Loading...
HomeMy WebLinkAbout09. 13-510 NOVEMBER 26, 2013 13-510 RESOLUTION (CARRIED___7-0___ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT NO. 13-06 WITH AL DIX CONCRETE, INC. FOR CONCRETE SIDEWALK – NEW AND RECONSTRUCTION (+$37,639.14) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: AL DIX CONCRETE, INC. 500 Draper Street Kaukauna, WI 54130 Net Increase to contract: $37,639.14 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 311-0410-7480-00000 Sidewalk Construction Fund 317-0410-7480-03304 Special Assessments Fund – Sidewalks 541-1867-6401-08673 Water Utility – Maintenance of Mains 541-1867-6401-08675 Water Utility – Maintenance of Services 561-2010-1799-00000 Storm Water Utility – Construction in Progress OIHKOIH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public WorksJ DATE: November 21, 2013 RE: Change Order No. 2 for Public Works Contract No. 13-06 / Concrete Sidewalk-New & Reconstruction /Al Dix Concrete, Inc. (+$37,639.14) BACKGROUND Change Order No. 2 for Contract 13-06 is scheduled for consideration by the Common Council at the November 26, 2013 meeting. The contract was originally awarded to Al Dix Concrete, Inc. in March of 2013. This final change order is for final quantities and for additional services provided. ANALYSIS Following is a summary of the significant changes to each section of the Capital Improvement Program (CIP) and the Water Utility Operating Budget: • CIP-Sidewalk— Based on review of potential city liability, it was determined that correction of defective private driveway approaches needed to be included in this contract. The scope of work involved with the private driveway approaches was not known at the time of bidding. The result was a large overage in Bid Items #1510 (6" concrete driveway) and #1906 (asphalt pavement). Additionally, an asphalt paving machine was required to be used on the larger driveway repairs. This resulted in an increased unit price for this work. • Water Utility Operating Budget/CIP-Street — The Water Department had some water break patches which needed to be finished prior to the winter season to minimize maintenance. Bid Items #1308, #1318, #1319, and #1512 (concrete pavement and concrete sidewalk) are actual quantities installed and are actually only a slight increase over similar work that had been done in the previous year. Due to this work being completed in the recent cold weather, a surcharge for hot water from the concrete plants increased the price of the concrete by $2.00 per square yard for concrete pavement and $0.10 per square foot for concrete walk and driveway. This cost increases are reflected in Bid Items #10001 through #10006. FISCAL IMPACT Funding for the project is included in the 2013 CIP Sections for Street & Sidewalk Construction. The remaining funding will be through the Water Utility Operating Budget. The additional services provided for the Sidewalk Section of the CIP will be billed to the adjoining property owner's per the Municipal Code. CIP Street Section funding is available from street reconstruction projects coming in under budget. Budget Section Change Order Amount New Contract Total Funding CIP-Sidewalk $17,367.28 $380,571.64 $350,000.00 Water Utility Operating/ Street Patch $20,271.86 $129,105.80 (See Note) $129,105.80 CIP-Street $0.00 $4,024.96 $4,024.96 _Total $37,639.14 $513,702.40 $483,130.76 Note: Water Utility Operating Budget contains $774,000 for maintenance of mains and services. The $129,105.80 needed for repairing concrete pavement is part of this maintenance budget. RECOMMENDATIONS I recommend approval of Change Order No. 2 to Contact No. 13-06 in the amount of +$37,639.14 to Al Dix Concrete, Inc. Approved: Mark A. Rohloff City Manager SMG/tlt I:1Engineering113-06 Conc Sidewalk(New&Rehab)1Project Information\CorrespondencelMemo113-06 CO#2 Memo_11-21-13.docx TO: Al Dix Concrete CHANGE ORDER#2 500 Draper Street DATED: November 19, 2013 Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No. 13-06, awarded March 26, 2013, is hereby amended and changed as follows: NET INCREASE TO: SECTION I - PAVING 37,639.14 NET INCREASE TO: SECTION II - STORM SEWER 0.00 NET INCREASE TO CONTRACT $37,639.14 Section I Section II (Paving) (Storm) Totals Bid Total $322,828.50 $650.00 $323,478.50 C.O. #1 $146,600.27 $5,984.49 $152,584.76 Prev.Contract Total $469,428.77 $6,634.49 $476,063.26 C.O. #2 $37,639.14 $0.00 $37,639.14 Contract Total $507,067.91 $6,634.49 $513,702.40 CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 13-06 CHANGE ORDER#2 SECTION I-PAVING ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 1110 Removing curb and gutter, Linear complete as specified Feet 200.00 131.00 -69.00 $3.00 ($207.00) 1120 Removing concrete and asphalt sidewalk and driveway, complete as Square specified Feet 62825.00 67,585.85 