HomeMy WebLinkAbout0158920-Building (roof, window & steps) � CITY OF OSHKOSH No 158920
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1717 SHERIDAN ST Owner REBECCA M VANRAVENSTEIN Create Date 11/21/2013
Designer Contractor PEPPLER REMODELING
Inspector Kenneth Gresser
Category 041 -Residential Roofing Plan
Type � Building � Sign � Canopy � Fence � Raze
I
Zoning R-1C Class of Const: __ Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. � Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete 0 Floating Slab 0 Pier � Other
� Concrete Block � Post 0 Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain _ Height Permit
Park Dedication #Dweiling Units 0 #Structures 0
Use/Nature 3FR/Remove&replace roofing on house&garage,front&side entrance steps, side entrance guardrails,side storm door,and replace I
of Work j1 basement window.
�
�
---- —
—
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $11,300.00 Plan Approval $0.00 Permit Fee Paid _ $112.00 Park Dedication $0.00
Issued By: � Date 11/27/2013
Final/O.P. 00/00/0000
❑ Permit Voided I Parcel Id# 1201370000
In the performance of this work I agree to perForm all work pursuant to rules governing the described construction.
While the City of Oshkosh has authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit app' ' n within an sement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure y cessary ap o Is fore starting such activity.
I have read and under nd the e m ' ne nformation.
Signature �
Date
AgenUOwner
Address W2380 COUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920-361-7731
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.