HomeMy WebLinkAbout0158882-Building VOID VOID VOID � CITY OF OSHKOSH No �5ssa2
� VOID
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 638 W 9TH AVE Owner INVESTMENT PROPERT'Y SOLUTIONS LLC Create Date 11/19/2013
Designer Contractor OWNER
Inspector John Zarate
Category * 161 -Residential Raze Plan
Type � Building � Sign � Canopy � Fence � Raze I
Zoning R-2 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection 'i
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication _ #Dwelling Units 0 #Structures 0
Use/Nature SFR/Raze house and accessory structures' Because this property is subject to the pending raze order/circuit court lawsuit,additional
of Work conditions would be placed on these permits, including: 1)all demolition work must be completed within 60 days(from the date the I
Ipermit is issued);2)if all demolition work is not completed within 60 days,then the raze order will be automatically reinstated;3)no !
�existing structure may be occupied and no occupancy permit will be issued for existing structures;and,4)no building permits will be
issued for the property until all demolition work is completed.All foundations shall be removed.
I
--- — ------ - -- --�
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $37.00 Park Dedication $0.00 :
Issued By: J � Date 11/22/2013 Final/O.P. 00/00/0000
�✓ Permit Voided '�� Parcel Id#0601190000
In the perFormance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature ��,�.� � — Date !Z" � � " I �
AgenUOwner
Address Oshkosh WI 54901 - 0000 Telephone Number
* 161-Residential Raze See Chapter NR 447 of the Wisconsin Administrative Code and Notification Form 4500-113 on the DNR
Asbestos Program website;http://dnr.wi.gov/air/compenf/asbestos/.For additional i�formation on hazards present in buildings see
the Pre-Demolition Environmental Checklist at http://dnr.wi.gov/org/aw/wm/publications/anewpub/WA651.pdf
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
� CITY OF OSHKOSH No 158882
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 638 W 9TH AVE Owner INVESTMENT PROPERTY SOLUTIONS LLC Create Date 11/19/2013
Designer Contractor OWNER
Inspector John Zarate
Category * 161 -Residential Raze Plan
Type � Building � Sign � Canopy � Fence � Raze
Zoning R-2 Class of Const:
Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection I
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab 0 Pier � Other
� Concrete Block � Post � Treated Wood —_
Occupancy Permit Occupancy Fee _ $0.00 Flood Plain Height Permit
Park Dedication #Dweiling Units 0 #Structures 0
Use/Nature jSFR/Raze house and accessory structures* Because this property is subject to the pending raze order/circuit court lawsuit,additional 'I
of Work 'Iconditions would be placed on these permits, including: 1)all demolition work must be completed within 60 days(from the date the
permit is issued);2)if all demolition work is not completed within 60 days,then the raze order will be automatically reinstated;3)no I
,existing structure may be occupied and no occupancy permit will be issued for existing structures;and,4)no building permits will be '
�issued for the property until all demolition work is completed.All foundations shall be removed. '
I�
__
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $37.00 Park Dedication $0.00
Issued By: `�3'✓� Date 11/22/2013 Final/O.P. 00/00/0000
❑ Permit Voided' Parcel Id#0601190000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature ���7�� Date f�-ZZ- �
�
AgenUOwner
Address _ Oshkosh WI 54901 - 0000 _ Telephone Number
* 161-Residential Raze See Chapter NR 447 of the Wisconsin Administrative Code and Notification Form 4500-313 on the DNR
Asbestos Program website;http://dnr.wi.gov/air/compenf/asbestos/.For additional information on hazards present in buildings see
the Pre-Demolition Environmental Checklist at http://dnr.wi.gov/org/aw/wm/publications/anewpub/WA651.pdf
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.