01 to $100,000.00 inclusive ................ ............................... ........................$200.00 $100,000.01 to $500,000.00 inclusive .............. ............................... ........................$300.00 $500,000.01 to $1,000,000.00 inclusive ........... ............................... ........................$400.00 $1,000,000.01 and over ..................................... ............................... ........................$500.00 Also see Miscellaneous Fees PLUMBING Fee MinimumPermit Fee ..................................................... ............................... .........................$30.00 Eachfixture: New ......................................................... ............................... ..........................$9.00 Relocated................................................ ............................... ..........................$9.00 Replaced or roughed in for future use .... ............................... ..........................$9.00 Disconnect, abandon, or capping off of lateral (each lateral ) ........................ ..........................$9.00 Sanitary or Storm Sewer connections at main in street or curb .................... .........................$50.00 Sanitary or Storm Sewers re -laid from main or curb to building or main to curb .................$50.00 Water Service connections at main in street or curb ..... ............................... .........................$50.00 Water Service re -laid from main or curb to building or main to curb .......... .........................$50.00 Water Service and Sewer repair ..................................... ............................... .........................$50.00 PrivateWells ..................................... ............................... .........................$50.00 Plan Examination ........... ............................see City of Oshkosh Plan Review Fee schedule Also see Miscellaneous Fees OfHKOIH ON THE WATER TO: Honorable Mayor and Members of the Common Council FROM: Allen Davis Community Development Director DATE: December 5, 2013 RE: Approval of Building Inspector Late Permit Fees & Plumbing Fee Schedule BACKGROUND Staff and City Council reviewed the fees as part of the budget planning. The late permit fee is based on the penalty that is charged for projects that start without the proper permits, The plumbing code change reduces the number of commercial fixtures requiring a plumbing plan review from 16 to 10 fixtures. The fees generated have been incorporated into the City's 2014 Budget. There are other references to fees in the City Code that will be relocated to the Fee Schedule, adopted by resolution. ANALYSIS The late fee increase is based on the levels of non- compliance for the homeowners or contractors not pulling permits in the City. The current double permit fee does not adequately encourage compliance. Other communities in the Fox Valley already charge the triple permit fee. Staff hopes that the increase will encourage more compliance. The triple permit fee should take effect January 1, 2014. The Plumbing Code change relates to the number of fixtures in a commercial building that would trigger a plumbing plan submittal.and City staff's review and approval. Currently, 16 fixtures require a plumbing plan submittal, review and approval. It is proposed that 10 fixtures be the trigger for a plumbing plan review, review and approval. The advantages of lowering the fixture count are: • Evidence of Plumbing Code compliance is easier when plans are drawn and reviewed. Plumbers bidding on a project have a specific plan for plumbing rather than estimating or guessing. • Inspections in the field have the plumbing plans for comparison to actual construction, showing all connections, venting, and fixtures, existing and proposed. • The plumbing in the building is memorialized for future reference so that repairs or expansions are easier and the plumbing is not hidden behind walls. Due to the bidding nature and plan design, staff recommends that the new plumbing code change take effect March 1, 2014 so that plumbers and designers can factor in the plumbing plan review fee into 2014 projects. The other language changes in the code update relocate the fees from City Code and place it in the Fee Schedule, to be adopted. The relocated fees are not changing with this code update. FISCAL IMPACT The fees will generate about $39,500. RECOMMENDATION City Council approves the fee and code changes and waives the second reading so the Late Permit Fee can go into effect January 1, 2014. Approved, W zoo;� City Manager