HomeMy WebLinkAboutPW CNT 83-15/CHR OR 1/Ans Const CHANGE ORDER NO. 1
TO: VANS CONSTRUCTION CO. DATED: May 3, 1984
1044 Main Street, Box 27
Wrightstown, WI, 54180
Your present contract with the City of Oshkosh, Contract No. 83-15 ,
is hereby amended and changed as follows:
( insert here work and/or materials to be added or eliminated and
the unit and/or lump sum price to be added to or deducted from the
contract. )
ADD - PART RESTROOM RENOVATIONS - MENOMINEE PARK & SOUTH PARK
1. Increase thickness of topping concrete to accomodate
existing floor irregularities add $ 209.00
2. Provide steel shapes & bolts & provide wood wall
frame required to securely anchor plumbing fixtures
to wall . Wall sleeves specified were not furnished add $2,128.00
with water closets . (8 fixtures each, Menominee & So.Parks)
3. Revise method of fastening metal door frames from
masonry anchors to solid grouted frames. Existing
masonry would not sustain anchors . add $ 510.00
4. Additional tuckpointing of masonry, and additional
painting of stone wall-caps. add $ 388.00
TOTAL ADDED BY THIS CHANGE ORDER = $3,235.00
Recpy ended : CITY OF OSH O3H
BY1 4(
Director o , City Manager
City Clerk
Approved and accepted ,
12:7 Contractor
I certify that provision has been made to pay the liability that
will accrue to the City of Oshkosh, Wisconsin, under the within
Change Order.
Comptroller
AppzTved as to form:
s�1Cu S. z
C y Attorney, (2_ :„ �,