HomeMy WebLinkAboutMarino Consturction/CHG OR G-3/Grand Opera House yarbro - kempinger architects, inc. 1018 W. SOUTH PARK AVENUE • POST OFFICE BOX 2096 • OSHKOSH,WISCONSIN 54903 • 414/235-3310 6 March 1984 Mr. James Marino Marino Construction Co. , Inc. 3620 South Clement Avenue Milwaukee, Wisconsin 53207 RE: File 8133/79005 - Phase II Restoration and Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin Jim: We have reviewed your revised cost breakdown for Change Estimate No. 4 and have come to the following conclusions. Breakdown - Page 1 1. You omitted 38 sq. ft. of brick work above the window and added 38 L.F. of stone cap. There is no additional stone cap as such. There is some 14 or less feet of stone (over the entrance and where the stone covers corbelled brick at each end pier. ) Somehow the credit for omitting the 38 sq.ft. of brick doesn't show up but your cost out $48 . 00 material and $480. 00 labor. We would recommend the $480. 00 labor if you credited $654 . 00 for the omission of the brick Proposed Credit $ 174 . 00 2 . Your charge out $100. 00 material and $300. 00 labor for removing 3 pipe columns and 16 L.F. of steel beams. Removal of one pipe column was included in your original proposal and the installation of WF 12x26 which is now omitted. We could recommend an even exchange between omitted work and newly required steel work Proposed Credit $ 400. 00 Page 2 6 March 1984 Mr. James Marino RE: File 8133/79005 - Phase II Restoration and Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin 3. Carpentry Work - Studs: We figure about 80 L.F. more studs. We could recommend $80. 00 for materials and $135. 00 for labor Proposed Credit $ 585.00 - Insulation: We are not aware that insulation work changed Proposed Credit $ 48 . 00 - Parapet Blocking : This work did not change Proposed Credit $ 200. 00 - Omit original 3/4" plywood soffit Proposed Credit $ 128 . 00 - Finish Labor: Install 160 S.F. of pine boards on walls and soffits. Install larger windows and related trim, we think $720. 00 is adequate. That is about $3. 00/S.F. Proposed Credit $1, 689. 00 - Supervision: We maintain that no extra supervision is involved to provide the revised building face in lieu of the original design Proposed Credit $ 944 . 00 4 . Subcontract Work - Pine Boards: We think there is only about 160 sq.ft. of pine boards. At $. 50/sq. ft. , that is $80. 00 instead of your $1, 009 (subcontractor price) Proposed Credit $ 929. 00 Page 3 6 March 1984 Mr. James Marino RE: File 8133/79005 - Phase II Restoration and Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin - Stone: The only stone added was the stone over corbelled brick over the entrance and at the east and west pier recon- struction at first floor ceiling line (approximately) . By quantity, the added stone should be about $300. 00 Proposed Credit $1, 086. 00 - Painting : Extra painting work, boards plus the added window height should be no more than $250. 00 Proposed Credit $ 250. 00 5. Sales Tax Credit 1354 x 5% $ 67.70 Proposed Credits $3,491. 70 Profit & Overhead-15% 523 . 76 $4 , 015. 46 1% Bond 40.15 Proposed Total Credit $4, 055. 61 Your Proposal $12, 064.33 Less our Proposed Credit 4, 055. 61 Proposed Change Estimate No. 4 $ 8, 008 .72 Your response prior to the March 13 Meeting is requested. Sincerely, YARBRO-KEMPINGER ARCHITECTS, INC. by Robert L. Yarbro RLY/mh c : Mrs. Lynne Webster Ms. Catherine Porter Mark F. Pfaller II yarbro - kempinger architects, inc. 1018 W. SOUTH PARK AVENUE • POST OFFICE BOX 2096 • OSHKOSH, WISCONSIN 54903 • 414/2354310 6 March 1984 Mr. James Marino Marino Construction Co. , Inc. 3620 South Clement Avenue Milwaukee, Wisconsin 53207 RE: File 8133/79005 - Phase II Restoration and Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin Jim: We have reviewed your cost breakdown for Charge Estimate No. 7 and have come to the following conclusion. 