Loading...
HomeMy WebLinkAboutPW CNT 83-15/CHR OR 1/Ans Const CHANGE ORDER NO. 1 TO: VANS CONSTRUCTION CO. DATED: May 3, 1984 1044 Main Street, Box 27 Wrightstown, WI, 54180 Your present contract with the City of Oshkosh, Contract No. 83-15 , is hereby amended and changed as follows: ( insert here work and/or materials to be added or eliminated and the unit and/or lump sum price to be added to or deducted from the contract. ) ADD - PART RESTROOM RENOVATIONS - MENOMINEE PARK & SOUTH PARK 1. Increase thickness of topping concrete to accomodate existing floor irregularities add $ 209.00 2. Provide steel shapes & bolts & provide wood wall frame required to securely anchor plumbing fixtures to wall . Wall sleeves specified were not furnished add $2,128.00 with water closets . (8 fixtures each, Menominee & So.Parks) 3. Revise method of fastening metal door frames from masonry anchors to solid grouted frames. Existing masonry would not sustain anchors . add $ 510.00 4. Additional tuckpointing of masonry, and additional painting of stone wall-caps. add $ 388.00 TOTAL ADDED BY THIS CHANGE ORDER = $3,235.00 Recpy ended : CITY OF OSH O3H BY1 4( Director o , City Manager City Clerk Approved and accepted , 12:7 Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller AppzTved as to form: s�1Cu S. z C y Attorney, (2_ :„ �,