4,760.85 $0.65 $3,094.55 1210 Borrow excavation, Cubic complete as specified Yards 5000.00 1,113.15 -3,886.85 $0.15 ($583.03) 1308 7"concrete pavement removal and replacement, including sawing,pavement ties,integral curb and grading,terracing,and traffic control,complete as specified Square Yards 293.58 397.78 104.20 $43.00 $4,480.60 1318 8"concrete pavement - - - removal and replacement, including sawing,pavement ties, integral curb and grading,terracing,and traffic control,complete as specified Square Yards 850.00 887.09 37.09 $45.00 $1,669.05 1319 8"concrete pavement SHES removal and replacement, including sawing,pavement ties, integral curb and grading, terracing, and traffic control,complete as Square specified Yards 30.00 220.74 190.74 $47.00 $8,964.78 1350 Pavement ties,complete - - - - as specified Each 300.00 55.00 -245.00 $6.00 ($1,470.00) 1360 Adjust manholes and inlets, complete as specified _ Each 9.00 9.00 $200.00 1370 Terrace work,complete as Square specified _ Yards 4089.66 4,089.66 $4.00 1410 12"radius curb with 6" - - -CABC and grading, Linear complete as specified Feet 75.00 35.50 -39.50 $5.25 ($207.38) 1440 30"curb and gutter, 7"with 5"CABC and grading, complete as specified Linear Feet 200.00 190.00 -10.00 $20.00 ($200.00) 1460 Sidewalk curb,complete as Linear specified Feet 25.00 0.00 -25.00 $16.00 ($400.00) 1500 4"concrete sidewalk with 3"CABC and grading, Square complete as specified Feet 64650.00 52,433.67 -12,216.33 $3.29 ($40,191.73) 1502 4"concrete sidewalk with 3"CABC and grading, water department locations, complete as specified Square Feet 6500.00 6,462.83 -37.17 $6.00 ($223.02) Page 1 of 4 CONTRACT:13-06 CHANGE ORDER#2 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 1510 6"concrete sidewalk, driveway,or ramp with 3" CABC and grading, Square complete as specified Feet 7436.46 13,096.79 5,660.33 $3.62 $20,490.39 1512 6"concrete sidewalk, driveway,or ramp with 3" CABC and grading,water department locations, Square complete as specified Feet 2500.00 3,021.66 521.66 $6.30 $3,286.46 1520 8"concrete sidewalk, driveway,or ramp,with 3" CABC and grading, Square complete as specified Feet 150.00 0.00 -150.00 $3.95 ($592.50) 1540 Curb ramp detectable warning field(naturaVnon- painted),complete as Square specified Feet 200.00 32.00 -168.00 $25.00 ($4,200.00) 1550 No.4 reinforcing rods, deformed,epoxy-coated, Linear complete as specified Feet 1609.00_ 1,609.00 $0.75 1560 Drilled No.4 sidewalk tie bars, deformed,epoxy- coated,complete as specified Each 3700.00 _ 4,275.00 575.00 $1.00 $575.00 1580 Cold weather covering (sidewalk)-single visquine, complete as Square specified Feet 350.00 0.00 -350.00 $0.01 ($3.50) 1582 Cold weather covering (sidewalk)-double visquine),complete as Square specified Feet 200.00 0.00 -200.00 $0.01 ($2.00) 1584 Cold weather covering (sidewalk)-double visquine with 6"hay, Square complete as specified Feet 200.00 0.00 -200.00 $0.01 ($2.00) 1700 Sawing existing pavement, Linear complete as specified Feet 1100.00 3,666.90 2,566.90 $2.00 $5,133.80 1720 Profile saw cut concrete curb,complete as specified Linear Feet 25.00 0.00 -25.00 $30.00 ($750.00) 1800 Base aggregate dense,3/4", complete as specified Tons 314.27 314.27 $12.00 Page 2 of 4 CONTRACT:13-06 CHANGE ORDER#2 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 1906 4"asphaltic pavement with 10"CABC and grading, Square complete as specified Yards 1200.00 2,245.73 1,045.73 $30.00 $31,371.90 SECTION I-(BID ITEMS 1106-1906)-SUB-TOTALS $79,066.53 ($49,032.16) ADDITIONAL WORK REQUIRED: C.O.#2-SECTION I ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 10000 Additional cost to hire Sub- Contractor to pave asphalt patches with a paver,due to large increase in quantity,complete as Square specified Yards 521.94 1,668.70 1,146.76 $5.00 $5,733.80 10001 Additional costs for late season water patches for 8"concrete pavement, Square complete as specified Yards 0.00 194.03 194.03 $2.00 $388.06 10002 Additional costs for late season water patches for 7"concrete pavement, Square complete as specified Yards 0.00 104.20 104.20 $2.00 $208.40 10003 Additional cost for late season water patches for cold weather covering, Square complete as specified Yards 0.00 207.01 207.01 $1.00 $207.01 10004 Additional Traffic Control and mobilization for additional late season concrete patches,complete Lump as specified Sum 0.00 1.00 _ 1.00 $1,000.00 $1,000.00 10005 Additional costs for late season water patches for 4"concrete sidewalk, Square complete as specified Yards 0.00 288.15 288.15 $0.10 $28.82 10006 Additional costs for late season water patches for 6"concrete sidewalk, Square complete as specified Yards 0.00 386.80 386.80 $0.10 $38.68 ADDITIONAL WORK: C.O.#2-(ITEMS 10000-10006)-SUB-TOTAL $7,604.77 $0.00 NET INCREASE TO: SECTION I $37,639.14 Page 3 of 4