1. The following items were included in the original work. Material Labor Total - Remove coping $11. 40 $103. 50 $115. 00 - Wood Nailers 48 . 00 216. 00 264 .00 - Bolts 10. 00 30. 00 40. 00 - 3/4 " Plywood 12 . 00 36. 00 48 . 00 Proposed Credit $467. 00 2. Brick West Side - 460 brick @ $1. 70/brick = $ 782 . 00 East Side - 575 brick @ $1. 70/brick = 977 . 50 $1,759. 50 Your cost of $3, 881. 25 less $1. 759. 50 Proposed Credit $2,122. 25 3. Supervision 21 hours in lieu of 10 hours Proposed Credit $ 177 . 00 Page 2 6 March 1984 Mr. James Marino RE: File 8133/79005 - Phase II Restoration and Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin 3. Flashing 23 L.F. X $10.00/L.F. in lieu of $41.30/L.F. Proposed Credit $ 720. 00 4 . Omit Dumpster and Trucking Proposed Credit $ 123. 00 5. Adjust Sales Tax $338 . 50 X 5% Proposed Credit $ 16, 93 Proposed Credit $3, 626.18 Profit & Overhead 543. 93 $4 ,170. 11 1% Bond 41 . 70 Total Proposed Credit $4, 211. 81 Your Proposal $8, 813. 96 Less our Proposed Credit 4,170.11 Proposed Charge Estimate No. 7 $4 , 643. 85 Your response prior to the March 13 Meeting is requested. Sincerely, YARBRO-KEMPINGER ARCHITECTS, INC. by Robert L. Yarbro RLY/mh c : Mrs. Lynne Webster Ms. Catherine Porter Mark F. Pfaller II yarbro kempinger architects, inc. -- 1018 W. SOUTH PARK AVENUE • POST OFFICE BOX 2096 • OSHKOSH, WISCONSIN 54903 • 414/235-3310 CHANGE ORDER NO. G-3 OWNER'S COPY FILE NO. 8133/79005 - Phase II CONTRACTOR'S COPY DATE 11 April 1984 ARCHITECT'S COPY The City of Oshkosh OWNER 215 Church Avenue, Oshkosh, Wisconsin 54901 Marino Construction Company, Inc. CONTRACTOR 3620 South Clement Avenue, Milwaukee, Wisconsin 53207 General Construction Work, Phase II, Restoration and CONTRACT FOR Rehabilitation, The Grand Opera House, City of Oshkosh, WI IT IS HEREBY AGREED THE FOLLOWING CHANGE IN THE WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE ATTACHED PROPOSAL AND SUBJECT TO TERMS OF THE ORIGINAL CONTRACT DATED September 15, 1983 SEE ATTACHMENT FOR THE SUM OF (ADD - 0EXJ7 TWELVE THOUSAND STX HTTNITRED FIFTY TWO AND 57/100THS DOLLARS ($ 12 , 652 . 57 ADD DEDUCT ORIGINAL CONTRACT 476 , 944 . 00 PRIOR TO EXTRA ORDERS THIS ORDER 30 ,474 . 33 NONE 43 ,126 . 90 THIS ORDER 12 , 652 . 57 NONE CREDIT ORDERS NONE TOTAL TO DATE 43 ,126. 90 NET TOTAL TO DATE 520, 070. 90 APPROVED ACCEPTED / YARBRO-KEMPINGER, ARCHITECTS CITY OF HKOSH, AISCONSIN PFALL R ERB ASSOCIATES , INC. / BY 7,....�_ ---'y� .pager BY ' ' L' ) �f ACCEP ED erk 7 Approvedias to y6rm, MARINO CONSTRUCTION COMPANY, INC. BY i - E,_ (le . .rney I ' = certi "� _ ''e essary j` BY -'49412,,.� '� //G 40 44i provisions have been made to pay the liability that will accrue under this col tract irl CitV l rarnf--ml 1 or ATTACHMENT Change Order No. G-3 Marino Construction Co. , Inc 11 April 1984 RE: File 8133/79005-Phase II Restoration & Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin ITEM NO. 1 Change the Annex south wall work as defined and required by Architect's Drawings , Sheets A-128 and A-129 , dated 5 December 1983 , copy attached, and as agreed between the Owner and Contractor on 10 April 1984 , based on Yarbro-Kempinger/ Pfaller Herbst Associates letter of 6 March 1984 , copy attached, on Change Estimate No. 4 . ADD $ 8 ,008 . 72 ITEM NO. 2 Revise Masonry Work, Annex parapet walls as shown and required by Architect's Drawing Sheet A-132 , dated 24 January 1984 , copy attached, and as agreed between the Owner and Contractor on 10 April 1984 , based on Yarbro-Kempinger/Pfaller Herbst Associates letter of 6 March 1984 , copy attached, on Marino's Change Estimate No. 7 . ADD 4 ,643 . 85 ITEM NO. 3 See Supplementary Conditions , Article 30 , Paragraph C and the Contract, Article 3 . Change the Substantial Completion date from June 29 , 1984 to August 28, 1984 at no change in Contract Amount. No Change NET CONTRACT CHANGE, ADD $12 ,652 .57