HomeMy WebLinkAbout21770-Plumbing (no permits) 11/18/2013 CITY OF OSHKOSH INSPECTION SERVICES DIVISION ROOM 205 �
215 CHURCH AVE DEPARTMENT OF COMMUNITY DEVELOPMENT
PO Box 1130 CORRECTION NOTICE OSHKOSH
OSHKOSH WI 54903-1130 ON THE WATER
Issue Date 11/18/2013 Re Issue Date Complies No
Address 400 FOX FIRE DR
Sent to ✓ Owner BENJAMIN G WARNCKE 400 FOX FIRE DR OSHKOSH WI 54904 -6580
Required for Occupancy j Occupancy Single Family
Introduction The following violations were noted at the water meter inspection.
Item# 1 Code SPS 382.41(2)(a) Complies No Comply By 12/18/2013
Description Types of cross connection control. Water supply systems shall be protected against contamination due to cross connections or
backflow conditions by one of the methods or devices specified in Table 382.41-1 depending upon the situation or Table
382.41-2 depending upon the specific application or use,and the limitations specified in sub. (4). ***CROSS CONNECTION
PROTECTION IS REQUIRED TO BE INSTALLED ON THE IRRIGATION SYSTEM"** :
Item# 2 Code SPS 382.40(3)(d) Complies No Comply By 12/18/2013
Description The installation of each testable cross connection control device shall display a department assigned identification number.
The tag shall be weather resistant, securely attached to the cross connection control assembly. *"*CROSS CONNECTION
DEVICE NEEDS TO BE REGISTERED WITH THE STATE AND TAGGGED PER CODE***
Item# 3 Code SPS 382.20(1)(c) Complies No Comply By 12/18/2013
Description Cross connection control assembly registration.The installation of each reduced pressure principle backflow preventer,
reduced pressure fire protection principle backflow preventer, spill resistant vacuum breaker, reduced pressure detector fire
protection backflow prevention assembly or pressure vacuum breaker shall be registered with the department no later than 7
days after installation of the assembly
Item# 4 Code MUN 20-8 Complies No Comply By 12/18/2013
Description No person shall perform or permit the performance of any plumbing work, as defined by state statute or regulation adopted by
reference as a part of this Code, unless a permit is first obtained. "`"PERMIT IS REQUIRED TO INSTALL CROSS
CONNECTION PROTECTION TO THE IRRIGATION SYSTEM"""
21770 Page 1 of 2
Item# 5 Code STATS 145.06 Complies No Comply By 12/18/2013
Description No person may engage in or work at plumbing in the state unless licensed to do so by the department. *""A LICENSED
CONTRACTOR IS REQUIRED TO INSTALL THE CROSS CONNECTION DEVICE PER CODE'*"
Summarv Please correct the above violations and request a re-inspection within the ne�6 months. Office hours are Monday-Friday
7:30am-4:30pm. If you have questions feel free to contact me at 236-5052.This work shall be completed before the start up
of the irrigation system for next year.
Violations must be corrected and approved by the noted compliance dates of each item. Call for reinspections prior to concealment
and/or occupancy. Upon completing the corrections,the owner/contractor/agent must sign and date at the bottom of this notice
and return it to the Inspection Services Division by the Compliance Date of 12/18/2013
Office hours are Monday through Friday 7:30 a.m. -4:30 p.m.or by appointment.To schedule inspections please call the Inspection
Request line at 23 28 notin e �res , permit number(when applicable),and the nature of what needs to be inspected.
Signature Date � � �
Insp ted by Jerry Fabisch 236-5052 JFabisch@ci.oshkosh.wi.us
I hereby certify the violations listed on this report have been corrected in compliance with the applicable codes. :
Print Name Company
Signature Date
Also Sent to: Bldg -
Elec ', - -- -- _
HVAC I - -- - ---------- --- — _ -
Plbg -
Designer --- —---- — -- "--
Other — ------ — --
Inspector
21770 Page 2 of 2