Loading...
HomeMy WebLinkAbout0158882-Building VOID VOID VOID � CITY OF OSHKOSH No �5ssa2 � VOID OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 638 W 9TH AVE Owner INVESTMENT PROPERT'Y SOLUTIONS LLC Create Date 11/19/2013 Designer Contractor OWNER Inspector John Zarate Category * 161 -Residential Raze Plan Type � Building � Sign � Canopy � Fence � Raze I Zoning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection 'i Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication _ #Dwelling Units 0 #Structures 0 Use/Nature SFR/Raze house and accessory structures' Because this property is subject to the pending raze order/circuit court lawsuit,additional of Work conditions would be placed on these permits, including: 1)all demolition work must be completed within 60 days(from the date the I Ipermit is issued);2)if all demolition work is not completed within 60 days,then the raze order will be automatically reinstated;3)no ! �existing structure may be occupied and no occupancy permit will be issued for existing structures;and,4)no building permits will be issued for the property until all demolition work is completed.All foundations shall be removed. I --- — ------ - -- --� HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $37.00 Park Dedication $0.00 : Issued By: J � Date 11/22/2013 Final/O.P. 00/00/0000 �✓ Permit Voided '�� Parcel Id#0601190000 In the perFormance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Signature ��,�.� � — Date !Z" � � " I � AgenUOwner Address Oshkosh WI 54901 - 0000 Telephone Number * 161-Residential Raze See Chapter NR 447 of the Wisconsin Administrative Code and Notification Form 4500-113 on the DNR Asbestos Program website;http://dnr.wi.gov/air/compenf/asbestos/.For additional i�formation on hazards present in buildings see the Pre-Demolition Environmental Checklist at http://dnr.wi.gov/org/aw/wm/publications/anewpub/WA651.pdf To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. � CITY OF OSHKOSH No 158882 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 638 W 9TH AVE Owner INVESTMENT PROPERTY SOLUTIONS LLC Create Date 11/19/2013 Designer Contractor OWNER Inspector John Zarate Category * 161 -Residential Raze Plan Type � Building � Sign � Canopy � Fence � Raze Zoning R-2 Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab 0 Pier � Other � Concrete Block � Post � Treated Wood —_ Occupancy Permit Occupancy Fee _ $0.00 Flood Plain Height Permit Park Dedication #Dweiling Units 0 #Structures 0 Use/Nature jSFR/Raze house and accessory structures* Because this property is subject to the pending raze order/circuit court lawsuit,additional 'I of Work 'Iconditions would be placed on these permits, including: 1)all demolition work must be completed within 60 days(from the date the permit is issued);2)if all demolition work is not completed within 60 days,then the raze order will be automatically reinstated;3)no I ,existing structure may be occupied and no occupancy permit will be issued for existing structures;and,4)no building permits will be ' �issued for the property until all demolition work is completed.All foundations shall be removed. ' I� __ HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $37.00 Park Dedication $0.00 Issued By: `�3'✓� Date 11/22/2013 Final/O.P. 00/00/0000 ❑ Permit Voided' Parcel Id#0601190000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Signature ���7�� Date f�-ZZ- � � AgenUOwner Address _ Oshkosh WI 54901 - 0000 _ Telephone Number * 161-Residential Raze See Chapter NR 447 of the Wisconsin Administrative Code and Notification Form 4500-313 on the DNR Asbestos Program website;http://dnr.wi.gov/air/compenf/asbestos/.For additional information on hazards present in buildings see the Pre-Demolition Environmental Checklist at http://dnr.wi.gov/org/aw/wm/publications/anewpub/WA651.pdf To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.