Loading...
HomeMy WebLinkAbout08. 13-545 DECEMBER 10, 2013 13-545 RESOLUTION (CARRIED__7-0____LOST________LAID OVER________WITHDRAWN________) PURPOSE: AWARD BID FOR CONTRACT NO. 13-17 / RIVERSIDE PARK PARKING LOT RECONSTRUCTION / VINTON CONSTRUCTION CO. / $664,666.10 INITIATED BY: TRANSPORTATION DEPARTMENT WHEREAS, the City of Oshkosh has heretofore advertised for bids for reconstruction of the Riverside Park Parking Lot; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: VINTON CONSTRUCTION CO. PO Box 1987 Manitowoc, WI 54221 Base Bid: $639,016.10 Alternate Bid #A1: $25,650.00 Total Bid: $664,666.10 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 323-1717-7216-06238 Property Fund – Parking Lot Improvements 323-1717-7216-06313 Property Fund – Parking Lot Improvements City of Oshkosh - Transportation Depa rtment ( 0 OfHKOIH ON THE WATER 926 Dempsey Trail, Oshkosh, WI 54902 (920) 232 -5342 (920) 232 -5343 fax MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Christopher Strong, P.E., Director of Transportation DATE: December 4, 2013 RE: AWARD BID FOR CONTRACT NO. 13 -17 / RIVERSIDE PARK - -- PARKING LOT RECONSTRUCTION 1 VINTON CONSTRUCTION CO. / $664,666.10 Background The Riverside Park parking lot, located on the south side of Ceape Avenue just east of the Oshkosh Convention Center, provides public parking for the convention center, the Leach Amphitheater and Riverside Park, In 2010, a consultant retained by the City assigned the lot a PASER rating of 3 for its pavement condition, noting the exposed pilings in the southern portion of the lot, pavement cracking, and drainage problems. Based on this assessment, the consultant recommended that the Riverside Lot be reconstructed. The city retained a design consulting firm (AECOM) to develop plans and bid documents for complete reconstruction of this lot. Reconstruction includes site grading, asphalt paving, storm sewer, concrete curb and gutter, concrete sidewalk, site preparation for future biofilter installation, and construction of a dumpster enclosure for use by the Convention Center. Analysis Working in conjunction with AECOM, the Department of Public Works and the Purchasing Division, a request for bids was issued for reconstruction of the lot. Due to the anticipated cost of construction, the bid was structured to provide for phased construction, with Phase 1 reconstructing the northern portion of the lot, and Phase 2 the southern portion. One bid, from Vinton Construction CO. of Manitowoc, Wl, was received. The base bid, which is for construction of Phase 1 only, was $639,016.10. This bid was reviewed by our consultant and was found to be compliant with the bid requirements. The unit costs in the bid were consistent with bids for other recent City contracts. An alternate bid item (A1) for construction of the dumpster enclosure was priced at $25,650. As completion of this enclosure is a requirement of the city's agreement with the convention center operator, it would be appropriate to include this during the reconstruction of the lot. This cost increases the bid to $664,666.10. City of Oshkosh — Department of Transportation Award, Contract No. .13 -171 Riverside Park Parking Lot Reconstruction Vinton Construction Co. ($664,666,10) The bid did not include several other items which will be necessary to satisfactorily complete Phase 1 of this project, including tipping fees for disposal of subgrade material, streetlighting poles and wiring, and landscaping. Together, these costs are estimated to add $149,000 to the project cost. With the dumpster enclosure, the total cost of construction for Phase 1 is estimated at $813,666.10. Phase 2 will be completed in subsequent years as funding becomes available. Fiscal IM pact The Property Improvements Section of the 2012, 2013 and 2014 Capital Improvements Programs allocated $2..million for the :City.Hall/SafetyBuilding parking lot project as well as other high - priority projects. To date, approximately $1,124,000 of this money has been spent or obligated. This leaves a balance of approximately $876,000 as shown in the following table. Available Funding (2012, 2013 and 2014 CIP) _ $2,000,000.00 City Hall /Safety Building Parking Lot Costs (General Fund only) $924,888.01 Riverside Park Parking Lot Costs and Obligations (to date) $ 199,137.09 Available Funds for Riverside Park Parking Lot Construction $875,974.90 The approximately $876,000 in available funds is greaterthan the approximately $814,000 estimated cost for Phase 1 construction, and leaves room for approximately 10 percent contingency on Vinton's construction bid. Recommendation I recommend award to the low bidder, Vinton Construction Co., for the amount of $664,666.10. Respectfully submitted, Approved: n /hristopher Strong, P.E. Mark A. Rohloff Director of Transportation City Manager City of Oshkosh — Department of Transportation 2 BID TAB RIVERSIDE PARK PARKING LOT RECONSTRUCTION BIDS OPENED AUGUST 19, 2013 NAMES OF BIDDERS BASE BID ALTERNATE BID Al TOTAL BID Vinton Construction Co PO Box 1987 $639,016.10 $25,650.00 $664,666.10 Manitowoc WI 54221