Loading...
HomeMy WebLinkAboutPW CNT 84-08/CH OR 1 CHANGE ORDER NO. 1 TO: COLON WALLACE CONST.INC. DATED: 7-6-84 396 Ripon Road, P.O. Box 24 Berlin, WI 54923 Your present contract with the City of Oshkosh, Contract No. 84-08 9 is hereby amended and changed as follows: ( insert here work and/or materials to be added or eliminated and the unit and/or lump sum price to be added to or deducted from the contract. ) ADD - RENOVATION OF MENOMINEE PARK GARAGE(FORMER RIFLE RANGE BLDG.) Remove existing 4" of sand fill for crushed stone and install 4" of 3/4 crushed stone under concrete floor slab. Quote is based on excess sand being stockpiled on site . LUMP SUM $658.00 Recce ended° C Y OF OSHKOSH __::�� By; / 'free or or ublis Wor. s City Mai ger /Jlp? City Cler L App • -d and ac =pt=de Co. ractcr I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. !7 Comp roller roved- - to form: " City A b y (f; 4