Loading...
HomeMy WebLinkAboutPW CNT 13-06/CH OR 2 DEPARTMENT OF PUBLIC WORKS — 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 (0 Ph.(920)236-5065 OJI-KOJH Fax(920)236-5068 ON THE WATER December 2, 2013 Mr. Al Dix Al Dix Concrete 500 Draper Street Kaukauna, WI 54130 RE: Contract 13-06—Change Order No. 2 (Final) Dear Mr. Dix: Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and Al Dix Concrete regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, DA-:"9° n ' " David C. Patek, P.E. 1771 l Director of Public Works DCP/tlt Enclosure: Change Order No. 2 (Final) cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, City Attorney(w/copy) Tara Wendt, Assistant Finance Director(w/copy) File (w/original) I:\Engineering113-06 Conc Sidewalk(New&Rehab)\Project_Information\Contract Info\Change Orders113-06 Executed Page 1 of 1 CO#2 Ltr 12-2-13.docx TO: Al Dix Concrete CHANGE ORDER#2 Cf 10L2 500 Draper Street DATED: November 19, 2013 Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No. 13-06, awarded March 26, 2013, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING 37,639.14 NET INCREASE TO: SECTION II - STORM SEWER 0.00 NET INCREASE TO CONTRACT $37,639.14 Section I Section II (Paving) (Storm) Totals Bid Total $322,828.50 $650.00 $323,478.50 C.O. #1 $146,600.27 $5,984.49 $152,584.76 Prev.Contract Total $469,428.77 $6,634.49 $476,063.26 C.O. #2 $37,639.14 $0.00 $37,639.14 Contract Total $507,067.91 $6,634.49 $513,702.40 CITY OF OSHKOSH BY: Recommended: City Manage I 0 ADy-)Th Director of Public Works City Clerk Ap. •ve• and accepted: ft( Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as t• form: ,141A_ApII■4, City . I - CONTRACT: 13-06 CHANGE ORDER#2 SECTION I-PAVING ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 1110 Removing curb and gutter, Linear complete as specified Feet 200.00 131.00 -69.00 $3.00 ($207.00) 1120 Removing concrete and asphalt sidewalk and driveway,complete as Square specified Feet 62825.00 67,585.85 4,760.85 $0.65 $3,094.55 1210 Borrow excavation, Cubic complete as specified Yards 5000.00 1,113.15 -3,886.85 $0.15 ($583.03) 1308 7"concrete pavement removal and replacement, including sawing, pavement ties,integral curb and grading,terracing,and traffic control,complete as specified Square Yards 293.58 397.78 104.20 $43.00 $4,480.60 1318 8"concrete pavement removal and replacement, including sawing,pavement ties, integral curb and grading,terracing,and traffic control, complete as specified Square Yards 850.00 887.09 37.09 $45.00 $1,669.05 1319 8"concrete pavement SHES removal and replacement, including sawing,pavement ties, integral curb and grading, terracing,and traffic control,complete as Square specified Yards 30.00 220.74 190.74 $47.00 $8,964.78 1350 Pavement ties,complete as specified Each 300.00 55.00 -245.00 $6.00 ($1,470.00) 1360 Adjust manholes and inlets, complete as specified Each 9.00 9.00 $200.00 1370 Terrace work,complete as Square specified Yards 4089.66 4,089.66 $4.00 1410 12"radius curb with 6" CABC and grading, Linear complete as specified Feet 75.00 35.50 -39.50 $5.25 ($207.38) 1440 30"curb and gutter,7"with 5"CABC and grading, complete as specified Linear Feet 200.00 190.00 -10.00 $20.00 ($200.00) 1460 Sidewalk curb,complete as Linear specified Feet 25.00 0.00 -25.00 $16.00 ($400.00) 1500 4"concrete sidewalk with 3"CABC and grading, Square complete as specified Feet 