HomeMy WebLinkAboutPW CNT 84-08/CH OR 1 CHANGE ORDER NO. 1
TO: COLON WALLACE CONST.INC. DATED: 7-6-84
396 Ripon Road, P.O. Box 24
Berlin, WI 54923
Your present contract with the City of Oshkosh, Contract No. 84-08 9
is hereby amended and changed as follows:
( insert here work and/or materials to be added or eliminated and
the unit and/or lump sum price to be added to or deducted from the
contract. )
ADD - RENOVATION OF MENOMINEE PARK GARAGE(FORMER RIFLE RANGE BLDG.)
Remove existing 4" of sand fill for crushed
stone and install 4" of 3/4 crushed stone under
concrete floor slab. Quote is based on excess
sand being stockpiled on site .
LUMP SUM $658.00
Recce ended° C Y OF OSHKOSH
__::�� By; /
'free or or ublis Wor. s City Mai ger
/Jlp? City Cler
L
App • -d and ac =pt=de
Co. ractcr
I certify that provision has been made to pay the liability that
will accrue to the City of Oshkosh, Wisconsin, under the within
Change Order.
!7
Comp roller
roved- - to form:
" City A b y (f; 4