Loading...
HomeMy WebLinkAboutPW CNT 13-16/ CH OR 1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Fa.(920)236-5065 OJHKOJH Fax(920)236-5068 ON THE WATER November 27, 2013 Mr. Tom Ptaschinski Ptaschinski Construction, Inc. W7352 State Highway 33 Beaver Dam, WI 53916 Re: Change Order No. 1 (Final) Contract 13-16 Dear Mr. Ptachinski: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Ptaschinski Construction, Inc. regarding the abovementioned project. If you have any questions,please call our office at (920)236-5065. Sincerely, David C. Patek, P.E. Director of Public Works DCP/tit Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk(w/original) Lynn Lorenson, City Attorney(w/copy) Tara Wendt, Assistant Finance Director(w/copy) File (w/original) I:\Engineering\13-16 Cone Pavement Rehab-Koeller St\Project_Information\Contract Info\Change Orders113-16 Executed Page 1 of 1 CO#1 Ltr 11-27-13.docx TO: Ptaschinski Construction Inc. CHANGE ORDER# 1 L N AL W7352 St Hwy 33 DATED: NOVEMBER 5, 2013 Beaver Dam, WI 53916 Your present contract with the City of Oshkosh, Contract 13-16, awarded July 23, 2013, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING $9,550.98 NET DECREASE TO: SECTION II - STORM SEWER ($600.00) NET DECREASE TO: SECTION III - SANITARY SEWER ($700.00) NET INCREASE TO CONTRACT $8,250.98 Section I Section II Section III (Paving) (Storm) (Sanitary) Totals Bid Total $175,936.50 $1,360.00 $1,700.00 $178,996.50 C.O. #1 $9,550.98 ($600.00) ($700.00) $8,250.98 Contract Total $185,487.48 $760.00 $1,000.00 $187,247.48 CITY OF OSHKOSH BY: Recommended: City Man -V-k07)(iLI(')). Director of Public Works City Clerk Appr ed and accepted: S Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved asi+ form: �,,�; • ��04I A _ City Attorney Contract: 13-16 Concrete Pavement Rehabilitation-Koeller St Change Order#1 SECTION I-PAVING ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 1110 Removing curb and gutter, Linear complete as specified Feet 620 687.80 67.80 $2.00 $135.60 1120 Removing concrete and asphalt sidewalk and driveway,complete as Square specified Feet 345 330.20 -14.80 $1.00 ($14.80) 1318 8"concrete pavement removal and replacement, including sawing, pavement ties,integral curb and grading, terracing,and traffic control,complete as Square specified Yards 4,410 4,535.50 125.50 $35.85 $4,499.18 1350 Pavement ties,complete as specified Each 8 4.00 -4.00 $10.00 ($40.00) 1360 Adjust manholes and inlets,complete as specified Each 3 2.00 -1.00 $200.00 ($200.00) 1442 30"curb and gutter,8"with 6"CABC and grading, Linear complete as specified Feet 620 687.80 67.80 $20.00 $1,356.00 1510 6"concrete sidewalk/driveway/ramp with 3"CABC and grading, Square complete as specified Feet 150 173.10 23.10 $6.00 $138.60 1540 Curb ramp detectable warning field(natural/non- painted),complete as Square specified Feet 16 16.00 $25.00 1560 Drilled No.4 sidewalk tie bars,deformed,epoxy- coated, complete as specified Each 6 0.00 -6.00 $6.00 ($36.00) 1700 Sawing existing pavement, complete as specified Linear Feet 40 37.20 -2.80 $2.00 ($5.60) 1710 Sawing concrete pavement full depth,complete as Linear specified Feet 8 7.50 -0.50 $4.00 ($2.00) Page 2 of 4 Contract: 13-16 Concrete Pavement Rehabilitation-Koeller St Change Order#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 1916 4"asphaltic surface with 6" CABC and grading, Square complete as specified Yards 23 0.00 -23.00 $75.00 ($1,725.00) SECTION I-(BID ITEMS 1110-1916)-SUB-TOTALS $6,129.38 ($2,023.40) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 10000 Upcharge for high early strength concrete, Cubic complete as specified Yard 0.00 145.50 145.50 $10.00 $1,455.00 10001 Undercut soft subgrade, Cubic complete as specified Yard 0.00 114.00 114.00 $15.00 $1,710.00 10002 Furnish and install crushed aggregate base course, complete as specified Ton 0.00 228.00 228.00 $10.00 $2,280.00 ADDITIONAL WORK: C.O.#1-(ITEMS 10000-10002)-SUB-TOTAL $5,445.00 $0.00 NET INCREASE TO: SECTION I $9,550.98 SECTION II-STORM SEWER INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2858 Furnish, install,maintain, and remove Type D modified inlet protection, complete as specified Each 8 3.00 -5.00 $100.00 ($500.00) 2860 Sediment removal—Type D modified inlet protection, complete as specified Each 8 3.00 -5.00 $20.00 ($100.00) 2999 Furnish and install concrete collars,complete as specified _ Each 1 1.00 $400.00 SECTION II-(BID ITEMS 2858-2999)-SUB-TOTALS $0.00 ($600.00) NET DECREASE TO: SECTION II ($600.00) SECTION III-SANITARY SEWER ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 3114 Furnish and install external manhole chimney seal, complete as specified Each 3 2.00 _ -1.00 $500.00 ($500.00) Page 3 of 4 Contract: 13-16 Concrete Pavement Rehabilitation-Koeller St Change Order#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 3116 Furnish and install external manhole chimney seal extension,complete as specified Each 1 0.00 -1.00 $200.00 ($200.00) SECTION III-(BID ITEMS 3114-3116)-SUB-TOTALS $0.00 ($700.00) NET DECREASE TO: SECTION III ($700.00) NET INCREASE TO SECTIONS I,II,III $11,574.38 NET DECREASE TO SECTIONS I,II,III ($3,323.40) NET INCREASE TO CONTRACT: $8,250.98 Page 4 of 4