64650.00 52,433.67 -12,216.33 $3.29 ($40,191.73) 1502 4"concrete sidewalk with 3"CABC and grading, water department locations, complete as specified Square Feet 6500.00 6,462.83 -37.17 $6.00 ($223.02) Page 1 of 4 CONTRACT: 13-06 CHANGE ORDER#2 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 1510 6"concrete sidewalk, driveway,or ramp with 3" CABC and grading, Square complete as specified Feet 7436.46 13,096.79 5,660.33 $3.62 $20,490.39 1512 6"concrete sidewalk, driveway,or ramp with 3" CABC and grading,water department locations, Square complete as specified Feet 2500.00 3,021.66 521.66 $6.30 $3,286.46 1520 8"concrete sidewalk, driveway,or ramp,with 3" CABC and grading, Square complete as specified Feet 150.00 0.00 -150.00 $3.95 ($592.50) 1540 Curb ramp detectable warning field(natural/non- painted),complete as Square specified Feet 200.00 32.00 -168.00 $25.00 ($4,200.00) 1550 No.4 reinforcing rods, deformed,epoxy-coated, Linear complete as specified Feet 1609.00 1,609.00 $0.75 1560 Drilled No.4 sidewalk tie bars,deformed,epoxy- coated,complete as specified Each 3700.00 4,275.00 575.00 $1.00 $575.00 1580 Cold weather covering (sidewalk)-single visquine,complete as Square specified Feet 350.00 0.00 -350.00 $0.01 ($3.50) 1582 Cold weather covering (sidewalk)-double visquine),complete as Square specified Feet 200.00 0.00 -200.00 $0.01 ($2.00) 1584 Cold weather covering (sidewalk)-double visquine with 6"hay, Square complete as specified Feet 200.00 0.00 -200.00 $0.01 ($2.00) 1700 Sawing existing pavement, Linear complete as specified Feet 1100.00 3,666.90 2,566.90 $2.00 $5,133.80 1720 Profile saw cut concrete curb,complete as specified Linear Feet 25.00 0.00 -25.00 $30.00 ($750.00) 1800 Base aggregate dense,'/.", complete as specified Tons 314.27 314.27 $12.00 Page 2 of 4 CONTRACT:13-06 CHANGE ORDER#2 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 1906 4"asphaltic pavement with 10"CABC and grading, Square complete as specified Yards 1200.00 2,245.73 1,045.73 $30.00 $31,371.90 SECTION I-(BID ITEMS 1106-1906)-SUB-TOTALS $79,066.53 ($49,032.16) ADDITIONAL WORK REQUIRED: C.O.#2-SECTION I ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 10000 Additional cost to hire Sub- Contractor to pave asphalt patches with a paver,due to large increase in quantity,complete as Square specified Yards 521.94 1,668.70 1,146.76 $5.00 $5,733.80 10001 Additional costs for late season water patches for 8"concrete pavement, Square complete as specified Yards 0.00 194.03 194.03 $2.00 $388.06 10002 Additional costs for late season water patches for 7"concrete pavement, Square complete as specified Yards 0.00 104.20 104.20 $2.00 $208.40 10003 Additional cost for late season water patches for cold weather covering, Square complete as specified Yards 0.00 207.01 207.01 $1.00 $207.01 10004 Additional Traffic Control and mobilization for additional late season concrete patches, complete Lump as specified Sum 0.00 1.00 1.00 $1,000.00 $1,000.00 10005 Additional costs for late season water patches for 4"concrete sidewalk, Square complete as specified Yards 0.00 288.15 288.15 $0.10 $28.82 10006 Additional costs for late season water patches for 6"concrete sidewalk, Square complete as specified Yards 0.00 386.80 386.80 _ $0.10 $38.68 ADDITIONAL WORK: C.O.#2-(ITEMS 10000-10006)-SUB-TOTAL $7,604.77 $0.00 NET INCREASE TO: SECTION I $37,639.14 Page 3 of 4